6 floors · 5 apartments · 6,482 sq ft · built 2020 · class D1 · owner of record: Table Of 9 Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 6 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 65 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 65 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 65 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 81 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 31, 2018 | Site Safety CLASS - 1 INADEQUATE LOG BOOK. AT TIME OF MY INSPECTION OF THE 6 STY BLDG AT 4TH FL,I OBSERVED THE LOG BOOK WAS MISSING SEVERAL DAYS OF LOG ENTRIES & ON 7/31 THE LATEST ENTRY WAS FROM 7/24. THE LOG ENTRIES WERE ALSO MISS #35345423N | Dec 3, 2018 IN VIOLATION | $495 |
| Jul 31, 2018 | Site Safety CLASS - 1 NO SUPER OR COMPETENT PERSON ON SITE AT TIME OF MY INSPECTION OF THE 6STY BLDG AT 4TH FL,I OBSERVED THERE WAS NO SUPER OR COMPETENT PERSON ON SITE. AFTER ABOUT 35(MINS)2 COMPETENT PERSON ARRIVED ON SITE & ONE #35345422L | Dec 6, 2018 IN VIOLATION | $123 |
| Jul 31, 2018 | Construction CLASS - 1 FAILURE TO SAFEGUARD WORKER ON PIPE SCAFFOLD W/O PPE. AT TIME OF MY INSPECTION OF THE 6 STY BLDG AT 4TH FL,I SAW A WORKER ON A PIPE SCAFFOLDAPPROX 24 FEET ABOVE GRADE W/O PPE/FALL PROTECTION APPARATUS-USE PIPE #35345421J | Dec 5, 2018 IN VIOLATION | $495 |
| Jul 31, 2018 | Site Safety CLASS - 1 NO DESIGN DRAWING FOR PLATFORM AT TIME OF MY INSPECTION OF THE 6 STY BLDG AT 4 FL,I OBSERVED 2(PLATFORMS)ON THE 2ND FL & 3RD FL & ASKED FOR DESIGN DRAWING. NO DRAWING WAS PROVIDED. THE PLATFORM ON THE 3RD FL IS #35345420H | Dec 6, 2018 IN VIOLATION | $123 |
| Jun 13, 2018 | Construction CLASS - 1 SEC: BC 3303.11. FAILURE TO PROVIDE AT LEAST (1)SAFE MEANS OF EGRESS @ CONSTRUCTION SITE. @ TIME OF INSP OF A NEW BLDG UNDER CONSTRUCTION @ 2ND FLR LEVEL, ACTIVE JOB SITE, OBSERVED THAT THE MEANS OF EGRESS PROV #35336043R | Aug 15, 2018 IN VIOLATION | $49 |
| Jun 13, 2018 | Construction CLASS - 1 FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS: NO OVERHEAD PROTECTION. @ TIME OF INSP OF A NEW 6 STORY BLDG UNDER CONSTRUCTION @ 2ND FLR LEVEL, ACTIVE JOB SITE, OBSERVED THAT T #35336042P | Aug 15, 2018 IN VIOLATION | $793 |
| Jun 13, 2018 | Construction CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION- NO TOE BOARDS. @ TIME OF INSP OF A NEW 6 STORY BLDG UNDER CONSTRUCTION @ 2ND FLR LEVEL, ACTIVE JOB SITE, OBSERVED THAT THERE NO #35336041N | Aug 15, 2018 IN VIOLATION | $198 |
None open.
None open.
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 27, 2026, 7:28 AM ET. BBL 3003960012.