14 floors · 2391 apartments · 2,948,300 sq ft · built 1962 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 46 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 46 days | Annual |
| Annual boiler inspection (7 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-09-01 (Accepted). Agency page | Dec 31, 2026 in 46 days | 7 of 7 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 62 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 2,948,300 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 167 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 167 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 777 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2033) Likely applies Local Law 87 · Calendar year 2033 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 323). Agency page | Dec 31, 2033 in 2603 days | Next due 2033 |
| Facade inspection report (Cycle 10C) Applies Local Law 11 / FISP · Feb 21, 2027 to Feb 21, 2029 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 1, 2 or 3 are in sub-cycle 10C. DOB facade records for this building show $330,000 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: UNSAFE (2025-03-17) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 21, 2026 | Boilers CLASS - 2 FOUND UNDERGROUND STEAM PIPE LEAKING OUTSIDE OF BUILDING, MAINTAIN BOILER; CORRECT VIOLATING CONDITION SUBMIT CERTIFICATE OF CORRECTION ______________________________________________________________________ #39201364P | Sep 3, 2026 POP/IN-VIO | $0 |
| Jul 17, 2026 | Construction CLASS - 2 OBSERVED AT FRONT ENTRANCE DOOR AN ACTIVE LEAK COMING OUT FROM PIPES AND EXCESSIVE STEAM CAUSING CONDENSATION. THERE'S A PUDDLE IN FRONT OF THE BUILDING BY PUBLIC WALKWAY BY AT EXPOSURE #1. BOILER ROOM DIRECTLY #39196525N | Sep 3, 2026 POP/IN-VIO | $0 |
| Feb 13, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 WEST-INADEQUATE AC SUPPORT MULTI LOC.-EXP #3 EAST (1)CRACKED/BROKEN WINDOW 2ND FL. (2)LOOSE/HANGING MET #35726695X | Mar 12, 2026 POP/IN-VIO | $0 |
| Feb 13, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED AT EXP #1 WEST(1) CRACKED BRICK BY TOP FL WINDOW AT SOUTHWEST END (2)INADEQUATE AC SUPPORT MULTI LOC. (3)MULTI #35726696H | Mar 12, 2026 POP/IN-VIO | $0 |
| Nov 3, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BLDG EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED EXP #1 WEST(1) CRACKED BRICK BY TOP FL WINDOW AT SOUTHWEST END. (2)INADEQUATE AC SUPPORT(WOOD) MULTI LOC. (3)M #35718054X | Nov 24, 2025 POP/IN-VIO | $0 |
| Aug 18, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING EXTERIOR WALL(S) OR APPURTENANCES. NOTE:-AT THE TIME OF INSPECTION OBSERVED (1)AT EXPO #1 WEST ELEVATION CRACK ON MASONARY AND DETERIORATING MORTAR JOINT (2) AT ROOF LEVEL STEP CRAC #35718438P | Sep 8, 2025 POP/IN-VIO | $0 |
| Jun 20, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION OBSERVED STEP CRACK ON PARAPET WALLS OF EXP #1, 3, 4. BROKEN/CRACK GLASS WINDOW EXP #2. SPALLING BRICK OF EXP #3 SPALL #35694056X | Jul 14, 2025 POP/IN-VIO | $0 |
| Nov 26, 2019 | Construction CLASS - 1 FAILURE TO TAKE PROVIDE SAFETY MEASURES SUCH IS SIDEWALK SHEDS FENCE ETC.WHERE REQUIRED TO PROTECT AND SECURE PUBLIC SAFETY FROM DOCUMENTED UNSAFE FACADE BY PE/RA ON 10/17/2019.UNSAFE FACADE NOTIFICATION COMPLI #35444888R | Feb 13, 2020 POP/IN-VIO | $0 |
| Jun 29, 2018 | Construction CLASS - 2 REMOVAL OF SIDEWALK SHED WITHOUT APPROVAL.NOTE:AT THE TIME OF INSPECTION BUILDING FACADE WAS STILL DESIGNATED AS UNSAFE.THE AMENDED FACADE REPORT (TR6)800651-8C-A1 REVISED ON 06/22/2018 HAS NOT BEEN ACCEPTED AN #35318921M | Sep 13, 2018 POP/IN-VIO | $0 |
