14 floors · 74,186 sq ft · built 1930 · class O6 · owner of record: Dom Ben Realty Corp

9open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
179dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 58 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 74,186 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 179 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 179 days
Annual filing
Gas piping inspection (2029 cycle) Likely applies
Local Law 152 · During 2029
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2029
in 1154 days
Next cycle year 2029
Energy audit and retro-commissioning (2029) Likely applies
Local Law 87 · Calendar year 2029
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 869). Agency page

Dec 31, 2029
in 1154 days
Next due 2029
Facade inspection report (Cycle 10A) Applies
Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027
What this is

Buildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. DOB facade records for this building show $144,000 in late-filing or failure-to-file penalties. Agency page

On fileCycle 10 filing on record: SWARMP (2025-11-24)

Open violations

ECB / OATH (3)
IssuedViolationHearingBalance
Aug 9, 2022Construction CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE COFO#1P0008593.ILLEGAL OCCUPANCY NOTED ON 3RD FLOOR SUITE 305 HAS BEEN CONVERTED/OCCUPIED AS MASSAGE PARLOR UNLICENSED WITH 2 MASSAGE ROOMS AND 3 MASSAGE TABLES.REMEDY:
#35655994K
Dec 15, 2022
IN VIOLATION
$0
Mar 30, 2020Construction CLASS - 2
SEC. 27-929.1 AC 27-929.1 FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG
#37018901N
Oct 15, 2020
IN VIOLATION
$0
Nov 15, 2019Construction CLASS - 2
SEC. A.C.27-929.1,FAILURE TO COMPLETE THE INSTALLATION OF A FULL SYSTEM OF AUTOMATIC SPRINKLERS & FILE A FINAL SPRINKLER REPORT PREPARED BY A REGISTERED DESIGN PROFESSIONAL BY 7/1/19,IN AN OFFICE BLDG 100 FEET
#37016387K
Feb 13, 2020
DEFAULT
$0
DOB (3)
IssuedViolationStatus
Feb 22, 2022NO REPORT AND / OR LATE FILING (FACADE)
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
#00249
DOB VIOLATION - ACTIVE
Sep 3, 2019SPRINKLER
FAILED TO FILE FINAL SPRINKLER REPORT BY JULY 1, 2019
#NRF00251
DOB VIOLATION - ACTIVE
May 16, 2013ELEVATOR

#9028/442908
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Feb 22, 2022Facades FISPNRF
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
Active
Sep 3, 2019Sprinklers FTF-SP-FINAL
Active
HPD (1) · C 0 · B 1 · A 0
IssuedClassViolationCorrect by
Sep 1, 2009BSECTION 27-2040 ADM CODE PROVIDE ADEQUATE LIGHTING AT OR NEAR THE OUTSIDE OF THE FRONT ENTRANCEWAY OF THE BUILDING AND KEEP SAME BURNING FROM SUNSET EVERY DAY TO SUNRISE ON THE DAY FOLLOWING 100 WATTS AT FRONT AREAWAYOct 6, 2009