class V1 · owner of record: Myrtle 6 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 8, 2026 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF THE 9-STORY NEW BUILDING, I OBSERVED ACTIVE CONSTRUCTION, SUPPORTED PIPE SCAFFOLDING ERECTING AT ALL EXPOSURES, INCLUDING THE COURTYARD. UPON REVIEW OF THE APPROVED SCAFFOLD PLAN #39560416M | Dec 16, 2026 PENDING | $2,500 |
| Sep 12, 2026 | Unknown CLASS - 2 BC3314.1 OBSERVED SUPPORTED SCAFFOLD INSTALLED ALL EXPOSURES NOT MAINTAIN AS PER CODE. SCAFFOLD NOT FULLY PLANKED, PLANKS LOOSE NOT TIED DOWN / SECURED. DEBRIS NETTING LOOSE/MISSING NOT SECURELY FASTENED TO FAC #39559109Y | Nov 18, 2026 PENDING | $2,500 |
| Sep 12, 2026 | Unknown CLASS - 2 BC3303.3 WATCHPERSON 9 STORY NEW BUILDING, BUILDING APPROXIMATELY 9931 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATCHPE #39559108M | Nov 18, 2026 PENDING | $2,500 |
| Sep 10, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ASNOTED AT THE TIME OF INSPECTION, OF A PROPOSED 9 STORY NEW BUILDING, ACTIVELY PLACING CONCRETE ON THE 9TH FLOOR. I OBSERVED 9 STORY NEW BUIL #35730898H | Nov 18, 2026 PENDING | $1,250 |
| Sep 10, 2026 | Construction CLASS - 1 BC-3305.3.6.1.2. FAILURE TO SECURE RESHORING POST IN PROXIMITY TO UNENCLOSED PERIMETERS:-AS NOTED AT THE TIME OF INSPECTION OF A PROPOSED 9 STORY NEW BUILDING ACTIVELY PLACING CONCRETE ON 9TH FLOOR SLAB 9 FLOOR #35730269P | Dec 16, 2026 PENDING | $2,500 |
| Sep 10, 2026 | Construction CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS:-AS NOTICED AT THE TIME OF INSPECTION OF A PROPOSED 9 STORY NEW BUILDING ACTIVELY PLACING CONCRETE ON THE 9TH FLOOR SLAB, 8-9 FLOOR SW #35730250P | Nov 18, 2026 PENDING | $1,250 |
| Sep 10, 2026 | Plumbing CLASS - 2 FAILURE TO PROVIDE SPECIAL INSPECTION OF CONCRETE PLACEMENT TR1. AS NOTED AT THE TIME OF INSPECTION OF A PROPOSED 9 STORY NEW BUILDING ACTIVELY PLACING CONCRETE ON 9TH FLOOR SLAB, 8-9 FLOOR SHEAR WALLS AND COLU #35730251R | Nov 18, 2026 PENDING | $1,250 |
| Aug 24, 2026 | Unknown CLASS - 2 BC 3307.2.1 AT TIME OF INSPECTION OBSERVED: CONTRACTOR POURING CONCRETE AT 5TH FL. DECK LEVEL AT 8:25 AM APPROX. CONTRARY TO DOT PERMIT# B64 STIPULATION 072 AND PERMIT# B68 STIPULATION 072 AS WELL, CREATING UNS #39558252M | Jan 6, 2027 PENDING | $2,500 |
| Aug 19, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED: UNSAFE MATERIAL DELIVERY. SCAFFOLD EQUIPMENT BEEN UNLOAD FROM TRUCK AND STORAGE ON TOP OF SIDEWALK SHED, CREATING UNSAFE CONDITIONS FOR PUBLIC AND PROPERTY, USING SCAFFOLD CONTRA #39558116H | Jan 6, 2027 PENDING | $5,000 |
| Aug 13, 2026 | Unknown CLASS - 2 BC 3307.2.1 AT TIME OF INSPECTION OBSERVED: CONTRACTOR PREPARING TO RECEIVE MATERIAL DELIVERY OPERATIONS USING KNUCKLE BOOM AT EXPO#3 FULLY BLOCKING SIDEWALK UPON REQUEST FOR DOT PERMIT, NONE WAS PROVIDED CREAT #39557896N | Jan 4, 2027 | $2,500 |
