4 floors · 8 apartments · 6,795 sq ft · built 1931 · class C1 · owner of record: 292 E 151 Holdings Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 47 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 63 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 291 days | Registered through 2027-09-01 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 25, 2020 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCE. NOTE: AT EXP#1 ABOVE WINDOWS LINTELS IN STATE OF DISREPAIR,ALSO IN VARIOUS AREAS MISSING MORTAR IN JOINTS. REMEDY: MAINTAIN BLDG EXTERIOR WALLS. #35475754N | Jun 19, 2020 IN VIOLATION | $1,250 |
| Dec 9, 2019 | Construction CLASS - 1 FAILUIRE TO MAINTAIN WALL(S) OR APPURTENANCES NOTED: @TIME OF INSPECTION I OBSEVRED @EXP#1 ABOVE WINDOWS LINTELS IN DEREPAIR ALSO VARIOUS ARREAS MISSING MORTAL IN JOINTS NEED TO MAKE REPAIR.REM: COMPLY WITH #35461358Y | Oct 23, 2020 IN VIOLATION | $6,250 |
| Oct 22, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING WALLS AND APPURTENANCES.NOTE AT EXPOSURE#1 ABOVE WINDOWS LINTELS IN DISREPAIR ALSO VARIOUS AREAS MISSING MORTARREMEDY:MAINTAIN BUILDING EXTERIOR WALLS. #35459259X | Nov 13, 2020 IN VIOLATION | $2,500 |
| Sep 3, 2019 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCES.AT EXP 1&3,OBSERVED BRICKS W/MISSING MORTAR IN VARIOUS AREAS.ALSO @ EXP#1(FRONT OF BLDG)STEPS IN DISREPAIR W/CRACKS & SECTIONS MISSING THRU-OUT THE WINDOWS @ALL #35452101Y | Nov 13, 2020 IN VIOLATION | $2,500 |
| Jul 8, 2019 | Construction CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35414634J ISSUED ON 04-20-19 & TO FILE A C OF C PURSUANT TO 28-201.1 & 1RCNY 102-01. NO C OF C ON FILE. REMEDY: COMPLY W/COMM'S ORDER &/OR FILE A C #35397031Z | Aug 30, 2019 DEFAULT | $1,000 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 1, 2026 | B | Apt 2R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18849078 ISSUED 01-MAY-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE COD | Oct 6, 2026 |
| May 4, 2026 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 8, 2026 |
| May 4, 2026 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM MISSING AT PUBLIC HALL, 1st STORY | May 10, 2026 |
| May 4, 2026 | B | Apt 2R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE BATHROOM LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 8, 2026 |
| May 4, 2026 | B | Apt 2R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 8, 2026 |
| May 4, 2026 | A | § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY | Aug 7, 2026 |
| May 4, 2026 | B | Apt 2R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH | Jun 8, 2026 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 1, 2026 | HPD B | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10SQ FT AT CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2R, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18849078 ISSUED 01-MAY-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE COD | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 8:27 AM ET. BBL 2024100021.