1 floors · 2,240 sq ft · built 1986 · class K1 · owner of record: Tran-Li, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jun 11, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT. AT TIME OF INSPECTION OBSERVED AT CELLAR LEVEL MULTIPLE HORIZONTAL CRACKS, MASONRY COLUMNS MISSING MORTAR AND STRESS CRACKS APPEAR. CELLAR FLOOR LARGE CRACK AND LEANS #26-01541 | DOB VIOLATION - ACTIVE |
| Jun 11, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.CRCKS OBSRVD ON EXP1 WALL ON 1STFL &EXP2 WALL ON CELLAR.COLUMN N CELLAR HAD CRACKS.CELLAR FLOOR WAS UNEVEN &CRACKED FLOOR&EXP4 WALL ON CELLAR WERE DAMP.CELLAR HAD CRCKS.OWNR TO RTAIN NYSPE&GC REG W/DOB TO IMMED 1.NYSPE TO SUBMIT MEANS&METHDS TO SHORE 1STFL&ROOF FRAMNG.BRACE&STAB #FEU10201BP | DOB VIOLATION - ACTIVE |
| Jun 11, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.BLDG HAS 2COMMERCIAL STORES.EXP1 IS ALNG ELIZABETH ST.CRCKS OBSRVD ON EXP1 ON 1STFL & EXP2 WALL ON CELLAR.COLUMN ON CELLAR HAD CRCKS.CELLAR FL UNEVN.1.OWNR TO RTAIN NYSPE TO EVAL ENT STRCTRE&FILE RPAIR DWGS W/DOB,2.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG #FEU10202BP | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 10:04 PM ET. BBL 1004790026.