Brooklyn · Block 8664 · Lot 415 · 11235

2921 Brighton 4 Street

6 floors · 14 apartments · 11,464 sq ft · built 2025 · class D3 · owner of record: 2921 Brighton 4 Llc

1open violations
$28,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029

Open violations

ECB / OATH (8) · $28,750 owed
IssuedViolationHearingBalance
Oct 14, 2026Construction CLASS - 2
FAILURE TO DISPLAY/MAINTAIN ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33:-AS NOTED AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING ACTIVELY DOING INTERIOR FINISHING AND STAIR INSTALLATION. I OBSERVED A ST
#35730278R
Dec 23, 2026
PENDING
$1,250
Aug 10, 2026Construction CLASS - 1
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURE/TEMPORARY CONSTRUCTION "NO HANDRAILS". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSER
#35729964Z
Dec 21, 2026
$2,500
Aug 10, 2026Construction CLASS - 1
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT. AS NOTED: AT TIME OF INSPECTION AT A JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERVED FROM THE 1ST FLOOR OF THE B
#35729963R
Dec 21, 2026
$2,500
May 12, 2026Construction CLASS - 1
FAILURE TO INSTITUTE SAFETY EQUIP MEASURES OR TEMPORARY CONSTRUCTION, "IMPROPER GUARDRAILS". AS NOTED: AT TIME OF INSPECTION AT A JOBSITE OFA PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL OBSERVED FRO
#35726472Z
Feb 5, 2027
$5,000
May 12, 2026Construction CLASS - 1
FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURE OR TEMPORARY CONSTRUCTION, "NO TOE BOARD". AS NOTED: AT TIME OF INSPECTION AT A JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERVED
#35726473K
Feb 5, 2027
$5,000
May 12, 2026Construction CLASS - 1
FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS. ASNOTED: AT TIME OF INSPECTION AT A JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL OBSERVED FROM THE 1ST FLOOR LEVEL OF
#35726474M
Feb 5, 2027
$2,500
Feb 25, 2026Construction CLASS - 2
GC-620543 AT 5:00AM OBSERVED 6 STORY BUILDING WITH SIDEWALK SHED THAT WAS NOT ILLUMINATED AS STIPULATED IN BC3307.6.4.8 CREATES HAZARDOUS CONDITIONS FOR PEDESTRIANS OF SLIPS AND TRIPS DUE TO INADEQUATE LIGHTING
#39550872R
Apr 8, 2027
DEFAULT
$5,000
Sep 9, 2025Construction CLASS - 2
AT 4:00AM OBSERVED 6 STORY BUILDING WITH SIDEWALK SHED INSTALLED AT EXP #1 4 THAT WAS NOT ILLUMINATED AS STIPULATED IN BC3307.6.4.8 CREATES HAZARDOUS CONDITIONS FOR PEDESTRIANS OF SLIPS AND TRIPS DUE TO INADEQU
#39544624R
Nov 19, 2026
DEFAULT
$5,000
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Oct 14, 2026ECBConstruction: FAILURE TO DISPLAY/MAINTAIN ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33:-AS NOTED AT THE TIME OF MY INSPECTION OF A 6 STORY NEW BUILDING ACTIVELY DOING INTERIOR FINISHING AND STAIR INSTALLATION. I OBSERVED A STOpen
Aug 10, 2026ECBConstruction: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURE/TEMPORARY CONSTRUCTION "NO HANDRAILS". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERClosed
Aug 10, 2026ECBConstruction: FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT. AS NOTED: AT TIME OF INSPECTION AT A JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERVED FROM THE 1ST FLOOR OF THE BClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 4:34 AM ET. BBL 3086640415.

Look up another building