4 floors · 10,805 sq ft · built 1910 · class O5 · owner of record: 291 Grand Owner, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 10, 2012 | Signs CLASS - 1 OUTDOOR ADVERTISING COMPANY SIGN ON DISPLAY STRUCTURE WITHOUT SIGN PERMIT. TEL 917-770-2735, 646-552-3828. 291 GRAND STREET. REM:REMOVE ILLEGAL SIGN. #34793575P | Jul 13, 2012 IN VIOLATION | $0 |
| Oct 14, 2003 | Plumbing Hazardous PLUMBING WORK WITHOUT A PERMIT.LOCATION3RD FL.SPRINKLER WORK HAS BEEN PERFORMED.SPRINKLER HEADS BRACHES REPLACED WITH 1"BLACK PIPING WITHOUT DOB AUTHORIZATION.NO SP SPRINKLER TYPE OF PERMIT WAS ISSUED TO ANY #34414827J | Dec 4, 2003 DEFAULT | $0 |
| Dec 21, 1992 | Boilers Non-Hazardous 32, BOILER DESIGN PRESSURE IS 100 PSI. EXISTING SAFETY VALUE IS SAL-FOR 150 PSI. THE LATER BE REPLACED BY NEW ONE SET-MAXIMUM AT 100 PSI #32009762X | Mar 4, 1993 WRITTEN OFF | $0 |
| Dec 21, 1992 | Boilers Non-Hazardous 6A, SAFETY VALUE INOPERATIVE MANUALLY. MUST BE REPLACED BY NEW ONE #32009763H | Mar 4, 1993 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 8, 2011 | CONSTRUCTION #NE05TV | DOB VIOLATION - ACTIVE |
| Dec 31, 2009 | LOW PRESSURE BOILER #00348 | DOB VIOLATION - ACTIVE |
| Feb 27, 2009 | LOCAL LAW 10/81 - ELEVATOR #00196 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #02095 | DOB VIOLATION - ACTIVE |
| Mar 26, 2002 | LOCAL LAW 62/91 - BOILERS #00492 | DOB VIOLATION - ACTIVE |
| Feb 27, 2001 | LOCAL LAW 62/91 - BOILERS #00461 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #00445 | DOB VIOLATION - ACTIVE |
| May 4, 1998 | LOCAL LAW 62/91 - BOILERS #03340 | DOB VIOLATION - ACTIVE |
| Sep 16, 1997 | LOCAL LAW 62/91 - BOILERS #164378 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #03914 | DOB VIOLATION - ACTIVE |
| Sep 1, 1994 | LOCAL LAW 62/91 - BOILERS #03319 | DOB VIOLATION - ACTIVE |
| Jan 17, 1991 | BOILER #H67135-01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Dec 31, 2009 | Boiler LBLVIO | Active |
| Feb 27, 2009 | Elevators LL1081 | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Mar 26, 2002 | Boiler LL6291 | Active |
| Feb 27, 2001 | Boiler LL6291 | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
| May 4, 1998 | Boiler LL6291 | Active |
| Sep 16, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Sep 1, 1994 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 9:01 AM ET. BBL 1003070015.