9 floors · 28,350 sq ft · built 2011 · class H3 · owner of record: 29-11 39th Avenue Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $114,000 in late-filing or failure-to-file penalties. Agency page | Feb 21, 2027 in 115 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 28,350 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Apr 9, 2026 | Unknown CLASS - 2 ALSO OBSERVED CONSTRUCTION FENCE INSTALLED ON EXP 1 HOWEVER NO PERMIT ON FILE WITH DOB, OBTAIN TEMPORARY CONSTRUCTION PERMIT #39183934L | May 4, 2027 DEFAULT | $1,280 |
| Oct 27, 2025 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT ON SITE, EXPIRED PERMIT. NOTE: AT THETIME OF INSPECTION OBSERVED CONSTRUCTION FENCE PERMIT EXPIRED AND NO PERMIT POSTED ON DATABASE. REMEDY: RENEW PERMIT. #35726101J | Jan 27, 2026 DEFAULT | $0 |
| Jul 22, 2024 | Construction CLASS - 2 SIDEWALK SHED BC 3307.6.@9STORY BUILDING OBSERVE NO-CONSTRUCTION ACTIVITY,BUILDING CONSTRUCTION PERMIT,&CONSTRUCTION EQUIPMENT EXCEPT FOR UNMAINTAINED SIDEWALK SHED BY BUILDING OWNER:VERTICAL MEMBERS WOOD BLOCK #39530703H | Oct 1, 2024 DEFAULT | $0 |
| May 21, 2024 | Construction CLASS - 1 UNLAWFUL ACTS. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTE: DOB 03/032022LLFJF02 REQUIRES THE OWNER TO IMMEDIATELY RETAIN A NYS LICENSED PROFESSIONAL TO PERFORM A 100% HANDS ON INSPECTION OF ALL EXTERIOR #35685114K | Nov 2, 2026 PENDING | $0 |
| Jan 31, 2023 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.FAILURETO MAINTAIN BALCONIES ON EXP1 SOUTH ELEVATION AND EXP3 NORTH ELEVATIONSTRUCTURAL ELEMENTS EXPOSED AND BALCONIES CEILINGS COLLAPSED ON TO LOW #35669539X | Apr 11, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Oct 27, 2025 | CONSTRUCTION FAILURE TO MANTAIN BUILDING IN A CODE COMPLIANT MANNER. AT THE TIME OF INSPECTION OBSERVED CRACKED STUCCO AND DEFECTED BALCONY SLAB AT EXP 1 AND EXP 3. REMEDY: REPAIR AND OR REPLACE #SR0104NS | DOB VIOLATION - ACTIVE |
| Mar 7, 2022 | CONSTRUCTION PARTIAL VACATE ORDER-OBSERVED DETERIORATED/LOOSE BALCONY SHEATHING, STUDS AND CLADDING AT VARIOUS FLOORS OF EXP 1 SOUTH ELEVATION AND EXP 3 NORTH ELEVATIONS. DUE TO THESE IMMINENT HAZARDOUS CONDITIONS OF BALCONIES PARTILA VACATE OF ALL BALCONIES. REMEDY:VACATE ALL BALCONIES AT EXP 1 SOUTH ELEV AND E #LLFJL01 | DOB VIOLATION - ACTIVE |
| Mar 3, 2022 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO THE UNSTABLE BALCONY SLABS AND STRUCTURE LOCATED AT SOUTH ELEVATION EXP #1 AND NORTH ELEVATION EXP #3 REMEDY: IMMED PROVIDE SIDEWALK SHED, CONTROLLED ACCESS ZONE AND SAFETY MEASURES ACCESS TO ALL BALCONIES ON NORTH AND SOUTH ELEVATIONS #LLFJF01 | DOB VIOLATION - ACTIVE |
| Mar 3, 2022 | CONSTRUCTION AS PER CONDITIONS ON SOUTH ELEVATION EXP #1 AND NORTH ELEVATION EXP #3 DEFECTIVE BALCONY SLABS AND STRUCTURE. REMEDY: OWNER TO IMMED RETAIN A NYS LIC PROF TO PERFORM 1 100% HANDS ON INSPECTION OF ALL EXTERIOR BALCONIES AND PROVIDE REPAIR PLANS AND PROPSAL SUBMITTED TO DOB FACADE UNIT BY 4/3/2022 #LLFJF02 | DOB VIOLATION - ACTIVE |
| Feb 22, 2022 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 #02409 | DOB VIOLATION - ACTIVE |
| Sep 6, 2019 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST #08219 | DOB VIOLATION - ACTIVE |
| Jan 26, 2018 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST #09875 | DOB VIOLATION - ACTIVE |
| Jan 3, 2017 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST #09875 | DOB VIOLATION - ACTIVE |
| Mar 31, 2014 | ELEVATOR ANNUAL INSPECTION / TEST VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2012 INSPECTION/TEST #07092 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Jun 22, 2026 | Benchmarking - LL84 FTF-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Sep 11, 2024 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2023 Periodic Inspection Report | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2018 Cat1 Test Affirmation of Correction | Active |
| Aug 25, 2023 | Elevators FTF-VT-PER-CO Violation Issued-Failure To File 2022 Periodic Inspection Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Report | Active |
| Aug 11, 2023 | Elevators FTF-VT-CAT1-CO Violation Issued-Failure To File 2019 Cat1 Test Report | Active |
| Feb 22, 2022 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 | Active |
| Apr 29, 2021 | Energy Grade - LL33 FTP-EN-EGRDEA | Active |
| Sep 6, 2019 | Elevators ACC1 | Active |
| Jan 26, 2018 | Elevators ACC1 | Active |
| Jan 3, 2017 | Elevators ACC1 | Active |
| Mar 31, 2014 | Elevators EVCAT1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 7, 2021 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE AT FRONT YARD | Oct 12, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 3:22 PM ET. BBL 4003840031.