3 floors · 4 apartments · 4,310 sq ft · built 1920 · class C3 · owner of record: Ljesnjanin, Kupo
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 63 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 63 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 79 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 794 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Feb 26, 2025 | Construction CLASS - 2 WORK DOES NOT CONFROM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AT THE TIME OF MY INSPECTION OBSERVED CONSTRUCTION FENCE ERECTED, UPON REVIEW ON CRM OBSERVED FENCE EXCEEDING HEIGHT ON EXP # #39537332J | Oct 6, 2026 IN VIOLATION | $1,250 |
| Feb 14, 2023 | Construction CLASS - 2 AT TIME OF INSPECTION ON AN ACTIVE 3 STORY ALT JOBSITE I OBSERVED SWS PARAPET PANEL POSTED IS NOT OF THE CORRECT G.C. - PARAPET PANEL SAYS HAWK CONTRACTING - THE GC RESPONSIBLE FOR WORK ON SITE WITH AN ACTIVE P #39513124Z | Sep 19, 2023 IN VIOLATION | $625 |
| Feb 14, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION ON AN ACTIVE TOPPED OFF 3 STORY ALT JOBSITE I OBSERVED NO ROOF PROTECTION INSTALLED ON ADJOINING PROPERTY. THIS ROOF PROTECTION MUST BE PROVIDED BEFORE BEGINNING WORK ABOVE THE LEVEL OF TH #39513117K | Sep 19, 2023 IN VIOLATION | $5,000 |
| Feb 14, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION ON AN ACTIVE 3 STORY ALT JOBSITE WHEN ASKING THE COMPETENT PERSON ON SITE FOR THE FOLLOWING DOCUMENTS NONE COULD BE PROVIDED OR NOT MAINTAINED: 1.)SITE SAFETY PLAN, 2.)STRUCTURAL DRAWINGS #39513115R | Sep 19, 2023 IN VIOLATION | $625 |
| Feb 14, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION ON AN ACTIVE 3 STORY ALT JOBSITE I OBSERVED FIRE EXTINGUISHERS ON SITE NOT MAINTAINED - MISSING TAGS AND NOT INSPECTED SINCE 11.12.22. OBSERVED NO FLOOR SIGNS INSTALLED ON ANY LEVEL. NO WO #39513119Y | Sep 19, 2023 IN VIOLATION | $625 |
| Feb 14, 2023 | Construction CLASS - 1 AT TIME OF INSPECTION ON AN ACTIVE 3 STORY ALT JOBSITE I OBSERVED NO GUARDRAILS INSTALLED ON ROOF LEVEL WITH WORKER PERFORMING WORK AND NO INTENT OF INSTALLING GUARDRAILS, OBSERVED AT EXP.3 MISSING GUARDRAIL FO #39513116Z | Sep 19, 2023 IN VIOLATION | $2,500 |
| Nov 1, 2022 | Construction CLASS - 1 SUPPORTED SCAFFOLD BC3314.1@3 STORY ALT1 SITE IN 2ND FL STRUCTURE PHASE I OBSERVE 6 FRAME HIGH SUPPORTED SCAFFOLD ON SITES DRIVEWAY TOWERING OVER EXPOSURE#2 ADJACENT PROPERTIES NOT TO CODES CREATING HAZARDOUS C #39508544Z | Dec 20, 2022 IN VIOLATION | $2,500 |
| Mar 18, 2022 | Construction CLASS - 2 JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED CONSTRUCTION FENCE ERECTED AT EXP#1,2 &4.FENCE IS MISSING VIEWING PANELS,PROJECT INFORMATIO #35647806Y | Jul 12, 2022 IN VIOLATION | $1,000 |
| Mar 18, 2022 | Unknown CLASS - 1 PERMIT HOLDER FAILED TO ENSURE EACH CONSTRUCTION OR DEMOLITION WORKER ENLARGED AT THE SITE SUCCESSFULLY COMPLETED THE REQUIRED TRAINING UNDER BC 3321.1 AND HAS AN SST CARD.OBSERVED FUMAR MELGAR ON 03/18/2022 AT #35647808H | Jul 12, 2022 IN VIOLATION | $2,500 |
| Mar 18, 2022 | Construction CLASS - 2 BC 3314.4.8 FAILURE TO MAINTAIN SCAFFOLD AS PER CODE SUBSECTION AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED PIPE SCAFFOLD ERECTED APPROX.13 FEET IN HEIGHT AT REAR AND APPROX.20 FEET IN HEIGHT AT FRONT B #35647804K | Jun 14, 2022 DEFAULT | $3,125 |
| Mar 18, 2022 | Construction CLASS - 2 BC 3303.7.2 FAILURE TO COMPLY WITH NYC FIRE CODE AT TIME OF INSPECTIONON AN ACTIVE JOBSITE OBSERVED THAT FIRE EXINGUISHERS WHERE MISSING INSPECTION 7 AWS AND ONE WAS IMPROPERLY PLACED ON THE FLOOR CONTRARY TO F #35647810R | Jul 12, 2022 IN VIOLATION | $1,250 |
| Mar 18, 2022 | Construction CLASS - 2 DOCUMENTS TO BE KEPT AT SITE.AT TIME OF INSPECTION ON AN ACTIVE JOBSITE,OBSERVED 2"X4" NUMBER DIAGONAL BRACES SUPPORTING THE APPROX.50 FEET X 10 FEET IN HEIGHT FREE STANDING BRICK WALL AT 2ND FLOOR EXP#4 ADJACE #35647805M | Jun 14, 2022 DEFAULT | $3,125 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 29, 2026, 10:22 AM ET. BBL 4007200045.