Manhattan · Block 819 · Lot 22 · 10011

29 West 17 Street

10 floors · 3 apartments · 25,000 sq ft · built 1906 · class O6 · owner of record: 29 W 17th Owner Llc

12open violations
$10,000ECB/OATH penalties owed
0HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $87,500 in late-filing or failure-to-file penalties. Agency page

Feb 21, 2027
in 99 days
No Cycle 10 report on record yet
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueNo current registration found
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-09 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (5) · $10,000 owed
IssuedViolationHearingBalance
Jun 17, 2024Construction CLASS - 2
A. C. 27-929.1, FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BUILDING 100 FEET OR MOR
#37028779H
Sep 12, 2024
IN VIOLATION
$1,250
Feb 28, 2023Construction CLASS - 2
27-929.1 FAILURE TO COMPLETE INSTALLATION OF FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE FINAL SPRINKLER REPORT PREPARED BY REGISTERED DESIGN PROFESSIONAL IN OFFICE BLDG 100 FT OR MORE IN HEIGHT IN EXISTENCE ON
#37025251X
Jun 22, 2023
IN VIOLATION
$3,125
Mar 30, 2021Construction CLASS - 2
SEC. A.C 27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL IN AN OFFICE BLDG 100 FEET OR MORE IN
#37020837K
Oct 14, 2021
IN VIOLATION
$3,125
Dec 15, 2020Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING FACADE AND APPURTENANCES. NOTE:EXPOSURE 1SOUTH ELEVATION DEFECTIVE AND DAMAGED CORNICE METAL BAND AND CRACKS/OPEN JOINTS IN FACADE AT THE FLAG POLE AREA. REMEDY:MAINTAIN EXTERIOR BL
#35542576R
Jul 1, 2021
IN VIOLATION
$1,250
Nov 15, 2019Construction CLASS - 2
AC279291-FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS AND FILE A SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY JULY,1,2019,IN AN OFFICE BUILDING 100 FEET OR M
#37016211R
Oct 29, 2020
IN VIOLATION
$1,250
DOB (7)
IssuedViolationStatus
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00064
DOB VIOLATION - ACTIVE
Nov 30, 2007LOCAL LAW 11/98 - FACADE

#NRF42620
DOB VIOLATION - ACTIVE
May 6, 1992CONSTRUCTION

#C14SSO2
VIOLATION UNSERVED ECB-ACTIVE
Dec 18, 1990CONSTRUCTION

#C1RDO5
DOB VIOLATION - ACTIVE
Dec 4, 1990CONSTRUCTION

#C1RD09
VIOLATION UNSERVED ECB-ACTIVE
Dec 4, 1990CONSTRUCTION

#C1RD01
DOB VIOLATION - ACTIVE
Nov 7, 1988ELEVATOR
(51) RESTORE ELEV TO PROPER WORKING ORDER SO A COMPLETE INSPECT ION CAN BE MADE
#1156A-1
DOB VIOLATION - ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 12:02 PM ET. BBL 1008190022.