2 floors · 3 apartments · 3,357 sq ft · built 1977 · class C0 · owner of record: Coore, Sharelle
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 434 days | Next cycle year 2027 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 1, 2025 | Construction CLASS - 2 OCCUPANCY IN CONTRARY TO THAT ALLOWED BY C/O AND/OR DEPARTMENT OF BUILDING RECORDS. ILLEGALLY CREATED CLASS "A" APARTMENT AT 1ST STORY CONTRARY TO C O CONSISTING OF FULL BATHROOM WITH WASH BASIM, BATHTUB AND WA #35483047Y | Dec 4, 2026 PENDING | $1,250 |
| May 11, 2023 | Boilers CLASS - 2 HOLES IN CELLING AND WALLS , EXPOSED WIRING,LIGHTS IN BOILER ROOM NOT WORKING,OIL LEAK ON BURNER,NEED TO CLEAN BOILER ROOM OF ALL DEBRIS, PIPES NEED TO BE SUPPORTED IN BOILER ROOM, MAINTAIN BOILER #39086062Z | Jul 21, 2023 IN VIOLATION | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 31, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle D (premises is in Community District 12) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Dec 11, 2025 | B | § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF USE OF ROOMS FOR LIVING, DISCONNECT PLUMBING FIXTURES WHERE ILLEGAL AND PROPERLY SEAL PIPE CONNECTIONS AT ILLEGALLY CREATED KITCHEN AND BATHROOM AT ILLEGALLY CREATED CLASS A APARTMENT AT PUBLIC HALL, 1st STORY | Jan 15, 2026 |
| Dec 11, 2025 | B | § 27-2073 ADM CODE - DISCONTINUE UNLAWFUL COOKING SPACE OR FILE PLANS AND APPLICATION WITH THIS DEPARTMENT TO LEGALIZE SAME, IF LAWFULLY FEASIBLE ELECTRICAL RANGE AT ILLEGALLY CREATED KITCHEN AT ILLEGALLY CREATED CLASS A APARTENT AT PUBLIC HALL, 1st STORY | Jan 15, 2026 |
| Dec 11, 2025 | A | § 9, 170, 171, 300, 301, 302 M.D.LAW-FILE PLANS AND APPLICATION AND OBTAIN A CERTIFICATE OF OCCUPANCY TO LEGALIZE THE CONVERSION FROM A PRIVATE DWELLING TO MULTIPLE DWELLING USE IF LAWFULLY FEASIBLE OR RESTORE TO LAWFUL OCCUPANCY | Mar 16, 2026 |
| Dec 2, 2025 | B | Apt 1B · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT BSMT-APT 1B, 1st BSMT-APT FROM NORTH AT EAST | Jan 6, 2026 |
| Mar 14, 2023 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE AT FRONT OF BUILDING | Apr 18, 2023 |
| Mar 6, 2023 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE KITCHENETTE LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 10, 2023 |
| Mar 6, 2023 | B | Apt 3 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHENETTE LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 10, 2023 |
| Mar 6, 2023 | B | Apt 3 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE THE MECHANICAL VENTILATION SYSTEM AT EAST WALL. IN THE BATHROOM LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 10, 2023 |
| Mar 6, 2023 | B | Apt 3 · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE. IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 10, 2023 |
| Mar 2, 2023 | C | Apt 3 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 2, 2023 |
| Mar 2, 2023 | C | Apt 3 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 2, 2023 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 1:14 PM ET. BBL 2047900024.