2 floors · 35,000 sq ft · built 1931 · class E1 · owner of record: Clem Properties Inc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 35,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1165 days | Next cycle year 2029 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 16, 2026 | CONSTRUCTION EMERGENCY WORK ORDER.DUE TO FIRE THAT OCCURRED @ADJ PROPERTY 17 53 ST THE WEDT PARTY WALL W17 53RD ST DAMAGED&PARTIALLY COLLAPSED@TOP LEAVING ROOF UNSUPPORTED & WALL FREE STANDING.IMMED PARTIALLY DEMOLISH UNSUPPORTED SECTION OF ROOF APPROX 20'FROM PARTY WALL&DEMOLISH PARTY WALL TO A SAFE LEVEL #FEU30701XC | DOB VIOLATION - ACTIVE |
| Mar 12, 2026 | IMMEDIATE EMERGENCY ERECT 112 LINEAR FT OF TIGHT BOARD CONSTRUCTION FENCE 20 FT OUT FROM BUILDING AS FOLLOWS, EXP 1, 36 FT AND RETURN BACK TO BUILDING 20 FT AT EXP 1,4 CORNER, EXP 3, 36 FT AND RETURN 20 FT BACK TO BUILDING AT EXP 3,4 CORNER TO SAFEGUARD THE PUBLIC AND PROPERTY #20064 | DOB VIOLATION - ACTIVE |
| Mar 11, 2026 | CONSTRUCTION STRUCTURE RENDERING NON-COMPLIANT DUE TO DAMAGE TO MASONRY PARTY WALL AT EXPOSURE #2 SHARED WALL WITH FIRE BUILDING. #26-00735 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 11:39 AM ET. BBL 3008030041.