13 floors · 171 apartments · 177,894 sq ft · built 2020 · class RM · owner of record: Qbdk Huron, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 177,894 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Facade inspection report (Cycle 10B) Applies Local Law 11 / FISP · Feb 21, 2026 to Feb 21, 2028 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 0, 7 or 8 are in sub-cycle 10B. Agency page | Feb 21, 2028 in 487 days | No Cycle 10 report on record yet |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 801 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2030) Likely applies Local Law 87 · Calendar year 2030 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2520). Agency page | Dec 31, 2030 in 1531 days | Next due 2030 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-15 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 1, 2026 | Construction CLASS - 1 PLUMBING WORK WITHOUT PERMIT. : AT A 13-STORY MULTIPLE DWELLING BUILDING OBSERVED AT PENTHOUSE FLOOR APT. PHF NEW WATER AND WASTE LINES INSTALLED IN BATHROOM. NO PERMITS FILLED FOR SUCH SCOPE OF WORK., OBTAIN P #39194568Y | May 6, 2027 | $2,500 |
| Jul 1, 2026 | Unknown CLASS - 1 ELECTRICAL WORK WITHOUT PERMIT. AT A 13-STORY MULTI DWELLING BUILDING OBSERVED ON THE PENTHOUSE FLOOR APT PHF-E, NEWLY INSTALLED HANGING BX CABLE, ELECTRICAL WIRES AND NEWLY INSTALLED ELECTRICAL BOXES THROUGH O #39194569X | May 6, 2027 | $2,500 |
| Jun 22, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS BY BC CHAPTER 33. ATOI PLANS NOT ON SITE. REMEDY: MAINTAIN/DISPLAY REQUIRED DOCUMENTS. #39193343Z | Sep 16, 2026 DEFAULT | $1,280 |
| Issued | Violation | Status |
|---|---|---|
| Aug 24, 2026 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT. OBSERVED THE FOLLOWING CONDITIONS: MISSING PANEL AT 11 FLOOR AT EXPOSURE 2 WEST ELEVATION REMEDY: REPAIR AND/OR REPLACE #SR0101NS | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Aug 29, 2025 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2024 Periodic Inspection Report | Active |
| Aug 29, 2025 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2023 Cat1 Test Report | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Report | Active |
| Apr 5, 2019 | Elevators EVCAT1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Dec 1, 2016 | Elevators EVCAT1 | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Mar 31, 2014 | Elevators EVCAT1 | Active |
| Oct 1, 2012 | Elevators EVCAT1 | Active |
| Dec 13, 2011 | Elevators EVCAT1 | Active |
| Oct 8, 2010 | Elevators VCAT1 | Active |
| Feb 27, 2009 | Elevators LL1081 | Active |
| Mar 21, 2008 | Elevators LL1081 | Active |
| Apr 2, 2007 | Elevators LL1081 | Active |
| Oct 1, 2005 | Elevators LL1081 | Active |
| Nov 19, 2004 | Elevators LL1081 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 24, 2026 | DOB | CONSTRUCTION: FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT. OBSERVED THE FOLLOWING CONDITIONS: MISSING PANEL AT 11 FLOOR AT EXPOSURE 2 WEST ELEVATION REMEDY: REPAIR AND/OR REPLACE | Open |
| Jul 1, 2026 | ECB | Construction: PLUMBING WORK WITHOUT PERMIT. : AT A 13-STORY MULTIPLE DWELLING BUILDING OBSERVED AT PENTHOUSE FLOOR APT. PHF NEW WATER AND WASTE LINES INSTALLED IN BATHROOM. NO PERMITS FILLED FOR SUCH SCOPE OF WORK., OBTAIN P | Closed |
| Jul 1, 2026 | ECB | Unknown: ELECTRICAL WORK WITHOUT PERMIT. AT A 13-STORY MULTI DWELLING BUILDING OBSERVED ON THE PENTHOUSE FLOOR APT PHF-E, NEWLY INSTALLED HANGING BX CABLE, ELECTRICAL WIRES AND NEWLY INSTALLED ELECTRICAL BOXES THROUGH O | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 7:43 PM ET. BBL 3025207501.