| Aug 13, 2026 | Unknown CLASS - 2 AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED/OVERHEAD PROTECTION AT EXPOSURE 1 NO MIRRORS AT LOCATIONS WHERE PEDESTRIANS VIEW IS OBSTRUCTED BY COLUMNS AT SIDEWALK AREA CONTRARY TO BC 3307.2.6 NUMERAL 3 VEHICLE #39557897P | Jan 4, 2027 | $2,500 |
| Jul 30, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED: CONCRETE OPERATIONS AT EXPO# 3 CONTRACTOR FAILURE TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES AT EXPOSURE# 1. CONCRETE WASTE SCATTERED ON ROADWAY, CREATING AN UNSAFE AND #39557324H | Dec 7, 2026 PENDING | $2,500 |
| Jul 30, 2026 | Construction CLASS - 2 BACKFLOW PREVENTION. AT THE TIME OF INSPECTION, I OBSERVED FIRE HYDRANT BEING USED, HOSE CONNECTED GOING TO CONSTRUCTION SITE WITHOUT A BACKFLOW PREVENTER VALVE CONTRARY TO BC 15 RCNY 20-04. FAILURE TO PROVIDE #39557323X | Dec 7, 2026 PENDING | $1,250 |
| Jul 30, 2026 | Unknown CLASS - 2 BC 3307.2.1 AT TIME OF INSPECTION OBSERVED: MATERIAL DELIVERY OPERATIONS USING KNUCKLE BOOM AT EXPO#1 CONTRARY TO DOT STIPULATIONS PERMIT# B69 USING MORE THAN 8' OF ROADWAY. CONCRETE OPERATIONS AT EXPO# 3 FULLY #39557321M | Dec 7, 2026 | $2,500 |
| Jul 30, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION OBSERVED: MATERIAL DELIVERY OPERATIONS USING KNUCKLE BOOM AT EXPO#1 AND CONCRETE OPERATIONS AT EXPO# 3 INADEQUATE STAGE WORK ZONE, PLASTIC BARRIERS SYSTEM CONTRARY TO MANUFACTURER SPECIFIC #39557322Y | Dec 7, 2026 | $2,500 |
| Jul 9, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION OBSERVED: PEDESTRIAN WALKWAY NOT MAINTAINED/INADEQUATE 3 INCHES CRACK AND UNEVEN SURFACE SIDEWALK AT EXPOSURE# 1 CONTRARY TO BC 3303.4.1.1 CREATING POTENTIAL TRIPPED HAZARDOUS CONDITIONS F #39556563K | Nov 23, 2026 | $5,000 |
| Jul 9, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION OBSERVED: CONTRACTOR FAILURE TO INSTITUTE SAFETY MEASURES INADEQUATE/MISSING CONTENT ON PRE-SHIFT SAFETY MEETING, NO MENTION ABOUT SPECIFIC/ GENERAL WORK TASK HAZARDOUS AND PREVENTION ON S #39556562Z | Nov 23, 2026 | $5,000 |
| Jul 9, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OBSERVED: PROPOSED 9 STORY NB. AT EXPOSURE# 1 INADEQUATE STORAGE ZONE, PLASTIC BARRIERS SYSTEM CONTRARY TO MANUFACTURER SPECIFICATIONS, MISSING INTERLOCKING COUPLERS, NOT WATER FILLED, CO #39556580M | Nov 23, 2026 PENDING | $1,250 |
| May 17, 2026 | Construction CLASS - 1 WORK AFTER HOURS WITHOUT A VARIANCE PERMIT CONTRARY TO 28-105.12.5. ASNOTED: AT TIME OF INSPECTION OBSERVED 4 WORKERS DOING STRIPPING AND CONCRETE OPERATIONS ON A SUNDAY WITHOUT A AFTER HOURS VARIANCE PERMIT. S #35728130H | Nov 9, 2026 | $2,500 |
