4 floors · 42,224 sq ft · built 1910 · class N9 · owner of record: Greenpoint Hospital Shelter Hdfc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (8 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-17 (Accepted). Agency page | Dec 31, 2026 in 68 days | 8 of 8 without an accepted 2026 report yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 42,224 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 189 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 189 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 799 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 14, 2026 | Elevators CLASS - 2 RESTORE SERVICE TO DEVICE. (8.6.5.8.). #39203987K | Nov 25, 2026 PENDING | $625 |
| Sep 14, 2026 | Construction CLASS - 2 ATOI OBSERVED IN THE KITCHEN UNDER THE 2-COMPARTMENT SINK ALL OF THE CONNECTIONS ON THE WASTE WAS WRAPPED IN DUCT TAPE TO STOP LEAKS. THIS IS CONTRARY TO PC 701.2 - DRAINAGE SYSTEMS SHALL BE CONNECTED AND MAINT #39203970Y | Nov 25, 2026 PENDING | $1,250 |
| Sep 14, 2026 | Construction CLASS - 2 AT THE TIME OF INSPECTION OBSERVED THROUGH OUT THE STAIRCASE FIRE PUMP HOSE CONNECTIONS WERE USING PLASTIC CAPS WHICH IS NOT ALOUD MUST BE METAL., REPAIR AND/OR REPLACE #39203969R | Nov 25, 2026 PENDING | $1,250 |
| Dec 2, 2022 | Local Law CLASS - 2 FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 8A & 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #912642.REMEDY:SUBMIT ACCEPTABLE REQUIR #37023489R | Feb 8, 2023 POP/IN-VIO | $0 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 14, 2026 | ECB | Elevators: RESTORE SERVICE TO DEVICE. (8.6.5.8.). | Open |
| Sep 14, 2026 | ECB | Construction: ATOI OBSERVED IN THE KITCHEN UNDER THE 2-COMPARTMENT SINK ALL OF THE CONNECTIONS ON THE WASTE WAS WRAPPED IN DUCT TAPE TO STOP LEAKS. THIS IS CONTRARY TO PC 701.2 - DRAINAGE SYSTEMS SHALL BE CONNECTED AND MAINT | Open |
| Sep 14, 2026 | ECB | Construction: AT THE TIME OF INSPECTION OBSERVED THROUGH OUT THE STAIRCASE FIRE PUMP HOSE CONNECTIONS WERE USING PLASTIC CAPS WHICH IS NOT ALOUD MUST BE METAL., REPAIR AND/OR REPLACE | Open |
| Jul 28, 2026 | ECB | Construction: AT THE TIME OF INSPECTION-OBSERVED OUTRIGGER BEAM SUSPENDED SCAFFOLD INSTALLED AT EXP#2(ROOF) WITH TIEBACK INSTALLED TO ANGLE ANCHORAGE SYSTEM ON CONCRETE WALL-NO PULL TEST PERFORMED/PROVIDED-AS REQUIRED-STOP A | Closed |
| Jul 28, 2026 | ECB | Cranes and Derricks: OBSERVED INSTALLED FIXED MONORAIL MULTIPOINT SUSPENDED SCAFFOLDS ON SITE-UPON CHECKING DOB RECORDS-NO NOTIFICATION FOR FIXED/NON ADJUSTABLE SCAFFOLD PROVIDED TO DOB AS REQUIRED(ONLY COUNTERWEIGHTS /ADJUSTABLE S | Closed |
| Jul 28, 2026 | ECB | Construction: MONORAIL SUSPENDED SCAFFOLD SYSTEM INSTALLED CONTRARY TO PLANS-ATTACHMENT OF BEAMS TO CONCRETE SLAB-USING CHOKE/SLING LINES-AS PER PLAN5/16" WIRE ROPE WITH J-BOLT AT TOP AND BOTTOM,TIMBLE,SHACKLE TO BE USED,ANG | Closed |