Brooklyn · Block 2885 · Lot 35 · 11211

288 Jackson Street

4 floors · 42,224 sq ft · built 1910 · class N9 · owner of record: Greenpoint Hospital Shelter Hdfc

4open violations
$3,125ECB/OATH penalties owed
0HPD class C (immediately hazardous)
68dto Annual boiler inspection (8 boilers)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Annual boiler inspection (8 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-11-17 (Accepted). Agency page

Dec 31, 2026
in 68 days
8 of 8 without an accepted 2026 report yet
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 42,224 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 189 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 189 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 799 days
Next cycle year 2028

Open violations

ECB / OATH (4) · $3,125 owed
IssuedViolationHearingBalance
Sep 14, 2026Elevators CLASS - 2
RESTORE SERVICE TO DEVICE. (8.6.5.8.).
#39203987K
Nov 25, 2026
PENDING
$625
Sep 14, 2026Construction CLASS - 2
ATOI OBSERVED IN THE KITCHEN UNDER THE 2-COMPARTMENT SINK ALL OF THE CONNECTIONS ON THE WASTE WAS WRAPPED IN DUCT TAPE TO STOP LEAKS. THIS IS CONTRARY TO PC 701.2 - DRAINAGE SYSTEMS SHALL BE CONNECTED AND MAINT
#39203970Y
Nov 25, 2026
PENDING
$1,250
Sep 14, 2026Construction CLASS - 2
AT THE TIME OF INSPECTION OBSERVED THROUGH OUT THE STAIRCASE FIRE PUMP HOSE CONNECTIONS WERE USING PLASTIC CAPS WHICH IS NOT ALOUD MUST BE METAL., REPAIR AND/OR REPLACE
#39203969R
Nov 25, 2026
PENDING
$1,250
Dec 2, 2022Local Law CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 8A & 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL & APPURTENANCES REQUIRED BY 28-302.4 FOR CONTROL #912642.REMEDY:SUBMIT ACCEPTABLE REQUIR
#37023489R
Feb 8, 2023
POP/IN-VIO
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 14, 2026ECBElevators: RESTORE SERVICE TO DEVICE. (8.6.5.8.).Open
Sep 14, 2026ECBConstruction: ATOI OBSERVED IN THE KITCHEN UNDER THE 2-COMPARTMENT SINK ALL OF THE CONNECTIONS ON THE WASTE WAS WRAPPED IN DUCT TAPE TO STOP LEAKS. THIS IS CONTRARY TO PC 701.2 - DRAINAGE SYSTEMS SHALL BE CONNECTED AND MAINTOpen
Sep 14, 2026ECBConstruction: AT THE TIME OF INSPECTION OBSERVED THROUGH OUT THE STAIRCASE FIRE PUMP HOSE CONNECTIONS WERE USING PLASTIC CAPS WHICH IS NOT ALOUD MUST BE METAL., REPAIR AND/OR REPLACEOpen
Jul 28, 2026ECBConstruction: AT THE TIME OF INSPECTION-OBSERVED OUTRIGGER BEAM SUSPENDED SCAFFOLD INSTALLED AT EXP#2(ROOF) WITH TIEBACK INSTALLED TO ANGLE ANCHORAGE SYSTEM ON CONCRETE WALL-NO PULL TEST PERFORMED/PROVIDED-AS REQUIRED-STOP AClosed
Jul 28, 2026ECBCranes and Derricks: OBSERVED INSTALLED FIXED MONORAIL MULTIPOINT SUSPENDED SCAFFOLDS ON SITE-UPON CHECKING DOB RECORDS-NO NOTIFICATION FOR FIXED/NON ADJUSTABLE SCAFFOLD PROVIDED TO DOB AS REQUIRED(ONLY COUNTERWEIGHTS /ADJUSTABLE SClosed
Jul 28, 2026ECBConstruction: MONORAIL SUSPENDED SCAFFOLD SYSTEM INSTALLED CONTRARY TO PLANS-ATTACHMENT OF BEAMS TO CONCRETE SLAB-USING CHOKE/SLING LINES-AS PER PLAN5/16" WIRE ROPE WITH J-BOLT AT TOP AND BOTTOM,TIMBLE,SHACKLE TO BE USED,ANGClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 1:04 AM ET. BBL 3028850035.