4 floors · 8 apartments · 6,905 sq ft · built 2024 · class D3 · owner of record: 2810 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Oct 2, 2026 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURES/TEMPORARY CONSTRUCTION "NO HANDRAILS". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 4 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL OBSER #35730820H | Dec 8, 2026 PENDING | $2,500 |
| Nov 5, 2025 | Construction CLASS - 2 WHILE INSPECTING DOCUMENTS I OBSERVED THAT SSP DID NOT REFLECT CURRENTSCOPE OF TO INCLUDE SUSPENDED SCAFFOLD AT EXP#4AMMEND DRAWINGS TO REFLECT CURRENT CONDITIONS #39546704X | Jan 13, 2026 ADMIT/IN-VIO | $0 |
| Aug 18, 2025 | Construction CLASS - 2 PERFORMED SAFETY INSPECTION WITH DESIGNATED COMPETENT PERSON PRESENT ON BEHALF OF CONSTRUCTION SUPERINTENDENT. OBSERVED WORKERS PERFORMING HOUSEKEEPING, PLACING SIGNAGE, AND INSTALLING CMU BLOCKS ON THE ROOF. U #39543808R | Oct 8, 2026 IN VIOLATION | $1,250 |
| May 21, 2025 | Construction CLASS - 1 OBSERVED JOBSITE W/ MAKESHIFT REBAR GUARDRAILS 3RD FL DECK, ZERO CABLE SYSTEM W/ OUT TENSION AND BOTTOM CABLE ON 2ND & 3RD FL. MASONRY WORKS WORKING ALONG LEADING EDGE OF 1ST FL WOODEN GUARDRAIL MISSING TOP RAI #39540484X | Apr 2, 2027 | $5,000 |
| May 21, 2025 | Unknown CLASS - 1 OBSERVED JOBSITE W/ HEAVY STEEL BEAM STORED ON ADJ. PROPERTY ROOF PARAPET EXPO #2 NOT ON-SITE SAFETY PLAN OR PE REPORT AS AN ALLOWABLE STORAGE AREA, CREATING UNSAFE CONDITION. STOP ALL STORAGE OF MATERIAL ON AD #39540485H | Apr 2, 2027 | $5,000 |
| May 21, 2025 | Unknown CLASS - 2 AT TIME OF INSPECTION, OBSERVED MULTIPLE UNSAFE CONDITIONS ON ACTIVE JOBSITE NOT NOTED IN SUPERS LOGBOOK. CONSTRUCTION SUPERINTENDENT TO PROVIDE ADEQUATE LOGS AND CORRECTION OF UNSAFE CONDITIONS. #39540494J | Jan 22, 2027 PENDING | $5,000 |
| Mar 3, 2025 | Construction CLASS - 2 @ THE TIME OF INSPECTION PARTIAL EXTERIOR OUTBOARD INSULATION EXP#4,3 1ST FL LEVEL REQUESTED EN APPROVED PLANS NOT PROVIDED, MAINTAIN/DISPLAY REQUIRED DOCUMENTS; MAINT EN APPROVED PLANS ON SITE.HTTPS://WWW1.NYC #39140128R | Aug 5, 2025 IN VIOLATION | $1,250 |
| Feb 3, 2025 | Unknown CLASS - 1 ACTIVE JOBSITE W/ ACTIVE MULTIPLE TRADES NO CONSTRUCTION SUPERINTENDENT, DESIGNATED COMPETENT PERSON, UPON REQUEST FOR THE APPROVED PLANS & RELATED DOCUMENTS WORKER DENIS ALEXANDER LANZA BROUGHT A GARBAGE BAG F #39536593N | Dec 17, 2026 | $5,000 |
| Feb 3, 2025 | Unknown CLASS - 1 ACTIVE JOBSITE W/ MULTIPLE TRADES WORKING W/OUT PPE OR SAFETY PROTOCOLS FOR FALL PROTECTION AND HAZARDOUS CONDITIONS AS REQUIRED PER OSHA 1910.132 AND( BC 3321.1) REQUIREMENTS OF THE SST TRAINING. STOP ALL WORK #39536590H | Aug 20, 2026 IN VIOLATION | $2,500 |
| Feb 3, 2025 | Construction CLASS - 2 ACTIVE JOBSITE W/ MULTIPLE TRADES OBSERVED STORAGE OF LPG TANK W/ CONNECTOR STORED NEXT TO COMBUSTIBLE MATERIALS, NO FDNY PERMIT FOR STORAGE NOR CERTIFICATE OF FITNESS TO SUPERVISE THE COMBUSTIBLE MATERIAL. AS #39536591J | Aug 20, 2026 IN VIOLATION | $1,250 |
| Feb 3, 2025 | Site Safety CLASS - 1 ACTIVE JOBSITE W/ MULTIPLE TRADES, OPERATIONS ON SCAFFOLDS, STORAGE OF CMU BLOCKS & DEBRIS, EQUIPMENT & MATERIALS ON UNPOURED QDECK. NO PLANS TO VERIFY LOADS ON UNPOURED QDECK AS PER SECTION (3305.8.6.1) STOP A #39536592L | Aug 20, 2026 IN VIOLATION | $2,500 |
| Feb 3, 2025 | Unknown CLASS - 1 (3301.13.7-13.13)ACTIVE JOBSITE W/ MULTIPLE TRADES W/OUT PPE NO CONSTRUCTION SUPERINTENDENT, DESIGNATED COMPETENT PERSON NOR ALTERNATE CONSTRUCTION SUPERINTENDENT TO SUPERVISE DAILY OPERATIONS, NO DAILY LOG BOO #39536582H | Aug 20, 2026 IN VIOLATION | $5,000 |
| Jan 23, 2025 | Construction CLASS - 2 OBSERVED CONSTRUCTION FENCE AT EXP.#1 OUT OF PLUMB/ PARTIAL DISLODGED CREATING POSSIBLE HAZARD CONDITION FOR PEDESTRIAN PASSING BY.MAINTAIN CONSTRUCTION FENCE PLUMB AND SECURE. #39536213M | Mar 12, 2026 IN VIOLATION | $1,000 |
None open.
None open.
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | ECB | Construction: FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIP MEASURES/TEMPORARY CONSTRUCTION "NO HANDRAILS". AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A PROPOSED 4 STORY BUILDING ALREADY AT THE BULKHEAD LEVEL OBSER | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 3:21 AM ET. BBL 4003980024.