Bronx · Block 2852 · Lot 32 · 10453

29 Mt Hope Place

class V0 · owner of record: Mt Hope 27 Llc

13open violations
$13,750ECB/OATH penalties owed
0HPD class C (immediately hazardous)
—no dated deadlines found

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

We couldn't find building attributes for this lot, so no deadlines are listed.

Open violations

ECB / OATH (3) · $13,750 owed
IssuedViolationHearingBalance
Aug 4, 2026Construction CLASS - 2
OBSERVED ONGOING CONCRETE OPERATIONS WITH CONCRETE TRUCK AND PUMP STREET LEVEL OF JOBSITE. MAKESHIFT CONCRETE WASHOUT WAS IN USE. UPON REQUEST FOR ENGINEER DESIGN DRAWINGS FOR THE MAKESHIFT CONCRETE WASHOUT, NO
#39557481L
Dec 4, 2026
$1,250
Jul 7, 2026Construction CLASS - 1
15 STORY NB AT SOE/FOUNDATION PHASE ACTIVE SITE. OBSERVED MULTIPLE UNSAFE CONDITIONS/CONTRARY TO SSP. NO/MISSING OR INADEQUATE GUARDRAILS AT ELEVATOR PIT 7-10 FT FALL HAZARD/EARTH RAMP EXP#1, EGRESS/INGRESS LAD
#39556273M
Mar 12, 2027
$2,500
Jul 7, 2026Unknown CLASS - 1
15 STORY NB ACTIVE SITE AT EXCAVATION PHASE. OBSERVED DAMAGE TO ADJOINING PROPERTY EXP#4 WALKWAY SEEM PARTIALLY COLLAPSED/UNDERMINED VOIDS/CRACKS LEADING TO EXCAVATED AREA IN MULTIPLE LOCATIONS WITHIN 5' OF 31
#39556274Y
Mar 12, 2027
$10,000
DOB (0)

None open.

DOB NOW Safety (6)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 5)
Active
Feb 10, 1997Boiler LL6291
Active
Aug 29, 1995Boiler LL6291
Active
Jun 9, 1994Boiler LL6291
Active
May 17, 1993Boiler LL6291
Active
HPD (7) · C 0 · B 0 · A 6
IssuedClassViolationCorrect by
Nov 17, 2025I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
Apr 30, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 3, 2026
Jun 5, 2025A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Sep 8, 2025
Apr 3, 2024A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 7, 2024
Mar 17, 2023A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jun 20, 2023
Feb 17, 2022A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.May 23, 2022
Apr 5, 2021A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Jul 9, 2021

Issued in the last 120 days

DateSourceWhatNow
Aug 4, 2026ECBConstruction: OBSERVED ONGOING CONCRETE OPERATIONS WITH CONCRETE TRUCK AND PUMP STREET LEVEL OF JOBSITE. MAKESHIFT CONCRETE WASHOUT WAS IN USE. UPON REQUEST FOR ENGINEER DESIGN DRAWINGS FOR THE MAKESHIFT CONCRETE WASHOUT, NOClosed
Aug 4, 2026ECBConstruction: 20-08- OBSERVED FIRE HYDRANT IN USE AT STREET LEVEL OF JOBSITE. THE FIRE HYDRANT IS IN USE WITHOUT RPZ CONNECTION (BACKFLOW). STOP ALL USE OF FIRE HYDRANT.PROVIDE/MAINTAIN RPZ CONNECTION WITH USE OF FIRE HYDRANClosed
Aug 4, 2026ECBConstruction: OBSERVED ONGOING CONCRETE OPERATIONS, THE ONGOING OPERATIONS CONSISTED OF A FULL STREET CLOSURE AT EXPOSURE 1 OF THE JOBSITE. REVIEW OF THE PROVIDED APPROVED DOT PERMITS STIPULATIONS STATE THAT FULL CLOSURE ISClosed
Jul 7, 2026ECBConstruction: 15 STORY NB AT SOE/FOUNDATION PHASE ACTIVE SITE. OBSERVED MULTIPLE UNSAFE CONDITIONS/CONTRARY TO SSP. NO/MISSING OR INADEQUATE GUARDRAILS AT ELEVATOR PIT 7-10 FT FALL HAZARD/EARTH RAMP EXP#1, EGRESS/INGRESS LADClosed
Jul 7, 2026ECBUnknown: 15 STORY NB ACTIVE SITE AT EXCAVATION PHASE. OBSERVED DAMAGE TO ADJOINING PROPERTY EXP#4 WALKWAY SEEM PARTIALLY COLLAPSED/UNDERMINED VOIDS/CRACKS LEADING TO EXCAVATED AREA IN MULTIPLE LOCATIONS WITHIN 5' OF 31Closed
Jul 7, 2026ECBConstruction: 15 STORY NB ACTIVE SITE AT EXCAVATION PHASE/SOE.OBSERVED WORK CONTRARY TO APPROVED SOE PLANS.EXCAVATED AREA AT EXP#4 10 FT DEEP.MISSING CONNECTIONS RAKERS/WHALERS/HEEL BLOCKS/TIMBER LAGGING.EXP#1,4 MISSING PI PClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 25, 2026, 12:12 PM ET. BBL 2028520032.