Staten Island · Block 770 · Lot 9 · 10314

281 Bradley Avenue

2 floors · 47,368 sq ft · built 1961 · class W2 · owner of record: Church Of St Rita

41open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
167dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 46 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 47,368 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 167 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 167 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1142 days
Next cycle year 2029
Annual boiler inspection (2 boilers) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-06 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Mar 19, 2026Construction CLASS - 2
REISSUE#35092206N FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT EXIT 6,THE EMERGENCY EXIT DOORS THAT LEAD OUT TO BRADLEY AVE,DO NOT OPERATE CORRECTLY.SOME VERY DIFFICULT TO OPEN AND GET STUCK.R
#35727153X
Jun 4, 2026
POP/IN-VIO
$0
Mar 5, 2025Construction CLASS - 2
REISSUE#35679097R FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER.NOTED:AT T.O.I.,OBSERVED AT EXIT#6 NEAR GYM,THE EMERGENCY EXIT DOORSLEADING OUT TO BRADLEY AVE ARE NOT OPERATING CORRECTLY.VERY HARD TO OP
#35692206N
Jul 16, 2025
POP/IN-VIO
$0
Sep 19, 2024Construction CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED: AT EXIT #6 NEAR GYM, THE EMERGENCY EXIT DOORS LEADING OUT TO BRADLEY AVE. ARE NOT OPERATING CORRECTLY. DIFFICULT TO OPEN AND DO NOT SWING OUT. REMED
#35679097R
Oct 23, 2024
POP/IN-VIO
$0
DOB (17)
IssuedViolationStatus
Nov 14, 2025LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
#19965
DOB VIOLATION - ACTIVE
Sep 23, 2024LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
#18527
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
#32481
DOB VIOLATION - ACTIVE
Jun 30, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
#12095
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#11334
DOB VIOLATION - ACTIVE
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
#32909
DOB VIOLATION - ACTIVE
Apr 25, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
#25348
DOB VIOLATION - ACTIVE
Nov 8, 2019LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
#16142
DOB VIOLATION - ACTIVE
Apr 6, 2018LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
#19360
DOB VIOLATION - ACTIVE
Feb 24, 2017LOW PRESSURE BOILER
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
#16482
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#30479
DOB VIOLATION - ACTIVE
Mar 19, 2003LOCAL LAW 62/91 - BOILERS

#30478
DOB VIOLATION - ACTIVE
Mar 26, 2002LOCAL LAW 62/91 - BOILERS

#32198
DOB VIOLATION - ACTIVE
Feb 27, 2001LOCAL LAW 62/91 - BOILERS

#31110
DOB VIOLATION - ACTIVE
Feb 7, 2000LOCAL LAW 62/91 - BOILERS

#31396
DOB VIOLATION - ACTIVE
Mar 16, 1999LOCAL LAW 62/91 - BOILERS

#31323
DOB VIOLATION - ACTIVE
Sep 16, 1997LOCAL LAW 62/91 - BOILERS

#275593
DOB VIOLATION - ACTIVE
DOB NOW Safety (21)
IssuedViolationStatus
Nov 14, 2025Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Sep 18, 2025Gas Piping - LL152 FTF-PL-PER
Cycle 1, Sub-cycle B (premises is in Community District 2)
Active
Sep 23, 2024Boiler LBLVIO
Violation Issued-Failure To File 2023 External Low Pressure Inspection Report
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 30, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Active
Apr 25, 2023Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2022 INSPECTION REPORT
Active
Nov 8, 2019Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Active
Apr 6, 2018Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Active
Feb 24, 2017Boiler LBLVIO
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Active
Mar 19, 2003Boiler LL6291
Active
Mar 19, 2003Boiler LL6291
Active
Mar 26, 2002Boiler LL6291
Active
Feb 27, 2001Boiler LL6291
Active
Feb 7, 2000Boiler LL6291
Active
Mar 16, 1999Boiler LL6291
Active
Sep 16, 1997Boiler LL6291
Active
HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 15, 2026, 8:01 AM ET. BBL 5007700009.

Look up another building