5 floors · 62,725 sq ft · built 1910 · class W1 · owner of record: Nyc Department Of Education
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 47 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 62,725 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 168 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 168 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 3 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 778 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2031) Likely applies Local Law 87 · Calendar year 2031 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 331). Agency page | Dec 31, 2031 in 1873 days | Next due 2031 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-06-04 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Sep 8, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED 5-STORY BUILDING, INACTIVE SITE WITH SHED/STORAGE ZONE AT EXP. 1. STORAGE ZONE BLOCKED PS 110 SCHOOL CROSSING SIGN, REDUCING VISIBILITY TO DRIVERS. MISSING PARAPET/CATCH SECTIONS #39558863L | Nov 12, 2026 ADMIT/IN-VIO | $0 |
| Aug 26, 2025 | Construction CLASS - 2 RE-ISSUE #35683054Z. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: WATER PENETRATION THROUGH EXT. WALLS HAVE CAUSED OBVIOUS DAMAGE AND STAINS IN ROOMS 406, 306 AND 207. REMEDY: REPAIR/REPLACE. #35693266J | Sep 10, 2025 POP/IN-VIO | $0 |
| Aug 26, 2025 | Construction CLASS - 2 RE-ISSUE #35683052P. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT SEVERAL LOCATIONS; BULKHEADS, AND STAIRWAYS D AND OTHERS. WALLS AND CEILINGS ARE PEELING AND CRACKING FROM WATER AND DAMAGES #35693265H | Sep 10, 2025 POP/IN-VIO | $0 |
| Sep 5, 2024 | Construction CLASS - 2 REISSUE#35674860Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:AT 5TH FLOOR BULKHEAD,SPALLING PLASTER DUE TO WATER PENETRATION FROM ROOF,WATER PENETRATION AT STAIRWAY D.REM:MAKE NECESSARY REPAIRS #35683052P | Nov 14, 2024 POP/IN-VIO | $0 |
| Sep 5, 2024 | Construction CLASS - 2 REISSUE#35674859L FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCESNOTED:WATER PENETRATION INTO THE CLASSROOM 406,306,207 THROUGH EXTERIOR WALL THAT HAS BECOME POROUS.REM:MAKE NECESSARY REPAIRS. #35683054Z | Nov 14, 2024 POP/IN-VIO | $0 |
| Apr 11, 2023 | Construction CLASS - 2 REISSUE#35643322J FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION I OBSERVED AT THE ROOF LEVEL BULKHEAD LEAK CAUSING WATER DAMAGE TO STAIRCASE WAS ALSO ROOF LEAKING IN VARIOUS APTS #35674860Z | Aug 24, 2023 POP/IN-VIO | $0 |
| Apr 11, 2023 | Construction CLASS - 2 REISSUE#35643323L FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. AT TIME OF INSPECTION I OBSERVED AT EXPOSURE #3 FACADE WATER PENETRATION THROUGHOUT WALLS IN RM 406, 206, 204 EXTERIOR WALL, VIOLATION I #35674859L | Jun 20, 2023 POP/IN-VIO | $0 |
| May 13, 2022 | Construction CLASS - 2 REISSUE36554030N FAILURE TO MAINTAIN BLDG WALL(S) OR APPURTENANCE,ATO MY INSP I OBSERVED@EXP3 FACADE WATER PENETRATION THRU WALLS IN RM406,206,207 EXTERIOR WALLS VIO36554030N ISSUED4/28/21 FOR VIO CONDITION NEE #35643323L | Oct 13, 2022 POP/IN-VIO | $0 |
| May 13, 2022 | Construction CLASS - 2 REISSUE #35554031P FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.AT TIME OF INSPECTION OBSERVED AT ROOF LEVEL BULKHEAD D LEAKS CAUSING DAMAGE TO STAIRCASE D WAS ALSO ROOF LEAKS IN VARIOUS AREAS CAUSING #35643322J | Oct 27, 2022 POP/IN-VIO | $0 |
| Apr 28, 2021 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COMPLIANT MANNER. NOTE: AT ROOF LEVELBULKHEAD D LEAKS CAUSING DAMAGE TO STAIRCASE D WALLS. ALSO THE ROOF LEAKS IN VARIOUS AREAS CAUSING DAMAGE TO CEILING IN ROOMS BELOW. #35554031P | Sep 2, 2021 POP/IN-VIO | $0 |
| Apr 28, 2021 | Construction CLASS - 2 REISSUE35473369H FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES NOTE@EXP3 WATER PENETRATION THRU WALLS IN RMS 406,306,207.MAINTAIN BLDG EXTERIOR WALLS. #35554030N | Sep 2, 2021 POP/IN-VIO | $0 |
| May 29, 2020 | Construction CLASS - 2 REISSUE#35415377M FAILURE TO MAINTAIN BLDG WALLS & APPURTENANCE. NOTE WATER PENETRATION THROUGH WALLS IN ROOMS 406,306,& 207 AT EXP#3. REMEDY: MAINTAIN BLDG EXTERIOR WALLS. #35473369H | Jul 6, 2020 POP/IN-VIO | $0 |
| May 10, 2019 | Construction CLASS - 2 RE-ISSUE #35322437M.FAILURE TO MAINTAIN BUILDING WALL(S)OR APPURTENANCES.NOTED:ON THE 2ND FL.,ROOM 207 CEILING IS SHOWING SIGNS OF WATER DAMAGE. #35415377M | Aug 8, 2019 POP/IN-VIO | $0 |
| Mar 12, 2018 | Construction CLASS - 2 REISSUE #35252755R. FAILURE TO MAINTAIN BUILDING WALL(S) OR APPURTENANCES. NOTED: AT TIME OF INSPECTION OBSERVED EXTERIOR WALL HAS BECOME POROUS ALLOWING RAIN WATER TO ENTER ROOM 307 AND 207. ALSO, AT BASEMENT #35322437M | Jul 5, 2018 POP/IN-VIO | $0 |
| Apr 6, 2017 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG WALLS OR APPURTENANCES EXTERIOR WALL HAS BECOME POROUS WATER VISIBLE AT ROOMS 406,207,306. REMEDY: REPAIR OR REPLACE MAINTAIN EXTERIOR BLDG. #35252755R | Jun 1, 2017 POP/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Dec 15, 2025 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2024 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 8, 2026 | ECB | Construction: AT TIME OF INSPECTION, OBSERVED 5-STORY BUILDING, INACTIVE SITE WITH SHED/STORAGE ZONE AT EXP. 1. STORAGE ZONE BLOCKED PS 110 SCHOOL CROSSING SIGN, REDUCING VISIBILITY TO DRIVERS. MISSING PARAPET/CATCH SECTIONS | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 14, 2026, 10:45 PM ET. BBL 1003310140.