2 floors · 4 apartments · 3,800 sq ft · built 1910 · class S4 · owner of record: Istrian Realty Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 50 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 66 days | Annual |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 781 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-01-23 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 19, 2025 | Construction CLASS - 1 FAILURE TO COMPLY AND CERTIFY CORRECTIONS FOR VIOLATION # 35666282X, COMPLY WITH COMMISSIONER'S ORDER #39157673N | Jun 16, 2026 DEFAULT | $12,500 |
| Aug 19, 2025 | Construction CLASS - 2 FAILURE TO CERTIFY CORRECTIONS FOR VIOLATION 35666280M, FILE A CERTIFICATE OF CORRECTION #39157672L | Jun 16, 2026 DEFAULT | $6,250 |
| Mar 31, 2023 | Zoning CLASS - 2 ILLEGAL USE IN A COMMERCIAL DISTRICT.NOTED UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT,A PROHIBITED USE PER ZR12-10 OPERATING IN A C1-3 ZONING DISTRICT DOING BUSINESS AS"RAIN SPA"AT THE GROUND LEVEL WITH 3 MASS #35668953R | Jun 6, 2023 IN VIOLATION | $0 |
| Mar 31, 2023 | Construction CLASS - 2 OCCUPANCY CONTRARY TO THAT ALLOWED BY DOB RECORDS.ILLEGAL OCCUPANCY NOTED AT GROUND LEVEL ILLEGALLY OCCUPIED UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT"RAIN SPA"PREVIOUS NOV#35666280M.REMEDY:DISCONTINUE ILLEGA #35668954Z | Jun 6, 2023 IN VIOLATION | $0 |
| Jan 12, 2023 | Construction CLASS - 1 WORK W/O PERMIT.WORK NOTED:AT 1ST FL LEVEL ERECTED PARTITIONS WALL CREATING 5 ROOMS.INSTALLED WATER & WASTE PLUMBING CREATING SHOWER ROOM.REMEDY:OBTAIN PERMIT #35666282X | Mar 21, 2023 IN VIOLATION | $0 |
| Jan 12, 2023 | Construction CLASS - 1 OCCUPANCY CONTRARY TO THAT ALLOWED BY CERTIFICATE OF OCCUPANCY #4P0010652 ILLEGAL OCCUPANCY NOTED AT 1ST FL CONVERTED/OCCUPIED AS "RAIN SPA" WITH UNLICENSED MASSAGE PHYSICAL TREATMENT MASSEUSE WITH 3 MASSAGE RM #35666280M | Mar 21, 2023 IN VIOLATION | $0 |
| Jan 12, 2023 | Zoning CLASS - 2 ILLEGAL USE IN COMMERCIAL DISTRICT UNLICENSED PHYSICAL TREATMENT ESTABLISHMENT PROHIBITED USE PER ZR12-10 OPERATING IN C1-3 DISTRICT ON GROUND FLOOR NOTED MASSEUSE OFFERED TO PERFORM BODY MASSAGE AT RATE #60/HR #35666281Y | Mar 21, 2023 IN VIOLATION | $0 |
| Issued | Violation | Status |
|---|---|---|
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #21422 | DOB VIOLATION - ACTIVE |
| Jun 30, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION #20934 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #42273 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #42607 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #13901 | DOB VIOLATION - ACTIVE |
| Nov 8, 2019 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT #13902 | DOB VIOLATION - ACTIVE |
| Feb 24, 2017 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT #14133 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #23174 | DOB VIOLATION - ACTIVE |
| Jan 1, 2009 | LOCAL LAW 62/91 - BOILERS #23173 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #23234 | DOB VIOLATION - ACTIVE |
| Jan 19, 2007 | LOCAL LAW 62/91 - BOILERS #23233 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jan 8, 2026 | Gas Piping - LL152 FTF-PL-PER Cycle 2, Sub-cycle A (premises is in Community District 1) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 30, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Nov 8, 2019 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Feb 24, 2017 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 1, 2009 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
| Jan 19, 2007 | Boiler LL6291 | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 4:11 PM ET. BBL 4008390012.