14 floors · 465 apartments · 439,700 sq ft · built 1950 · class D3 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 62 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual boiler inspection (10 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-31 (Incomplete Submission). Agency page | Dec 31, 2026 in 62 days | 10 of 10 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 439,700 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Energy audit and retro-commissioning (2035) Likely applies Local Law 87 · Calendar year 2035 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3265). Agency page | Dec 31, 2035 in 3349 days | Next due 2035 |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | On file | Cycle 10 filing on record: UNSAFE (2025-11-17) |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 18, 2026 | Unknown CLASS - 1 FAILED TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN AN INJURY AT TIME OF INSPECTION. UPON REVIEW OF DEPT RECORDS, THERE WERE NO ELECTRONICALLY FILLING OF AN INCIDENT WITHIN 3 BUSINESS DAYS AFTER INCIDENT #39558073R | Oct 30, 2026 | $10,000 |
| Jul 29, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION, OBSERVED 14-STORY FACADE REPAIR SITE. ATOP THE SIDEWALK SHED, THE AREA USED FOR SUSPENDED SCAFFOLD CADDY ACCESS WAS NOT PROPERLY MAINTAINED. WET SURFACES FROM RAIN, INADEQUATE HOUSEKEEPIN #39557214R | Mar 19, 2027 | $5,000 |
| Jul 29, 2026 | Unknown CLASS - 1 AT TIME OF INSPECTION, OBSERVED 14-STORY FACADE REPAIR SITE WHERE A WORKER INJURY WAS REPORTED. THE LADDER REPORTEDLY INVOLVED IN THE INCIDENT WAS NOT PRESENT AT THE INCIDENT LOCATION DURING DOB INSPECTION AND #39557215Z | Mar 19, 2027 | $5,000 |
| Apr 17, 2026 | Construction CLASS - 2 AT TIME OF INSPECTION OF A 14-STORY BUILDING, I OBSERVED SIDEWALK SHED ERECTED ALL AROUND THE BUILDING NOT MAINTAIN AS PER CODE MISSING DEBRIS NETTING TO PROTECT FALLING DEBRIS FROM ABOVE, SIDEWALK SHED DECK DE #39553130L | Jul 17, 2026 DEFAULT | $10,000 |
| Issued | Violation | Status |
|---|---|---|
| Oct 21, 2025 | CONSTRUCTION STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED AT EXP#1 SWS AT 2 LOCATIONS 3 UPRIGHT COLUMNS SHIFTED, JUNIOR BEAMS SHIFTED AND HANGING,CROSS BRACES BENT DUE TO CAR STRIKE SWS #25-02371 | DOB VIOLATION - ACTIVE |
| May 21, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED AT PARAPET LEVEL THROUGHOUT EXPOSURES 1,2, 3 & 4 DETERIORATED MORTAR JOINTS, SPALLING & BULGING BRICKS. REMEDY: REPAIR AND/OR REPLACE #SR20801MA | DOB VIOLATION - ACTIVE |
| May 21, 2025 | CONSTRUCTION FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION IT WAS OBSERVED AT PARAPET LEVEL THROUGHOUT EXPOSURES 1,2, 3 & 4 SPALLING, DETERIORATED MORTAR JOINTS, DAMAGED LINTELS & CRACKS REMEDY: REPAIR AND/OR REPLACE #SR20802MA | DOB VIOLATION - ACTIVE |
| Nov 28, 2022 | HAZARDOUS CONDITION (FACADE) NYCHA CYCLE 9A UNSAFE REPORT FILED #910580 | DOB VIOLATION - ACTIVE |
| Nov 28, 2022 | FAILURE TO CORRECT SWARMP CONDITIONS (FACADE) NYCHA CYCLE 9A FAILURE TO CORRECT SWARMP CONDITIONS #00606 | DOB VIOLATION - ACTIVE |
| Nov 28, 2022 | HAZARDOUS CONDITION (FACADE) NYCHA CYCLE 9A UNSAFE REPORT FILED #910579 | DOB VIOLATION - ACTIVE |
| Jan 28, 2022 | HAZARDOUS CONDITION (FACADE) NYCHA CYCLE 9A UNSAFE REPORT FILED #910578 | DOB VIOLATION - ACTIVE |
| Aug 8, 2018 | FACADE SAFETY PROGRAM #HAZ87589 | DOB VIOLATION - ACTIVE |
| Jul 10, 2018 | FACADE SAFETY PROGRAM #HAZ87530 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 28, 2022 | Facades FISPHAZ NYCHA CYCLE 9A UNSAFE REPORT FILED | Active |
| Nov 28, 2022 | Facades FISPHAZ NYCHA CYCLE 9A UNSAFE REPORT FILED | Active |
| Aug 8, 2018 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Jul 10, 2018 | Facades FISP CYCLE 8A UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jun 1, 2021 | A | Apt 4K · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE BATHROOM , THE KITCHEN , THE FOYER , THE 1st ROOM FROM NORTH AT EAST, THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 4K, 4th STORY, 2nd APARTMENT FROM WEST AT NORTH | Sep 4, 2021 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 29, 2026 | DOB Safety | Elevators: Violation Issued-Failure To File 2025 Cat1 Test Affirmation of Correction | Closed |
| Aug 18, 2026 | ECB | Unknown: FAILED TO NOTIFY THE DEPT OF AN INCIDENT THAT RESULTED IN AN INJURY AT TIME OF INSPECTION. UPON REVIEW OF DEPT RECORDS, THERE WERE NO ELECTRONICALLY FILLING OF AN INCIDENT WITHIN 3 BUSINESS DAYS AFTER INCIDENT | Closed |
| Jul 29, 2026 | ECB | Construction: AT TIME OF INSPECTION, OBSERVED 14-STORY FACADE REPAIR SITE. ATOP THE SIDEWALK SHED, THE AREA USED FOR SUSPENDED SCAFFOLD CADDY ACCESS WAS NOT PROPERLY MAINTAINED. WET SURFACES FROM RAIN, INADEQUATE HOUSEKEEPIN | Closed |
| Jul 29, 2026 | ECB | Unknown: AT TIME OF INSPECTION, OBSERVED 14-STORY FACADE REPAIR SITE WHERE A WORKER INJURY WAS REPORTED. THE LADDER REPORTEDLY INVOLVED IN THE INCIDENT WAS NOT PRESENT AT THE INCIDENT LOCATION DURING DOB INSPECTION AND | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)