1 floors · 3,596 sq ft · built 1930 · class P2 · owner of record: Primorja Center, Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Dec 21, 2012 | Construction CLASS - 1 WORK W/O PERMIT.NOTED:WORK FILED UNDER ALT#2 #520115857 IS ONLY IN PLAN EXAMINATION SATUS:WORK IS APPROXIMATELY 25% COMPLETE.DEMO STAGE:REMOVING AND REPLACING ALL RAFTERS:RAISING THE ROOF AT #27.NEW STEEL HEADE #35006300R | Apr 10, 2013 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | CONSTRUCTION EMERGENCY WORK ORDER-COMMERCIAL BLDG THAT WAS DAMAGED BY CAR IMPACTING THE BLDG ON 11/10/25.STRUCT DAMAGE NOTED @ FRONT ENTRANCE&SUPPORT OF MARQUEE THAT IS IN DANGER OF COLLAPSE.IMMED INSTALL TEMPORARY SHORING UNDER DIRECT&CONTINUOUS SUPERV OF PE.PE TO SUBMIT MEANS/METHODS TO FEU FOR REVIEW #FEU50101XC | DOB VIOLATION - ACTIVE |
| Nov 12, 2025 | IMMEDIATE EMERGENCY SEAL ALL DAMAGED OPENINGS TO SAFEGUARD THE STRUCTURE AND PREVENT UNAUTHROIZED ENTRY #19745 | DOB VIOLATION - ACTIVE |
| Nov 11, 2025 | CONSTRUCTION STRUCTURE RENDERED NON COMPLIANT DUE TO VEHICLE IMPACTING THE BUILDING. AT THE TIME OF INSPECTION OBSERVED STRUCTURAL DAMAGE TO THE FRONT ENTRANCE OF THE BUILDING AT EXPOSURE 1&2. THE WOODEN COLUMN WHICH SUPPORTS THE MARQUEE OVER THE ENTRANCE TO THE BUILDING HAS BEEN DAMAGED COMPROMISING THE MAIN ME #25-02555 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 2:44 AM ET. BBL 5000230017.