Queens · Block 402 · Lot 28 · 11101

29-14 40 Avenue

10 floors · 27,899 sq ft · built 2014 · class H3 · owner of record: 2912 40th Ave Llc

1open violations
$2,500ECB/OATH penalties owed
0HPD class C (immediately hazardous)
184dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 27,899 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028
Facade inspection report (Cycle 10C) Applies
Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $48,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SWARMP (2025-09-19)

Open violations

ECB / OATH (1) · $2,500 owed
IssuedViolationHearingBalance
Sep 3, 2026Construction CLASS - 1
AT THE TIME OF INSPECTION OBSERVED 6 HOT WATER HEATERS INSTALLED ON THE 10TH FLOOR WITH NO PERMITS ON FILE CHECKED BIS/DOBNOW NO PERMITS ON FILE CONTRARY TO PC 106.1 - PLUMBING WORK, INCLUDING WATER HEATER INST
#39203024H
Nov 10, 2026
PENDING
$2,500
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 3, 2026ECBConstruction: AT THE TIME OF INSPECTION OBSERVED 6 HOT WATER HEATERS INSTALLED ON THE 10TH FLOOR WITH NO PERMITS ON FILE CHECKED BIS/DOBNOW NO PERMITS ON FILE CONTRARY TO PC 106.1 - PLUMBING WORK, INCLUDING WATER HEATER INSTOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 28, 2026, 5:53 PM ET. BBL 4004020028.

Look up another building