3 floors · 3 apartments · 4,185 sq ft · built 2000 · class C0 · owner of record: Perez Karen
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 800 days | Next cycle year 2028 |
None open.
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| May 7, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 10, 2026 |
| Nov 20, 2020 | C | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE DOORKNOB AND LATCH ASSEMBLY AT ENTRANCE DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''284'' | Nov 26, 2020 |
| Nov 20, 2020 | B | Apt 2 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FRAME AT ENTRANCE DOOR IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''284'' | Dec 25, 2020 |
| Nov 20, 2020 | C | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT BUILDING ENTRANCE , 1st STORY, SECTION ''284'' | Dec 16, 2020 |
| Nov 20, 2020 | B | Apt 2 · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN WASH BASIN WASTE PIPE IN THE BATHROOM LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''284'' | Dec 25, 2020 |
| Nov 19, 2020 | C | Apt 2 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2 | Nov 19, 2020 |
| Nov 19, 2020 | C | Apt 2 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2 | Nov 19, 2020 |
| Nov 19, 2020 | C | Apt 2 · § 27-2070 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF GAS TO THE FIXTURES AT GAS RANGE IN THE KITCHEN LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''284'' | Nov 25, 2020 |
| Nov 19, 2020 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR | Nov 25, 2020 |
| Sep 21, 2020 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Sep 27, 2020 |
| Sep 21, 2020 | C | Apt 2NDFLO · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2NDFLO, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | Sep 18, 2020 |
| Sep 21, 2020 | B | Apt 2NDFLO · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD DOOR FRAME IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2NDFLO, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 26, 2020 |
| Aug 27, 2020 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM . DOOR LOCKED AT CELLAR | Sep 2, 2020 |
| Aug 27, 2020 | C | Apt 2 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''BLDG 284'' | Aug 26, 2020 |
| Aug 27, 2020 | A | Apt 2 · § 27-2005 ADM CODE REFIT THE CLOSET DOOR IN THE 3rd ROOM FROM NORTH LOCATED AT APT 2, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''BLDG 284'' | Nov 30, 2020 |
| Aug 27, 2020 | C | § 27-2033 ADM CODE POST NOTICE, IN FORM APPROVED BY THE DEPARTMENT, STATING THE NAME AND LOCATION OF THE PERSON DESIGNATED BY THE OWNER TO HAVE KEY TO BUILDINGS HEATING SYSTEM AT WALL AT PUBLIC HALL, 1st STORY | Sep 2, 2020 |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 4:51 PM ET. BBL 2055980038.