Brooklyn · Block 7005 · Lot 22 · 11224

2842 West 35 Street

2 floors · 4 apartments · 3,160 sq ft · built 1927 · class C3 · owner of record: Bank Of America, N.A.

339open violations
$13,750ECB/OATH penalties owed
112HPD class C (immediately hazardous)
Overdueto Annual property registration

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

OverdueRegistration expired 2014-09-01
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 13 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1143 days
Next cycle year 2029

Open violations

ECB / OATH (13) · $13,750 owed
IssuedViolationHearingBalance
Nov 5, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39166257Z .AS OF 11/5/2026., FILE A CERTIFICATE
#39210841N
Jan 20, 2027
PENDING
$1,250
Nov 7, 2025Construction CLASS - 1
FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT. AT TIME OF INSPECTION, UNIT 1R KITCHEN AND BATHROOM CEILING IS PARTIALLY COLLAPSING DUE TO A WATER LEAK FROM UNKNOWN SOURCE. IN ADDITION, FLOOR JOIST FROM THE S
#39166257Z
Dec 10, 2026
DEFAULT
$12,500
May 1, 2015Construction CLASS - 1
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIOLATION #35029278L ISSUED ON 11/4/13. FOR WORK W/O A PERMIT AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITIONS CREATING 3 BEDROOMS & BATHROOM.
#35063164M
Jun 15, 2015
WRITTEN OFF
$0
Mar 12, 2015Construction CLASS - 1
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOV#35029278L ISSUED ON 11/04/13 CELLAR WORK W/O PERMIT. RMDY: COMPLY W/COMMISSIONER'S ORDER.
#35061417M
Apr 27, 2015
WRITTEN OFF
$0
Jan 23, 2015Construction CLASS - 1
FAILURE TO COMPLY W.COMMISSIONER'S ORDER CONTAINED IN NOV #35029278L ISSUED ON 11/4/13 CELLAR WORK W/O PERMIT. RMDY: COMPLY WITH THE COMMISSIONER'S ORDER.
#35061379K
Mar 9, 2015
WRITTEN OFF
$0
Dec 18, 2014Construction CLASS - 1
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIOLATION #35029278L ISSUED ON 11/4/13. CELLAR WORK W/O PERMIT. REMEDY: COMPLY W/THE COMM'S ORDER.
#35060751N
Feb 2, 2015
WRITTEN OFF
$0
Oct 16, 2014Construction CLASS - 1
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIOLATION #35029278L ISSUED ON 11/4/13. CELLAR WORK W/O PERMIT. REMEDY: COMPLY W/THE COMM'S ORDER.
#35057935K
Dec 1, 2014
WRITTEN OFF
$0
Aug 25, 2014Construction CLASS - 1
FAILURE TO COMPLY W/ THE COMMISSIONER'S ORDER CONTAINED IN NOTICE OF VIO. # 35029278L ISSUED ON 11/04/13. CONVERSION AT CELLAR W/ OUT PERMITREMEDY: COMPLY W/ THE COMMISSIONER'S ORDER.
#35056800Z
Oct 20, 2014
WRITTEN OFF
$0
Jun 28, 2014Construction CLASS - 1
FAIL TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOTICE OF VIO#35029278LISSUED ON 11/04/13.WORK W/O PERMIT.@ CELLAR,INSTALLED FULL HEIGHT PARTITIONS & PLUMBING.REM:COMPLY W/THE COMM'S ORDER.
#35055024K
Aug 18, 2014
WRITTEN OFF
$0
May 1, 2014Construction CLASS - 1
FAILURE TO COMPLY W/ COMMISSIONER'S ORDER TO CORRECT VIOLATION # 35029278L ISSUED ON 11/04/13. REMEDY: COMPLY WITH ORDER
#35085796H
Jun 16, 2014
WRITTEN OFF
$0
Mar 12, 2014Construction CLASS - 1
FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOV #35029278L ISSUED ONN 11.4.13 ILLEGAL WORK IN BASEMENT. REMEDY: COMPLY W/THE COMMISSIONER'S ORDER.
#35054750K
Apr 28, 2014
WRITTEN OFF
$0
Nov 4, 2013Quality of Life CLASS - 2
RESIDENCE ALTERED AS A DWELLING FOR MORE THAN THE LEGALLY APPROVED NUMBER OF FAMILIES. DOB RECORDS (HPD REGISTRATION #302-667) INDICATE RESIDENCE IS A LEGAL 4FAMILY DWELLING (2ST AND 2ND FLR TWO UNITS EACH).RES
#35029277J
Dec 23, 2013
WRITTEN OFF
$0
Nov 4, 2013Construction CLASS - 1
WORK W/O A PERMIT. WORK NOTED: AT CELLAR LEVEL ERECTED FULL HEIGHT PARTITIONS CREATING 3 BEDROOMS, 1 ROOM AND A BATHROOM. INSTALLED GAS LINEFOR STOVE AND WATER AND WASTE LINES FOR 3PC BATHROOM (SHOWER,TOILET,SI
#35029278L
Dec 23, 2013
WRITTEN OFF
$0
DOB (1)
IssuedViolationStatus
Jan 29, 2014FAIL TO CERTIFY CLASS 1
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
#00258
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 13)
Active
Jan 29, 2014AEUHAZ FTC-AEU-HAZ
Active
HPD (323) · C 112 · B 142 · A 64