| Jun 29, 2018 | Construction CLASS - 2 REMOVAL OF SIDEWALK SHED WITHOUT DEPARTMENT APPROVAL.NOTE:AT TIME OF INSPECTION BUILDING FACADE WAS STILL DESIGNATED AS UNSAFE.THE AMENDED FACADE REPORT(TR6)800646-8C-AL REVISED ON 06/22/2018 HAS NOT BEEN ACCEP #35318922Y | Sep 13, 2018 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 20, 2025 | CONSTRUCTION EMERGENCY WORK ORDER DUE TO CRACKED/SPALLING SLATE COPING STONES AT EXPOSURE #3 EAST ELEVATION AT FIRST FLOOR SETBACK. REMEDY: PROVIDE ADEAUATE SAFETY MEASURES (IE. FENCING/NETTING) UNDER DIRECTION OF LICENSED PROFESSIONAL AT EXPOSURE #3 EAST ELEVATION #FA10309DO | DOB VIOLATION - ACTIVE |
| Jun 23, 2024 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2023 #10010 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #01591 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00039 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00038 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00042 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00052 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00047 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00051 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00045 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00044 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00043 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00041 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00050 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00046 | DOB VIOLATION - ACTIVE |
| Aug 3, 2021 | CONSTRUCTION FAILURE TO COMPLY WITH PREVIOUS COMMISSIONER'S ORDER. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #102419CLLF02NS. AS OF 8/3/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONER'S ORDER #LLF02KI | DOB VIOLATION - ACTIVE |
| Oct 28, 2019 | FACADE SAFETY PROGRAM #HAZ88420 | DOB VIOLATION - ACTIVE |
| Oct 28, 2019 | FACADE SAFETY PROGRAM #HAZ88435 | DOB VIOLATION - ACTIVE |
| Oct 24, 2019 | CONSTRUCTION ON 10/24/2019 AT 2FL DETERIORATION CONDITIONS AT AWNING. CRACKS AND DAMAGED MORTAR JOINTS AND A/C SUPPORTED BY WOOD RMEMDY:MAINTAIN BUILDING EXTERIOR WALLS/FACADE AND APPURTENANCE REPAIR/MAKE FACADE SAFE. PROVIDE ADEQUATE SAFETY MEASURES AS PER 1RCNY 103-04 #LLF02NS | DOB VIOLATION - ACTIVE |
| Oct 16, 2019 | FACADE SAFETY PROGRAM #HAZ88406 | DOB VIOLATION - ACTIVE |
| Oct 16, 2019 | FACADE SAFETY PROGRAM #HAZ88407 | DOB VIOLATION - ACTIVE |
| Oct 15, 2019 | FACADE SAFETY PROGRAM #HAZ88405 | DOB VIOLATION - ACTIVE |
| Oct 15, 2019 | FACADE SAFETY PROGRAM #HAZ88404 | DOB VIOLATION - ACTIVE |
| May 16, 2018 | FACADE SAFETY PROGRAM #HAZ87479 | DOB VIOLATION - ACTIVE |
| May 16, 2018 | FACADE SAFETY PROGRAM #HAZ87478 | DOB VIOLATION - ACTIVE |
| Jan 31, 2018 | FACADE SAFETY PROGRAM #HAZ87123 | DOB VIOLATION - ACTIVE |
| Dec 20, 2016 | FACADE SAFETY PROGRAM #HAZ6382 | DOB VIOLATION - ACTIVE |
| Sep 20, 2013 | LL11/98-LOCAL LAW 11/98 - FACADE CYCLE 7 UNSAFE REPORT FILED #HAZ74614 | DOB VIOLATION - ACTIVE |
| Sep 20, 2013 | LL11/98-LOCAL LAW 11/98 - FACADE CYCLE 7 UNSAFE REPORT FILED #HAZ74613 | DOB VIOLATION - ACTIVE |
| Sep 20, 2013 | LL11/98-LOCAL LAW 11/98 - FACADE CYCLE 7 UNSAFE REPORT FILED #HAZ74618 | DOB VIOLATION - ACTIVE |
| Sep 20, 2013 | LL11/98-LOCAL LAW 11/98 - FACADE CYCLE 7 UNSAFE REPORT FILED #HAZ74610 | DOB VIOLATION - ACTIVE |
