3 floors · 2 apartments · 4,416 sq ft · built 1930 · class B9 · owner of record: Leonard Chin
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 292 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jan 31, 2026 | Construction CLASS - 2 28-305.1. FAILURE TO MAINTAIN RETAINING WALL. AS NOTED: AT TIME OF INSPECTION OBSERVED RETAINING WALL(RW) ALONG EXPOSURE 01, 02, OF SUBJECT ADDRESS 2821 VALENTINE AVENUE, BRONX NY. THE (RW) WAS OBSERVED TO BE A #35726721K | Apr 17, 2026 DEFAULT | $6,250 |
| Feb 25, 2025 | Construction CLASS - 2 1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103-09(E)(2) AND (5). TO DATE, THE DEPARTMENT HAS NOT RECEIVED A RETAINING WALL CONDITION ASSESS #37033673X | May 29, 2026 DEFAULT | $6,250 |
| Issued | Violation | Status |
|---|---|---|
| Dec 15, 2022 | RETAINING WALL FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 #00201 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Apr 23, 2025 | Retaining Walls | Active |
| Dec 15, 2022 | Retaining Walls FTF-RW-INITL | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 29, 2024 | B | Apt 3RDFLO · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQUARE FEET AT CEILING IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST ORIGINAL VIOLATION 17069893 ISSUED 25-JUN-24 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE COD | Dec 3, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE FOYER LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
| Jul 1, 2024 | A | Apt 3RDFLO · § 27-2010, 2011, 2012 ADMIN CODE: CLEANSE TO THE SATISFACTION OF THIS DEPARTMENT THE CERAMIC WALL TILES AT SOUTH, WEST AND NORTH WALLS AT BATHTUB AREA IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2024 |
| Jul 1, 2024 | A | Apt 3RDFLO · § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Oct 4, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2073 ADM CODE - PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
| Jul 1, 2024 | B | § 27-2005 ADMIN. CODE: FIRE ESCAPE DEFECTIVE. ADJUST THE DROPLADDER SO THAT IT WILL SLIDE EASILY IN THE GUIDE RODS DROP LADDER FULLY EXTENDED AT REAR OF BUILDING AT FIRE ESCAPE | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING, WEST, EAST, NORTH AND SOUTH WALLS IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
| Jul 1, 2024 | B | Apt 3RDFLO · § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING, NORTH AND WEST WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 3RDFLO, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Aug 5, 2024 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 13, 2026, 6:01 PM ET. BBL 2033040140.