2.5 floors · 2 apartments · 1,871 sq ft · built 1910 · class B2 · owner of record: Firza, Fatbardha
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2025-09-01 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 12, 2026 | Construction CLASS - 1 ATOI OBSERVED AT REAR YARD EXPOSURE THREE 2ND LEVEL A HORIZONTAL ENCLOSED EXTENSION ATTACHED TO EXISTING PROPERTY. EXTENSION CONSIST OF METAL SHEATHING, WOOD FRAMING, ROOF, VERTICAL POST. NO PERMIT FILED WITH D #39200258R | Oct 16, 2026 DEFAULT | $2,530 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 24, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Jan 26, 2026 | C | Apt 1 · § 27-2029 ADMIN. CODE: PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st APARTMENT FROM NORTH AT EAST | Jan 25, 2026 |
| Sep 24, 2025 | C | Apt 1 · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING, 1st WINDOW FRAME FROM EAST AT SOUTH WALL IN THE 5th ROOM FROM NORTH AT WEST L | Oct 18, 2025 |
| Nov 7, 2024 | C | Apt 1 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 3, 2024 |
| Nov 7, 2024 | B | Apt 1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...WOOD FLOORS IN THE 4th ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 12, 2024 |
| Nov 7, 2024 | B | Apt 1 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ...WOOD FLOORS IN THE 3rd ROOM FROM NORTH AT WEST LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 12, 2024 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 12, 2026 | ECB | Construction: ATOI OBSERVED AT REAR YARD EXPOSURE THREE 2ND LEVEL A HORIZONTAL ENCLOSED EXTENSION ATTACHED TO EXISTING PROPERTY. EXTENSION CONSIST OF METAL SHEATHING, WOOD FRAMING, ROOF, VERTICAL POST. NO PERMIT FILED WITH D | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 6:12 AM ET. BBL 2042430019.