3 floors · 2 apartments · 2,475 sq ft · built 1931 · class S2 · owner of record: Great Hills Realty Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Gas piping inspection (2026 cycle) Likely applies Local Law 152 · During 2026 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2026 in 50 days | Due this year |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 50 days | Keep the report on file (not filed with DOB) |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-05 (Accepted). Agency page | Dec 31, 2026 in 50 days | 2 of 2 without an accepted 2026 report yet |
| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 294 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jul 20, 2018 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION #35263505H ISSUED ON 10/26/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT.NO #35341382H | Sep 26, 2018 IN VIOLATION | $2,500 |
| Jun 6, 2018 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION#35263505H ISSUED ON 10/26/17 AND TO FILE A CERTIFICATE OF CORRECTION PUSUANT TO 28-201.1 AND 1RCNY 102-01.FOR WORK WITHOUT A PERMIT #35339216J | Aug 6, 2018 DEFAULT | $6,250 |
| Jan 20, 2018 | Construction CLASS - 1 FAILURE TO COMPLY WITH THE COMMISSIONERS ORDER CONTAINED IN SUMMONS/VIOLATION # 35263503H ISSUED O 10/28/17 AND TO FILE A CERTIFICATE OF CORRECTION PURSUANT TO 28-201.1 AND 1RCNY 102-01.WORK WITHOUT A PERMIT #35283425X | Mar 19, 2018 WRITTEN OFF | $0 |
| Oct 28, 2017 | Construction CLASS - 1 WORK WITHOUT A PERMIT.WORK NOTED:AT TIME OF INSPECTION A WOOD FRAMED DECK APPROXIMATELY 30'X12'HAS BEEN ERECTED AT THE REAR YARD FIRST FLOORWITHOUT A PERMIT.THE WOOD DECK HAS BEEN ELEVATED OFF GRADE APPROXIMATE #35263505H | Mar 7, 2018 WRITTEN OFF | $0 |
| May 10, 2014 | Construction CLASS - 1 FAILURE TO PROVIDE UNOBSTRUCTED EXIT PASSAGEWAY IN THAT REAR FIR ESCAPE LANDINGS ARE BEING OBSTRUCTED BY A/C UNIT, LUMBER, DEBRIS. REMEDY: REMOVE OBSTRUCTIONS IMMEDIATLY. #35091414Y | Oct 6, 2014 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #11473 | DOB VIOLATION - ACTIVE |
| Sep 23, 2024 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION #10425 | DOB VIOLATION - ACTIVE |
| Jun 20, 2023 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION #43035 | DOB VIOLATION - ACTIVE |
| Jan 24, 2018 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00440 | DOB VIOLATION - ACTIVE |
| Jul 30, 2014 | FAIL TO CERTIFY CLASS 1 FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION #00111 | DOB VIOLATION - ACTIVE |
| Feb 10, 1997 | LOCAL LAW 62/91 - BOILERS #25109 | DOB VIOLATION - ACTIVE |
| Aug 29, 1995 | LOCAL LAW 62/91 - BOILERS #28907 | DOB VIOLATION - ACTIVE |
| Jun 1, 1994 | LOCAL LAW 62/91 - BOILERS #12293 | DOB VIOLATION - ACTIVE |
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #27424 | DOB VIOLATION - ACTIVE |
| Jun 1, 1993 | LOCAL LAW 62/91 - BOILERS #12292 | DOB VIOLATION - ACTIVE |
| Dec 13, 1991 | PLUMBING #011 | DOB VIOLATION - ACTIVE |
| Jun 14, 1991 | BOILER #77283-01 | VIOLATION UNSERVED ECB-ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 23, 2024 | Boiler LBLVIO Violation Issued-Failure To File 2023 External Low Pressure Inspection Report | Active |
| Jun 20, 2023 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Jan 17, 2020 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT | Active |
| Jan 24, 2018 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2014 | AEUHAZ FTC-AEU-HAZ | Active |
| Feb 10, 1997 | Boiler LL6291 | Active |
| Aug 29, 1995 | Boiler LL6291 | Active |
| Jun 1, 1994 | Boiler LL6291 | Active |
| Jun 1, 1993 | Boiler LL6291 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Sep 10, 2026 | B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Oct 15, 2026 |
| Sep 10, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Dec 14, 2026 |
| Oct 4, 2012 | B | Apt 1FL · SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 1FL, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 8, 2012 |
| Oct 4, 2012 | B | SECTION 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR FIRE RETARDANT MATERIAL AT WALLS AT STAIRS, FIRST FLOOR TO SECOND FLOOR AT PUBLIC HALL | Nov 8, 2012 |
| Oct 4, 2012 | B | SECTION 27-2005, 2007 ADM CODE AND DEPT. RULES AND REGULATIONS. REMOVE THE ENCUMBRANCE OBSTRUCTING EGRESS FROM FIRE ESCAPES FLOWER POTS AT SECOND STORY BALCONY AT REAR COURT YARD | Nov 8, 2012 |
| Jul 30, 2007 | B | Apt 2 · SECTION 27-2046.1, 2046.2 HMC: PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES. IN THE ENTIRE APARTMENT LOCATED AT APT 2, 3rd STORY | Sep 3, 2007 |
| Jul 30, 2007 | B | Apt 2 · SECTION 27-2018 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF VERMIN BEDBUGS IN THE ENTIRE APARTMENT LOCATED AT APT 2, 3rd STORY | Sep 3, 2007 |
| Date | Source | What | Now |
|---|---|---|---|
| Sep 10, 2026 | HPD B | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Open |
| Sep 10, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT PUBLIC HALL, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 11, 2026, 5:32 PM ET. BBL 3033200002.