6 floors · 10 apartments · 10,183 sq ft · built 2025 · class D3 · owner of record: 28 Putnam Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 66 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 66 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 82 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1162 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 20, 2026 | Unknown CLASS - 2 OBSERVED SUPPORTED SCAFFOLD (70FT) WITH FIBER INSULATION, BUCKETS AND CONSTRUCTION DEBRIS SCATTER ACROSS THE SCAFFOLD CONTRARY TO CODE 3314.1. CREATING SLIP AND TRIP HAZARDS, OBSTRUCTING THE EGRESS IN CASE OF A #39554439Y | Mar 8, 2027 | $2,500 |
| May 20, 2026 | Unknown CLASS - 2 OBSERVED SUPPORTED SCAFFOLD (70FT) ERECTED ON TOP OF THE SIDEWALK SHED, WHEN REQUESTED FOR A LOAD-IMPOSED LETTER, NONE WAS PROVIDED CONTRARY TO CODE 3314.3.4. LOADS IMPOSED LETTER IS NEEDED TO VERIFY THAT THE S #39554440L | Mar 8, 2027 | $2,500 |
| May 20, 2026 | Construction CLASS - 1 OBSERVED ACTIVE CONSTRUCTION SITE WITH WORKERS FROM MULTIPLE TRADES WORKING ON SEVERAL FLOORS AND UPON REVIEWING CS LOG WORK HAS BEEN GOING FOR SEVERAL DAYS. WHEN REQUESTED FOR THE NEW BUILDING PERMIT (B0094680 #39554384X | Mar 8, 2027 | $2,500 |
| Mar 12, 2026 | Construction CLASS - 1 BC 3301.2. FAILURE TO MAINTAIN SAFETY STRAP INSPECTION LOG. AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 6 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL. OBSERVED FROM THE BULKHEAD TO THE 2 #35726570M | May 20, 2026 DEFAULT | $12,500 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 26, 2026, 7:24 PM ET. BBL 3019910019.