| May 13, 2026 | Unknown CLASS - 2 NOTE: AT TIME OF INSPECTION OF A ACTIVE CONSTRUCTION SITE WITH ON GOING EXCAVATION WORK, I OBSERVED A CONSTRUCTION OFFICE TRAILER PARKED IN FRONT OF THE ADJACENT BUILDING (869 PARK AVENUE) CONTRARY TO PERMIT WI #39554080R | Nov 9, 2026 | $2,500 |
| Feb 16, 2026 | Construction CLASS - 1 UNLAWFULLY CONTINUED WORK WHILE ON NOTICE OF A STOP WORK ORDER. AT THETIME OF INSPECTION OF A PROPOSED (9)STORY (30)DWELLING UNIT BUILDING, ACTIVE CONSTRUCTION WAS OBSERVED WITH WORKERS DRILLING AND INSTALLING #39550399K | Mar 1, 2027 | $10,000 |
| Feb 16, 2026 | Construction CLASS - 2 JOB SITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION. AT THE TIME OF INSPECTION OF A PROPOSED (9)STORY, (30) DWELLING UNIT BUILDING, THE JOB SITE LACKED REQUIRED CONSTRUCTION FENCING AT EXPOSURE #39550398Z | Mar 1, 2027 | $1,000 |
| Jan 19, 2026 | Unknown CLASS - 1 FAILURE TO SAFEGAURD PUBLIC AND PROPERLY. AT TIME OF INSPECTION OBSERVED PREMISES UNDER ACTIVE DEMOLITION OBSERVED PERMIT WHERE AT EXP #4 DEBRIS(BRICKS, STONES ETC.) ROLLING ONTO ADJACENT PROPERTY FRONT YARD. R #35668442P | Dec 3, 2026 | $5,000 |
| Jan 13, 2026 | Unknown CLASS - 2 AT THE TIME OF INSPECTION I OBSERVED PLASTIC PEDESTRIAN VEHICULAR TRAFFIC BARRICADES IN USE AT EXPOSURE 1 CONTRARY TO MANUFACTURERS SPECIFICATIONS, MISSING INTERLOCKING DEVICES AND NOT FILLED WITH EITHER WATER #39549100Z | Dec 3, 2026 | $2,500 |
| Dec 30, 2025 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED TWO INOPERATIVE SWS LIGHT FIXTURES CREATING INSUFFICIENT ILLUMINATION AT PEDESTRIAN WALKWAY. FAILURE TO MAINTAIN SAFETY LIGHTING POSES TRIPPING AND VISIBILITY HAZARDS TO PUBLIC. #39548571K | Nov 16, 2026 | $2,400 |
| Dec 9, 2025 | Unknown CLASS - 1 AT TIME OF INSPECTION, APPROVED DEMOLITION DRAWINGS NOT PROVIDED DURING WALK THROUGH. NO APPROVED PLANS FOR SITE SAFETY FULL DEMOLITION MAINTAINED ON SITE. ECB ISSUED FOR FAILURE TO PROVIDE COPIES OF CONSTRUCTI #39169836R | Mar 22, 2027 | $5,000 |
| Dec 9, 2025 | Construction CLASS - 1 AT TIME OF INSPECTION, OBSERVED SIDEWALK SHED NOT CONFORMING TO PLANS. PLANS DETAIL ON EXPOSURE 1 (SECTION A) A SIDEWALK SHED WITH NO RAISED OVERHEAD PROTECTION TO A LOT FOR A DRIVEWAY SPACE. ECB ISSUED AS SIDE #39169820M | Mar 22, 2027 | $2,500 |
| Dec 9, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION, OBSERVED CONSTRUCTION SUPERINTENDENT FAILING TO PERFORM DUTIES. SUPER IS NOT ONSITE, AND SUPERINTENDENT'S LOGBOOK PRESENTED NOT UP TO DATE. ECB ISSUED FOR FAILURE TO PERFORM DUTIES AS PER #39203242X | Nov 18, 2026 PENDING | $5,000 |
| Nov 14, 2025 | Unknown CLASS - 2 BC 3309.17: DURING MY INSPECTION OF A TWO-STORY BUILDING UNDERGOING FULL DEMOLITION, I OBSERVED AT EXP# 4THAT ADJACENT PROPERTY WINDOWS AND DOORS AT EXP#4 AND THE REAR LACKED REQUIRED PROTECTION, CREATING A HAZ #39547058P | Sep 16, 2026 IN VIOLATION | $2,500 |
