22 floors · 48,495 sq ft · built 2019 · class H3 · owner of record: Midas Brooklyn, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 48,495 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 829 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1142 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 23, 2025 | Construction CLASS - 2 OBSERVED ACTIVE JOB SITE 22 STORY NB. C-HOOK SUSPENDED SCAFFOLD INSTALLED ROOF LEVEL ON EXPO 3, UPON REQUEST FOR REQUIRED DRAWINGS NONE WERE PROVIDED (DESIGN DRAWINGS, MANUFACTURE SPECIFICATIONS, MOTOR REPORT & #39545211N | Jul 7, 2026 IN VIOLATION | $1,250 |
| May 29, 2025 | Construction CLASS - 2 AT THE TIME OF INSPECTION ACTIVE CONSTRUCTION SITE, I OBSERVED SIDEWALK SHED MISSING PROJECT INFORMATION/CONSTRUCTION SIGN ON THE SHED UPPER PARAPET PANEL. PROVIDE PROJECT INFORMATION/ CONSTRUCTION SIGN ON SHED #39540788P | Aug 6, 2025 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Jan 13, 1997 | LOCAL LAW 10/81 - ELEVATOR #02441 | DOB VIOLATION - ACTIVE |
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 10:59 PM ET. BBL 3001610061.