6 floors · 60 apartments · 55,000 sq ft · built 1939 · class D1 · owner of record: Ajm Realty
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 62 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 62 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 78 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 55,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 183 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 183 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 306 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2027) Likely applies Local Law 87 · Calendar year 2027 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 627). Agency page | Dec 31, 2027 in 427 days | Next due 2027 |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 793 days | Next cycle year 2028 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-09 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 5, 2026 | Construction CLASS - 1 RETAINING WALL CONSTRUCTION AT EXPOSURE #3 COURTYARD PERFORMED WITHOUT REQUIRED PERMITS OR APPROVED MEANS AND METHODS.CONCRETE WALL APPROX.10 FT HIGH AND 75% COMPLETE.OBTAIN PERMITS AND APPROVALS BEFORE PROCEED #39191537H | Mar 16, 2027 PENDING | $0 |
| Aug 31, 2015 | Boilers CLASS - 2 B254,16,32A,50A,50B,50C,50D,50E,50F. 50A-SUPPLY PUMP MUST BE INTERLOCKED WITH BURNER; 50B-CANNOT HAVE 2 OR MORE CONTROLS ON 1/4"PIPING; 50C-EXPOSED WIRES AT BURNER AND PUMP; 50D-FLUE COVERED IN INSULATION CANNO #32075534J | Oct 20, 2015 STIPULATION/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 5, 2026 | CONSTRUCTION STRUCTURE RENDERED NON-COMPLIANT.RETAINING WALL CONSTRUCTION AT EXPOSURE #3 COURTYARD PERFORMED WITHOUT REQUIRED PERMITS OR APPROVED MEANS AND METHODS.CONCRETE WALL APPROX.10 FT HIGH AND 75% COMPLETE.OBTAIN PERMITS AND APPROVALS BEFORE PROCEEDING. #26-01482 | DOB VIOLATION - ACTIVE |
| Nov 18, 2025 | CONSTRUCTION BORO COMMISSIONER HAS ORDERED WORK STOPPED FOR # Q00787603-I 1 DUE TO INTENT TO REVOKE APPROVAL AND PERMIT AT EXTERIOR FACADE OF ENTIRE PREMISES. #25-02723 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION #05984 | DOB VIOLATION - ACTIVE |
| Apr 22, 2023 | FAILURE TO SUBMIT EER FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) #00431 | DOB VIOLATION - ACTIVE |
| Feb 7, 2000 | LOCAL LAW 62/91 - BOILERS #25856 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 9, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Apr 22, 2023 | Retro-Commissioning - LL87 FTF-EN-EARCX | Active |
| Feb 7, 2000 | Boiler LL6291 | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 9, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 30, 2026, 3:52 AM ET. BBL 4006270025.