| Nov 14, 2025 | Unknown CLASS - 2 BC 3306.9.8.3: AT THE TIME OF MY INSPECTION OF A TWO-STORY BUILDING UNDERGOING FULL DEMOLITION, I OBSERVED GLASS REMAINING IN MULTIPLE WINDOW AND DOOR , CREATING A HAZARD TO WORKERS AND THE PUBLIC. STOP ALL DEM #39547057N | Sep 16, 2026 IN VIOLATION | $2,500 |
| Sep 18, 2025 | Construction CLASS - 2 AT THE TIME OF INSPECTION, INACTIVE JOBSITE, I OBSERVED SIDEWALK SHED INSTALLED AT EXPOSURE 1 WITH NO PARAPET INFORMATION PANEL POSTED / AFFIXED TO THE SHED AS PER BC 3301.9.2.2 SIDEWALK SHED PARAPET INFORMATIO #39545016H | Jan 12, 2026 IN VIOLATION | $1,250 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 8, 2026 | ECB | Construction: AT THE TIME OF MY INSPECTION OF THE 9-STORY NEW BUILDING, I OBSERVED ACTIVE CONSTRUCTION, SUPPORTED PIPE SCAFFOLDING ERECTING AT ALL EXPOSURES, INCLUDING THE COURTYARD. UPON REVIEW OF THE APPROVED SCAFFOLD PLAN | Open |
| Sep 12, 2026 | ECB | Unknown: BC3314.1 OBSERVED SUPPORTED SCAFFOLD INSTALLED ALL EXPOSURES NOT MAINTAIN AS PER CODE. SCAFFOLD NOT FULLY PLANKED, PLANKS LOOSE NOT TIED DOWN / SECURED. DEBRIS NETTING LOOSE/MISSING NOT SECURELY FASTENED TO FAC | Open |
| Sep 12, 2026 | ECB | Unknown: BC3303.3 WATCHPERSON 9 STORY NEW BUILDING, BUILDING APPROXIMATELY 9931 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATCHPE | Open |
| Sep 10, 2026 | ECB | Construction: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ASNOTED AT THE TIME OF INSPECTION, OF A PROPOSED 9 STORY NEW BUILDING, ACTIVELY PLACING CONCRETE ON THE 9TH FLOOR. I OBSERVED 9 STORY NEW BUIL | Open |
| Sep 10, 2026 | ECB | Construction: BC-3305.3.6.1.2. FAILURE TO SECURE RESHORING POST IN PROXIMITY TO UNENCLOSED PERIMETERS:-AS NOTED AT THE TIME OF INSPECTION OF A PROPOSED 9 STORY NEW BUILDING ACTIVELY PLACING CONCRETE ON 9TH FLOOR SLAB 9 FLOOR | Open |
| Sep 10, 2026 | ECB | Construction: WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS:-AS NOTICED AT THE TIME OF INSPECTION OF A PROPOSED 9 STORY NEW BUILDING ACTIVELY PLACING CONCRETE ON THE 9TH FLOOR SLAB, 8-9 FLOOR SW | Open |
| Sep 10, 2026 | ECB | Plumbing: FAILURE TO PROVIDE SPECIAL INSPECTION OF CONCRETE PLACEMENT TR1. AS NOTED AT THE TIME OF INSPECTION OF A PROPOSED 9 STORY NEW BUILDING ACTIVELY PLACING CONCRETE ON 9TH FLOOR SLAB, 8-9 FLOOR SHEAR WALLS AND COLU | Open |
| Sep 2, 2026 | DOB Safety | AEUHAZ: | Closed |
| Aug 24, 2026 | ECB | Unknown: BC 3307.2.1 AT TIME OF INSPECTION OBSERVED: CONTRACTOR POURING CONCRETE AT 5TH FL. DECK LEVEL AT 8:25 AM APPROX. CONTRARY TO DOT PERMIT# B64 STIPULATION 072 AND PERMIT# B68 STIPULATION 072 AS WELL, CREATING UNS | Open |