IssuedClassViolationCorrect by
Nov 21, 2023I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
Feb 25, 2015I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
Nov 27, 2024I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
Feb 2, 2015I§27-2153 ADM CODE THE PREMISES HAS BEEN SELECTED TO PARTICIPATE IN THE ALTERNATIVE ENFORCEMENT PROGRAM WHICH MAY RESULT IN BUILDING-WIDE INSPECTIONS, FEES, AND EXTENSIVE REPAIR WORK TO CORRECT VIOLATIONS AND UNDERLYING CONDITIONS. CHARGES FOR REPAIR WORK DONE PURSUANT TO THIS ORDER, IF NOT PAID, WIL—
Nov 20, 2025I§27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R—
May 20, 2026BApt 2F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY ORIGINAL VIOLATION 18584197 ISSUED 16-JAN-26 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017.3a(3)(a) or (b).Jun 24, 2026
May 6, 2026A(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.Aug 9, 2026
Feb 5, 2026BApt 1R · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THEN 10 SQ FT AT CEILING AND WEST WALL IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 18284329 ISSUED 01-OCT-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE Mar 12, 2026
Jan 21, 2026C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICKS AND MORTAR EXTERIOR SOUTH WALL FROM TOP STORY TO BOTTOM AT NORTH YARDJan 27, 2026
Jan 21, 2026C§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING HOOK AND EYE AT VESTIBULE DOOR AT PUBLIC HALL, 1st STORYJan 27, 2026
Jan 20, 2026BApt 2F · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026CApt 2F · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS SHOWER HEAD IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJan 26, 2026
Jan 20, 2026BApt 2F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT NORTH WALL IN THE 2nd ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026CApt 2F · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT SOUTH , WEST AND EAST WALLS IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTFeb 15, 2026
Jan 20, 2026B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 30 SQ FEET AT EAST AND WEST WALLS AT BOILER ROOMFeb 24, 2026
Jan 20, 2026BApt 2F · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTFeb 24, 2026
Jan 20, 2026B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BASEMENTFeb 24, 2026
Jan 20, 2026AApt 2F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THROUGHOUT ALL WALLS AND CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTApr 25, 2026
Jan 20, 2026B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... THROUGHOUT ALL CEILING AT BASEMENTFeb 24, 2026
Jan 20, 2026CApt 2F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJan 26, 2026
Jan 20, 2026CApt 2F · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM NORTH AT EASTJan 17, 2026
Jan 20, 2026C§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AT BOILER ROOMJan 26, 2026
Jan 13, 2026C§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AT BOILER ROOMJan 19, 2026
Jan 5, 2026C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BOILER AT BASEMENTJan 11, 2026
Jan 5, 2026B§ 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING AT BOILER ROOM AT BASEMENTFeb 9, 2026
Dec 22, 2025C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LOCK AT BUILDING ENTRANCE AT PUBLIC HALL, 1st STORYDec 28, 2025
Dec 16, 2025C§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT BASEMENTDec 22, 2025
Dec 16, 2025B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 1st STORYJan 20, 2026
Dec 16, 2025B§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT BASEMENTJan 20, 2026
Dec 16, 2025B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING AND EAST WALL EQUAL TO 40 SQ. FEET AT BASEMENTJan 20, 2026
Nov 26, 2025A§ 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORYMar 1, 2026
Nov 26, 2025C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE LOCK AT THE BUILDING ENTRANCE DOOR , 1st STORYDec 2, 2025
