8 floors · 114 apartments · 101,057 sq ft · built 2018 · class RD · owner of record: Bronxview Housing Development Fund Corpo Ration
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 101,057 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 184 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 184 days | Annual filing |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. Agency page | Feb 21, 2029 in 846 days | Filing window not open yet |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1159 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3291). Agency page | Dec 31, 2031 in 1889 days | Next due 2031 |
None open.
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 6, 2026 | Energy Grade - LL33 FTP-EN-EGRDEA FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 13, 2026 | C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLY AT DOOR (LEADING TO PUBLIC HALLWAY FROM VESTIBULE) , 1st STORY | Oct 19, 2026 |
| Oct 13, 2026 | C | Apt 811 · § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING 130F DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 811, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Oct 19, 2026 |
| Oct 13, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR (LEADING TO PUBLIC HALLWAY FROM VESTIBULE) , 1st STORY | Oct 27, 2026 |
| Oct 7, 2026 | B | Apt 212 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 212, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Nov 11, 2026 |
| Sep 17, 2026 | C | Apt 101 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 101, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Oct 1, 2026 |
| Jun 22, 2026 | B | Apt 613 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WINDOW LOWER SASH COUNTER BALANCE IN THE 1st ROOM FROM EAST LOCATED AT APT 613, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''South'' | Jul 27, 2026 |
| Jun 22, 2026 | B | Apt 613 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CLOSET CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 613, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''South'' | Jul 27, 2026 |
| Jun 22, 2026 | B | Apt 613 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 613, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH , SECTION ''South'' | Jul 27, 2026 |
| Jun 15, 2026 | C | Apt 613 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 613, 6th STORY, 6th APARTMENT FROM EAST AT SOUTH | Jun 21, 2026 |
| Jun 15, 2026 | C | Apt 602 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BUCKELING VINYL PLANK TILES AT FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 602, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Jun 21, 2026 |
| Jun 15, 2026 | C | Apt 613 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING OF THE CLOSET IN THE PRIVATE HALLWAY LOCATED AT APT 613, 6th STORY, 6th APARTMENT FROM EAST AT SOUTH | Jun 21, 2026 |
| Jun 15, 2026 | A | Apt 613 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK WEST WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 613, 6th STORY, 6th APARTMENT FROM EAST AT SOUTH | Sep 18, 2026 |
| Jun 15, 2026 | A | Apt 613 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM LOCATED AT APT 613, 6th STORY, 6th APARTMENT FROM EAST AT SOUTH | Sep 18, 2026 |
| Jun 15, 2026 | A | Apt 613 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 613, 6th STORY, 6th APARTMENT FROM EAST AT SOUTH | Sep 18, 2026 |
| Jun 15, 2026 | B | Apt 613 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 613, 6th STORY, 6th APARTMENT FROM EAST AT SOUTH | Jul 20, 2026 |
| Jan 20, 2026 | B | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING GLASS PANE AT VESTIBULE DOOR AT PUBLIC HALL | Feb 24, 2026 |
| Jan 20, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ITS ASSEMBLY AT BUILDING ENTRANCE DOOR AT PUBLIC HALL | Feb 24, 2026 |
| Oct 28, 2025 | A | Apt 408 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM PANEL AT NORTH WALL IN THE FOYER LOCATED AT APT 408, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST | Jan 31, 2026 |
| Oct 28, 2025 | B | Apt 408 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VINYL FLOOR TILES IN THE 3rd ROOM FROM NORTH LOCATED AT APT 408, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST | Dec 2, 2025 |
| Oct 28, 2025 | B | Apt 408 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE PANEL AT HVAC UNIT IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 408, 4th STORY, 5th APARTMENT FROM SOUTH AT WEST | Dec 2, 2025 |
| Jul 14, 2025 | C | Apt 208 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 208, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jul 20, 2025 |
| Jul 14, 2025 | A | Apt 208 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE HVAC UNIT AT WEST WALL IN THE 3rd ROOM FROM NORTH LOCATED AT APT 208, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 17, 2025 |
| Nov 18, 2024 | C | §27-2005 (E) HMC: PROVIDE WRITTEN NOTICE TO THE TENANTS AT LEAST TWENTY-FOUR HOURS PRIOR TO ESSENTIAL SERVICE INTERRUPTION BY POSTING A NOTICE IN A PROMINENT PLACE WITHIN THE PUBLIC PART OF THE BUILDING AND ON EACH FLOOR OF SUCH BUILDING, WHERE AN OWNER MUST MAKE A REPAIR THAT MAY RESULT IN AN INTER | Nov 24, 2024 |
| Sep 9, 2024 | B | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND SOUTH WALL AT PUBLIC HALL, 2nd STORY | Oct 14, 2024 |
| Sep 9, 2024 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND SOUTH WALL AT PUBLIC HALL, 2nd STORY | Oct 14, 2024 |
| Jan 30, 2024 | A | Apt 706 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR SOUTH AND WEST WALL IN THE 4th ROOM FROM NORTH LOCATED AT APT 706, 7th STORY, 5th APARTMENT FROM SOUTH AT WEST | May 4, 2024 |
| Oct 3, 2023 | C | Apt 409 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 409, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Oct 29, 2023 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 13, 2026 | HPD C | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLY AT DOOR (LEADING TO PUBLIC HALLWAY FROM VESTIBULE) , 1st STORY | Open |
| Oct 13, 2026 | HPD C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF HOT WATER EXCEEDING 130F DEGREES IN THE ENTIRE APARTMENT LOCATED AT APT 811, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT SOUTH | Open |
| Oct 13, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT DOOR (LEADING TO PUBLIC HALLWAY FROM VESTIBULE) , 1st STORY | Open |
| Oct 7, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 212, 2nd STORY, 4th APARTMENT FROM NORTH AT EAST , SECTION AT SOUTH | Open |
| Sep 17, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 101, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 11:00 AM ET. BBL 2032917501.