| Sep 20, 2013 | LL11/98-LOCAL LAW 11/98 - FACADE CYCLE 7 UNSAFE REPORT FILED #HAZ74611 | DOB VIOLATION - ACTIVE |
| Feb 19, 2002 | LOCAL LAW 10/81 - ELEVATOR #00240 | DOB VIOLATION - ACTIVE |
| Mar 8, 2001 | LOCAL LAW 10/81 - ELEVATOR #00221 | DOB VIOLATION - ACTIVE |
| Mar 10, 2000 | LOCAL LAW 10/81 - ELEVATOR #00208 | DOB VIOLATION - ACTIVE |
| Jan 20, 1999 | LOCAL LAW 10/81 - ELEVATOR #00216 | DOB VIOLATION - ACTIVE |
| Oct 12, 1989 | LL10/81-LOCAL LAW 10/81 - ELEVATOR #00438 | DOB VIOLATION - ACTIVE |
| Mar 2, 1989 | ELEVATOR (51) ELIMINATE EXCESSIVE VIBRATION IN CAR #1179A/04 | DOB VIOLATION - ACTIVE |
| Mar 1, 1989 | ELEVATOR (45)CLEAN PIT, AND PROVIDE LIGHT #1179A/05 | DOB VIOLATION - ACTIVE |
| Feb 14, 1989 | ELEVATOR (17)REPAIR OR RENEW & CLEAN CAR MATERIAL #142607-10 | DOB VIOLATION - ACTIVE |
| Mar 8, 1988 | ELEVATOR #142632 | DOB VIOLATION - ACTIVE |
| May 24, 1984 | ELEVATOR #138552 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 3) | Active |
| Jun 23, 2024 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 28, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Oct 28, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Oct 16, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Oct 16, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Oct 15, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Oct 15, 2019 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Apr 30, 2019 | Facades FISPNRF FAILED TO FILE FISP CYCLE 8C TECHNICAL REPORT BY 02/21/2019 | Active |
| May 16, 2018 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| May 16, 2018 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Jan 31, 2018 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Sep 20, 2013 | Facades LL11/98 CYCLE 7 UNSAFE REPORT FILED | Active |
| Sep 20, 2013 | Facades LL11/98 CYCLE 7 UNSAFE REPORT FILED | Active |
| Sep 20, 2013 | Facades LL11/98 CYCLE 7 UNSAFE REPORT FILED | Active |
| Sep 20, 2013 | Facades LL11/98 CYCLE 7 UNSAFE REPORT FILED | Active |
| Sep 20, 2013 | Facades LL11/98 CYCLE 7 UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Mar 30, 2023 | A | Apt GC · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM EAST, THE KITCHEN , THE FOYER , THE BATHROOM , THE 2nd ROOM FROM EAST, THE 2nd PRIVATE HALLWAY FROM EAST, THE 4th ROOM FROM EAST, THE 5th ROOM FROM EAST AT NORTH L | Jul 3, 2023 |
| Dec 13, 2005 | A | Apt GA · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILINGS AND WALLS IN THE ENTIRE APARTMENT LOCATED AT APT GA, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 23, 2006 |
| Dec 13, 2005 | A | Apt GA · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOOR IN THE ENTRANCE LOCATED AT APT GA, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 23, 2006 |
| Dec 13, 2005 | A | Apt GA · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOWER WINDOW GLASS IN THE 1st ROOM FROM NORTH LOCATED AT APT GA, 1st STORY, 1st APARTMENT FROM WEST AT NORTH | Mar 23, 2006 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Closed |
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Affirmation of Correction | Closed |
| Oct 2, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Periodic Inspection Report | Closed |
| Aug 21, 2026 | ECB | Boilers: FOUND UNDERGROUND STEAM PIPE LEAKING OUTSIDE OF BUILDING, MAINTAIN BOILER; CORRECT VIOLATING CONDITION SUBMIT CERTIFICATE OF CORRECTION ______________________________________________________________________ | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 15, 2026, 3:40 AM ET. BBL 1003230001.