Nov 26, 2025A§27-2045(B)(5) HMC, § 12-06, 12-10 RCNY POST A PROPER NOTICE OF CARBON MONOXIDE DETECTING DEVICE REQUIREMENTS, IN A FORM APPROVED BY COMMISSIONER, IN A COMMON AREA OF A CLASS A MULTIPLE DWELLING NEAR INSPECTION CERTIFICATE OR PROVIDE NOTICE TO TENANTS IN PRIVATE DWELLINGSMar 1, 2026
Nov 26, 2025A§ 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED AT PUBLIC HALL, 1st STORYMar 1, 2026
Nov 26, 2025A§ 27-2053 ADM CODE POST SIGN ON WALL OF ENTRANCE STORY BEARING NAME, ADDRESS INCLUDING APARTMENT NUMBER IF ANY, AND TELEPHONE NUMBER OF SUPERINTENDENT, JANITOR OR HOUSEKEEPER. AT PUBLIC HALL, 1st STORYMar 1, 2026
Nov 26, 2025C§ 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT PUBLIC HALL, 1st STORYDec 2, 2025
Nov 26, 2025A§27-2045(B)(5) HMC, § 12-01 RCNY POST A PROPER NOTICE OF SMOKE DETECTOR REQUIREMENTS, IN A FORM APPROVED BY THE COMMISSIONER, AT OR NEAR THE MAILBOX AT PUBLIC HALL, 1st STORYMar 1, 2026
Nov 26, 2025A§ 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR AT PUBLIC HALL, 1st STORYMar 1, 2026
Nov 26, 2025A§ 27-2104 ADM CODE POST AND MAINTAIN A PROPER SIGN ON WALL OF ENTRANCE STORY SHOWING THE REGISTRATION NUMBER ASSIGNED BY THE DEPARTMENT AND THE ADDRESS OF THE BUILDING. AT PUBLIC HALL, 1st STORYMar 1, 2026
Nov 26, 2025A§ 27-2022 ADM CODE POST A SIGN INDICATING HOURS OF COLLECTION AND METHOD OF COLLECTION OF WASTE MATERIAL WHERE DUMBWAITER SERVICE IS NOT PROVIDED. AT PUBLIC HALL, 1st STORYMar 1, 2026
Nov 26, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE BUILDING ENTRANCE DOOR HINGES , 1st STORYDec 10, 2025
Nov 10, 2025CApt 1R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNov 16, 2025
Nov 10, 2025BApt 1R · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTDec 15, 2025
Nov 10, 2025C§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORYNov 16, 2025
Nov 10, 2025C§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DOOR LEADING TO BASEMENT AT PUBLIC HALL, 1st STORYNov 24, 2025
Nov 10, 2025CApt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNov 16, 2025
Nov 10, 2025CApt 1R · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNov 16, 2025
Nov 10, 2025CApt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNov 16, 2025
Nov 10, 2025BApt 1R · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTDec 15, 2025
Oct 28, 2025B§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROX 30 SQ FEET AT CEILING AND ALL WALLS AT BASEMENTDec 2, 2025
Oct 28, 2025C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE BRICKS AND MORTAR EXTERIOR SOUTH WALL AT TOP STORY TO BOTTOM , 1st STORYNov 3, 2025
Oct 28, 2025C§ 27-2005, 2006, 2037 HMC: PROPERLY REPAIR AND ABATE UNSAFE ELECTRIC WIRING CONDITION CONSISTING OF EXPOSED ELECTRIC WIRES AT CEILING AT BASEMENTNov 3, 2025
Oct 28, 2025B§ 27-2005 ADM CODE REPLACE WITH NEW THE MISSING COVER AT ELECTRIC PANEL AT BASEMENTDec 2, 2025
Oct 28, 2025B§ 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOUSEHOLD ITEMS AT PUBLIC HALL, 2nd STORYDec 2, 2025
Oct 28, 2025C§ 27-2026 ADM CODE REPAIR THE BROKEN OR DEFECTIVE CONNECTION WASTE PIPE AT CEILING AT BASEMENTNov 3, 2025
Oct 28, 2025C§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND ALL WALLS THROUGHOUT AT BASEMENTNov 3, 2025
Oct 8, 2025AApt 1R · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJan 11, 2026
Oct 8, 2025AApt 1R · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE KITCHEN LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTJan 11, 2026
Oct 8, 2025BApt 1R · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASTELINE AT WASHBASIN IN THE BATHROOM LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNov 12, 2025
Oct 8, 2025CApt 1R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM SOUTH AT WESTNov 3, 2025

Showing 60 of 323. Full list on the agency site.

Issued in the last 120 days

DateSourceWhatNow
Nov 5, 2026ECBConstruction: FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.NO CERTIFICATE OF CORRECTION ON FILE FOR VIO#39166257Z .AS OF 11/5/2026., FILE A CERTIFICATEOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 5:33 PM ET. BBL 3070050022.

Look up another building