| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 68 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 68 days | Keep the report on file (not filed with DOB) |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 312 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Mar 31, 2025 | Unknown CLASS - 1 AT TIME OF INSPECTION OBSERVED ERECTION OF PIPE SCAFFOLD ON TOP OF SIDEWALK SHED AT EXPOSURE #1. UPON REQUEST FOR SUPERVISOR 32HR SCAFFOLD TRAINING AND 16HR ERECTOR SCAFFOLD TRAINING NONE WERE PROVIDED. CREATIN #39538560X | Apr 27, 2026 IN VIOLATION | $1,250 |
| Mar 27, 2025 | Construction CLASS - 1 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. ACTIVE SITE OBSERVED PUMP JACK SCAFFOLD INSTALLED ON TOP OF SIDEWALK SHED AT EXP #1 APPROVED DRAWING SHOWN FOR SUPPORTED SCAF #39538461K | Jan 15, 2027 | $6,250 |
| Mar 27, 2025 | Construction CLASS - 2 ACTIVE SITE OBSERVED PUMP JACK SCAFFOLD INSTALLED ON TOP OF SIDEWALK SHED AT EXP# 1. NO MANUFACTURED SPECIFICATION, NO DAILY LOGBOOK, NO INSTALLATION INSPECTION REPORT AND NO DRAWINGS ON SITE FOR PUMP JACK. #39538471Y | Dec 3, 2026 | $1,280 |
| Mar 27, 2025 | Unknown CLASS - 2 ACTIVE SITE OBSERVED PUMP JACK SCAFFOLD INSTALLED ON TOP OF SIDEWALK SHED AT EXP# 1 OVER 40FT. REVIEW IN DOB NOW AND BIS REVEALS THERE'S NO PERMIT FOR PUMP JACK SCAFFOLD. STOP ALL FACADE WORK EXP# 1 AND USED OF #39538472X | Dec 3, 2026 | $1,280 |
| Mar 27, 2025 | Construction CLASS - 1 ACTIVE SITE OBSERVED STAIRWELL AT 1ST FLOOR TO SECOND FLOOR WITH NO TEMPORARY HANDRAIL INSTALLED. STOP ALL USE OF STAIRWELL PROVIDE HANDRAIL. #39538460Z | Dec 3, 2026 | $2,530 |
None open.