| Aug 19, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED: UNSAFE MATERIAL DELIVERY. SCAFFOLD EQUIPMENT BEEN UNLOAD FROM TRUCK AND STORAGE ON TOP OF SIDEWALK SHED, CREATING UNSAFE CONDITIONS FOR PUBLIC AND PROPERTY, USING SCAFFOLD CONTRA | Open |
| Aug 19, 2026 | DOB Safety | AEUHAZ: | Closed |
| Aug 13, 2026 | ECB | Unknown: BC 3307.2.1 AT TIME OF INSPECTION OBSERVED: CONTRACTOR PREPARING TO RECEIVE MATERIAL DELIVERY OPERATIONS USING KNUCKLE BOOM AT EXPO#3 FULLY BLOCKING SIDEWALK UPON REQUEST FOR DOT PERMIT, NONE WAS PROVIDED CREAT | Closed |
| Aug 13, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED/OVERHEAD PROTECTION AT EXPOSURE 1 NO MIRRORS AT LOCATIONS WHERE PEDESTRIANS VIEW IS OBSTRUCTED BY COLUMNS AT SIDEWALK AREA CONTRARY TO BC 3307.2.6 NUMERAL 3 VEHICLE | Closed |
| Jul 30, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED: CONCRETE OPERATIONS AT EXPO# 3 CONTRACTOR FAILURE TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES AT EXPOSURE# 1. CONCRETE WASTE SCATTERED ON ROADWAY, CREATING AN UNSAFE AND | Open |
| Jul 30, 2026 | ECB | Construction: BACKFLOW PREVENTION. AT THE TIME OF INSPECTION, I OBSERVED FIRE HYDRANT BEING USED, HOSE CONNECTED GOING TO CONSTRUCTION SITE WITHOUT A BACKFLOW PREVENTER VALVE CONTRARY TO BC 15 RCNY 20-04. FAILURE TO PROVIDE | Open |
| Jul 30, 2026 | ECB | Unknown: BC 3307.2.1 AT TIME OF INSPECTION OBSERVED: MATERIAL DELIVERY OPERATIONS USING KNUCKLE BOOM AT EXPO#1 CONTRARY TO DOT STIPULATIONS PERMIT# B69 USING MORE THAN 8' OF ROADWAY. CONCRETE OPERATIONS AT EXPO# 3 FULLY | Closed |
| Jul 30, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED: MATERIAL DELIVERY OPERATIONS USING KNUCKLE BOOM AT EXPO#1 AND CONCRETE OPERATIONS AT EXPO# 3 INADEQUATE STAGE WORK ZONE, PLASTIC BARRIERS SYSTEM CONTRARY TO MANUFACTURER SPECIFIC | Closed |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Closed |
| Jul 9, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED: PEDESTRIAN WALKWAY NOT MAINTAINED/INADEQUATE 3 INCHES CRACK AND UNEVEN SURFACE SIDEWALK AT EXPOSURE# 1 CONTRARY TO BC 3303.4.1.1 CREATING POTENTIAL TRIPPED HAZARDOUS CONDITIONS F | Closed |
| Jul 9, 2026 | ECB | Unknown: AT TIME OF INSPECTION OBSERVED: CONTRACTOR FAILURE TO INSTITUTE SAFETY MEASURES INADEQUATE/MISSING CONTENT ON PRE-SHIFT SAFETY MEETING, NO MENTION ABOUT SPECIFIC/ GENERAL WORK TASK HAZARDOUS AND PREVENTION ON S | Closed |
| Jul 9, 2026 | ECB | Construction: AT TIME OF INSPECTION OBSERVED: PROPOSED 9 STORY NB. AT EXPOSURE# 1 INADEQUATE STORAGE ZONE, PLASTIC BARRIERS SYSTEM CONTRARY TO MANUFACTURER SPECIFICATIONS, MISSING INTERLOCKING COUPLERS, NOT WATER FILLED, CO | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 11:10 PM ET. BBL 3015790010.