Brooklyn · Block 2580 · Lot 1 · 11222

278 Greenpoint Avenue

1 floors · 52,033 sq ft · built 2000 · class O5 · owner of record: Greenpoint Industrial Services Corp

32open violations
$16,875ECB/OATH penalties owed
0HPD class C (immediately hazardous)
184dto Energy and water benchmarking

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 63 days
Keep the report on file (not filed with DOB)
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 52,033 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 184 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 184 days
Annual filing
Gas piping inspection (2028 cycle) Likely applies
Local Law 152 · During 2028
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2028
in 794 days
Next cycle year 2028
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 2580). Agency page

Dec 31, 2030
in 1524 days
Next due 2030

Open violations

ECB / OATH (6) · $16,875 owed
IssuedViolationHearingBalance
Sep 28, 2026Unknown CLASS - 2
OBSERVED PUMP JACK SCAFFOLD SET UP ON 3RD FLOOR BALCONT AT EXPO 1. MANUFACTURER SPECIFICATIONS NOT MAINTAINED ON SITE FOR PUMP JACK SCAFFOLD.MAINTAIN MANUFACTURER SPECIFICATIONS ON SITE.
#39559881J
Dec 2, 2026
PENDING
$625
Sep 28, 2026Construction CLASS - 2
OBSERVED SUPPORTED SCAFFOLD SET UP ON EXPO 4 WITH FULLY PLANKED BAYS ADJACENT TO STAIR TOWERS CONTRARY TO APPROVED PLANS FILED WITH SF PERMIT.SCAFFOLD TO CONFORM TO APPROVED PLANS
#39559880H
Dec 2, 2026
PENDING
$1,250
Jul 5, 2025Construction CLASS - 2
OBSERVED CONSTRUCTION INSTALLED AT EXP# 1 2 3 4 NOT MAINTAINED AS PER CODE. CONSTRUCTION FENCE COVERED WITH MULTIPLE POSTERS/ ADVERTISING UNRELATED TO JOBSITE .
#39542016Y
Jun 21, 2027
DEFAULT
$5,000
Jul 5, 2025Unknown CLASS - 2
BC 3303.3 WATCHPERSON. 6 STORY NEW BUILDING, BUILDING APPROXIMATELY 11887 SQUARE FEET. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE AND DOOR TO ALERT WATC
#39542015M
Jul 23, 2026
DEFAULT
$10,000
Sep 13, 2024Construction CLASS - 2
OBSERVED JOBSITE FENCE GATES BENT AND DAMAGED AT EXP#3 & EXP# 3/4 CORNER, WITH 1 SECTION OF THE GATE AT THE CORNER DISLODGED AND LEANING.. MAINTAIN JOBSITE FENCE IN CODE-COMPLIANCE.
#39532383R
Jan 20, 2026
IN VIOLATION
$0
Oct 4, 2017Construction CLASS - 2
SEC. 3316.9.2 NO 32HRS RIGGING CERT FOR PERSONNEL WORKING W/RIGGING EQUIPMENT HOISTING OUTSIDE OF A BLDG. PERFORMED AUDIT INSPECTION ON CD 3866,CN974/16. AT TIME OD INSPECTION HMD#10047 OSVIALDO VALERIO WAS THE
#35225422P
Nov 20, 2017
ADMIT/IN-VIO
$0
DOB (10)
IssuedViolationStatus
Apr 22, 2023FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
#00816
DOB VIOLATION - ACTIVE
Aug 21, 2022FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
#00076
DOB VIOLATION - ACTIVE
Feb 2, 2022FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00387
DOB VIOLATION - ACTIVE
Dec 1, 2021FAILURE TO POST ENERGY GRADE/SCORE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
#2102423
DOB VIOLATION - ACTIVE
Nov 2, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00502
DOB VIOLATION - ACTIVE
Aug 2, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#00726
DOB VIOLATION - ACTIVE
Jun 20, 2021FAILURE TO SUBMIT EER
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2020
#10355
DOB VIOLATION - ACTIVE
Jun 2, 2021FAILURE TO BENCHMARK
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
#01101
DOB VIOLATION - ACTIVE
Oct 9, 2008CONSTRUCTION

#0101JV
DOB VIOLATION - ACTIVE
Aug 16, 1993LOCAL LAW 62/91 - BOILERS

#19165
DOB VIOLATION - ACTIVE
DOB NOW Safety (16)
IssuedViolationStatus
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Jan 8, 2026Gas Piping - LL152 FTF-PL-PER
Cycle 2, Sub-cycle A (premises is in Community District 1)
Active
Dec 19, 2025GHG Emissions - LL97 FTF-EN-LL97320
Active
Dec 19, 2025GHG Emissions - LL97 FTF-EN-LL97320
Active
Apr 22, 2023Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Aug 21, 2022Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Feb 2, 2022Benchmarking - LL84 FTF-EN-BENCH
Active
Dec 1, 2021Energy Grade - LL33 FTP-EN-EGRDEA
Active
Nov 2, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
Aug 2, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
Jun 20, 2021Retro-Commissioning - LL87 FTF-EN-EARCX
Active
Jun 2, 2021Benchmarking - LL84 FTF-EN-BENCH
Active
HPD (0)

None open.

Issued in the last 120 days

DateSourceWhatNow
Sep 28, 2026ECBUnknown: OBSERVED PUMP JACK SCAFFOLD SET UP ON 3RD FLOOR BALCONT AT EXPO 1. MANUFACTURER SPECIFICATIONS NOT MAINTAINED ON SITE FOR PUMP JACK SCAFFOLD.MAINTAIN MANUFACTURER SPECIFICATIONS ON SITE.Open
Sep 28, 2026ECBConstruction: OBSERVED SUPPORTED SCAFFOLD SET UP ON EXPO 4 WITH FULLY PLANKED BAYS ADJACENT TO STAIR TOWERS CONTRARY TO APPROVED PLANS FILED WITH SF PERMIT.SCAFFOLD TO CONFORM TO APPROVED PLANSOpen

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 29, 2026, 8:35 AM ET. BBL 3025800001.

Look up another building