Manhattan · Block 2036 · Lot 13 · 10039

285 West 150 Street

5 floors · 35 apartments · 16,336 sq ft · built 1920 · class C1 · owner of record: Shuhab Hdfc

12open violations
$0ECB/OATH penalties owed
3HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 778 days
Next cycle year 2028
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-17 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Apr 8, 1992CONSTRUCTION

#D4PR01
VIOLATION UNSERVED ECB-ACTIVE
Apr 17, 1989CONSTRUCTION

#D4TR02
VIOLATION UNSERVED ECB-ACTIVE
DOB NOW Safety (1)
IssuedViolationStatus
Oct 25, 2024Boiler FTC-BE-EXT-LP
Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device
Active
HPD (9) · C 3 · B 3 · A 3
IssuedClassViolationCorrect by
Nov 9, 2026CApt 17 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 17 , 5th STORY, 1st APARTMENT FROM WEST AT NORTHDec 5, 2026
Sep 1, 2026BApt UNIT17 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT CEILING AND WALLS IN THE BATHROOM LOCATED AT PENTHOUSE UNIT17, 5th STORY, 1st PENTHOUSE FROM WEST AT NORTHOct 6, 2026
Nov 24, 2025BApt 7 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RUBBER GASKET AT LOWER REFRIGERATOR DOOR IN THE KITCHEN LOCATED AT APT 7, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTHDec 29, 2025
Sep 29, 2025AApt 1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE KITCHEN LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJan 2, 2026
Sep 29, 2025AApt 1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJan 2, 2026
Sep 29, 2025AApt 1 · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT WINDOW RECESS AT WEST WALL IN THE BATHROOM LOCATED AT APT 1, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJan 2, 2026
Jul 9, 2025CApt 18 · § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICATIONS OF THE NEW YORK CITY HEALTH CODE SECTION 24 RCNY CHAPTER 12. WG TO INSTALL = 0, WG TO REPLACE = 0, WG TO REPAIR = 1 IN THE ENTIRE APARTMENT LOCATED AT APT 18, 5th STORY, 2nd APARAug 4, 2025
Jul 8, 2025BApt 18 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE HARDWOOD FLOOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 18, 5th STORY, 2nd APARTMENT FROM WEST AT NORTHAug 12, 2025
May 30, 2023CApt 17 · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 17, 5th STORY, 1st APARTMENT FROM WEST AT NORTHJun 25, 2023

Issued in the last 120 days

DateSourceWhatNow
Nov 9, 2026HPD CHMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 17 , 5th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Sep 1, 2026HPD B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT CEILING AND WALLS IN THE BATHROOM LOCATED AT PENTHOUSE UNIT17, 5th STORY, 1st PENTHOUSE FROM WEST AT NORTHOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 3:57 AM ET. BBL 1020360013.

Look up another building