15 floors · 86 apartments · 159,770 sq ft · built 1926 · class D4 · owner of record: 285 Riverside Drive Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 70 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 70 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 86 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 159,770 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 191 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 191 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1166 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1889). Agency page | Dec 31, 2029 in 1166 days | Next due 2029 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-14 (Accepted). Agency page | On file | 2026 reports accepted |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $489,120 in late-filing or failure-to-file penalties. Agency page | On file | Cycle 10 filing on record: SAFE (2025-03-27) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 20, 2024 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR WALLS AND/OR APPURTENANCES.-AT TIME OF INSPECTION OBSERVED CRACKED/SPALLED MASONRY AT MULTIPLE LOCATIONS OF EXPOSURES 1(NORTH ELEVATION) AND 4(WEST ELEVATION).-BROKEN WINDOW AT APPR #35685180Z | Feb 20, 2025 IN VIOLATION | $0 |
| Jan 16, 2024 | Local Law CLASS - 2 FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 9A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FACADES REPORT REQUIRED BY 28-302.5 FOR CONTROL #906588. REMEDY: FILE ACCEPTABLE REPORT. #37026271H | May 16, 2024 IN VIOLATION | $0 |
| Oct 8, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN EXTERIOR BUILDING WALLS AND APPURTENANCES.AS NOTED:AT TIME OF INSPECTION OBSERVED AT EXP #3 SOUTH ELEVATION CRACK IN MASONRY WINDOW SILL AT 11TH FLOOR MISSING BROKEN SILL ON 11TH FLOOR CRACK #35635436H | Apr 27, 2023 IN VIOLATION | $1,250 |
| Issued | Violation | Status |
|---|---|---|
| Nov 22, 2021 | ELEVATOR #9028/710086 | DOB VIOLATION - ACTIVE |
| Nov 22, 2021 | ELEVATOR #9028/710089 | DOB VIOLATION - ACTIVE |
| Nov 22, 2021 | ELEVATOR #9028/710088 | DOB VIOLATION - ACTIVE |
| Nov 22, 2021 | ELEVATOR #9028/710087 | DOB VIOLATION - ACTIVE |
| Sep 15, 2021 | HAZARDOUS CONDITION (FACADE) CYCLE 9A UNSAFE REPORT FILED #909524 | DOB VIOLATION - ACTIVE |
| Sep 15, 2021 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00147 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #08726 | DOB VIOLATION - ACTIVE |
| Jun 28, 1993 | LOCAL LAW 10/81 - ELEVATOR 2 #01858 | DOB VIOLATION - ACTIVE |
| Nov 22, 1988 | ELEVATOR (51) FILE BN FOR BASEMENT DOOR INTERLOCK #1474C-3 | DOB VIOLATION - ACTIVE |
| Nov 22, 1988 | ELEVATOR #1474C-2 | DOB VIOLATION - ACTIVE |
| Nov 22, 1988 | ELEVATOR (51) COVER TAG LIGHT (52) PROVIDE CAPACITY PLATE #1474C-1 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 10, 2025 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2024 Cat1 Test Affirmation of Correction | Active |
| Sep 15, 2021 | Facades FISPFCS CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS | Active |
| Sep 15, 2021 | Facades FISPHAZ CYCLE 9A UNSAFE REPORT FILED | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Jun 28, 1993 | Elevators LL1081 | Active |
| Jun 28, 1993 | Elevators LL1081 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Feb 26, 2019 | A | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF HOOK WITH EYE AT VESTIBULE DOOR LEADING INTO THE BUILDING AT PUBLIC HALL, 1st STORY | Jun 1, 2019 |
| Feb 26, 2019 | A | § 27-2005, 2007 ADM CODE REMOVE DEVICE PREVENTING DOOR FROM BEING SELF-CLOSING CONSISTING OF HOOK WITH EYE AT ENTRANCE DOOR TO THE BUILDING AT PUBLIC HALL, 1st STORY | Jun 1, 2019 |
| Feb 25, 2019 | B | Apt 8B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILINGS AND ALL WALLS THROUGH-OUT IN THE ENTIRE APARTMENT LOCATED AT APT 8B, 8th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION AT WEST | Apr 1, 2019 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 22, 2026, 5:00 PM ET. BBL 1018890036.