6 floors · 66 apartments · 56,788 sq ft · built 1925 · class D4 · owner of record: Francine Towers Owners Corp.
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2025-12-23 (Accepted). Agency page | Dec 31, 2026 in 60 days | 2 of 2 without an accepted 2026 report yet |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 56,788 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 304 days | Registered through 2027-09-01 |
| Energy audit and retro-commissioning (2028) Likely applies Local Law 87 · Calendar year 2028 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 1918). Agency page | Dec 31, 2028 in 791 days | Next due 2028 |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 2 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1156 days | Next cycle year 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 14, 2023 | Elevators CLASS - 2 PROVIDE DESIGNATED LOBBY BRAILLE TAGS. ADJUST BRAILLE TAGS TO ADA CODE HEIGHT. IN CASE OF FRIE SIGN MISSING IN BASEMENT. MAIN LINE CAN BE OPENED WHEN POWER ON. REMOVE NON ELEVATOR EQUIPMENT FROM MACHINE ROOM. W #39092465Y | Mar 25, 2024 IN VIOLATION | $337 |
| Aug 26, 2019 | Elevators CLASS - 2 PROVIDE DESIGNATED LOBBY BRAILLE TAGS. INOPERATIVE CAR PHONE. ADJUST BASEMENT DOOR CHECK. PREVENT CHAIRS IN LAUNDRY ROOM FROM BLOCKING MACHINE ROOM DOOR. PROVIDE CODE COMPLIANT MACHINE ROOM SIGN. MAIN LINE CAN #39008447X | Oct 21, 2019 ADMIT/IN-VIO | $0 |
None open.
| Issued | Violation | Status |
|---|---|---|
| Sep 25, 2026 | Benchmarking - LL84 DQ-EN-BENCH FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 2) | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Aug 20, 2025 | C | Apt 6J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Aug 26, 2025 |
| Aug 20, 2025 | A | Apt 6J · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 23, 2025 |
| Aug 20, 2025 | A | Apt 6J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN THE 1st ROOM FROM EAST LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 23, 2025 |
| Aug 20, 2025 | A | Apt 6J · § 27-2037, 2038 HMC: PROVIDE A SAFE AND ADEQUATE SUPPLY OF ELECTRIC SERVICE TO THE FIXTURES AT CEILING IN THE FOYER LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 23, 2025 |
| Aug 20, 2025 | A | Apt 6J · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES LOW VOLUME IN THE KITCHEN LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 23, 2025 |
| Aug 20, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEIL AT BULKHEAD | Nov 23, 2025 |
| Aug 20, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARTED PLASTER AT ALL WALLS AND CEILING AT BULKHEAD | Sep 24, 2025 |
| Jul 8, 2025 | B | Apt 6J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17740673 ISSUED 06-MAR-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE § | Aug 12, 2025 |
| Jul 8, 2025 | B | Apt 6J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 17740678 ISSUED 06-MAR-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CO | Aug 12, 2025 |
| Jun 27, 2025 | B | Apt 6J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''east'' | Aug 1, 2025 |
| Jun 27, 2025 | B | Apt 6J · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING LIGHT FIXTURE AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''east'' | Aug 1, 2025 |
| Jun 27, 2025 | B | Apt 6J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''east'' | Aug 1, 2025 |
| Jun 27, 2025 | B | Apt 6J · § 27-2024 ADM CODE PROVIDE ADEQUATE SUPPLY OF COLD WATER FOR THE FIXTURES AT SINK IN THE KITCHEN LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''east'' | Aug 1, 2025 |
| Apr 21, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING, NORTH AND SOUTH WALLS AT PUBLIC HALL, 1st STORY | May 26, 2025 |
| Apr 21, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING, NORTH AND SOUTH WALLS AT PUBLIC HALL, 1st STORY | Jul 25, 2025 |
| Apr 4, 2025 | A | Apt 2I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, AND THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Jul 8, 2025 |
| Apr 4, 2025 | C | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF (2) BROKEN WIRE GLASS LITES AT DOORS AT NORTH WALL AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Apr 10, 2025 |
| Apr 4, 2025 | A | Apt 2I · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILE IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Jul 8, 2025 |
| Apr 4, 2025 | B | Apt 2I · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE INTERCOM SYSTEM FROM BUILDING VESTIBULE TO BOX IN THE FOYER LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 9, 2025 |
| Apr 4, 2025 | A | Apt 2I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL, AND THE SOUTH WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Jul 8, 2025 |
| Apr 4, 2025 | B | Apt 2I · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT THE LOWER SASH WINDOW IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 9, 2025 |
| Apr 4, 2025 | A | Apt 2I · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET COVER PLATE AT THE EAST WALL IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE 3RD RECCESSED WINDOW FRAME CASING AT NORTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, SOUTH WALL, AND THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE NORTH WALL, SOUTH WALL, AND THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | May 9, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL, AND THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''EAST'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE NORTH WALL, AND THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''EAST'' | Jul 8, 2025 |
| Apr 4, 2025 | A | Apt 2I · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, EAST WALL, SOUTH WALL, WEST WALL, AND THE CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''WEST'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''WEST'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE CEILING AT PUBLIC HALL, 1st STORY, SECTION ''WEST'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT FIRE RETARDANT MATERIAL AT THE 4TH RECCESSED WINDOW FRAME CASING,HEADER, AND SILL AT SOUTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE 4TH RECCESSED WINDOW FRAME CASING, HEADER, AND SILL AT SOUTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT FIRE RETARDANT MATERIAL AT THE 3RD RECCESSED WINDOW FRAME HEADER, AND CASING AT SOUTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE 3RD RECCESSED WINDOW FRAME HEADER, AND CASIING AT SOUTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 2ND RECCESSED WINDOW FRAME HEADER AT SOUTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE 2ND RECCESSED WINDOW FRAME HEADER AT SOUTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1ST RECCESSED WINDOW FRAME CASING, AND SILL AT SOUTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | Apt 2I · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ESCUTCHEAN PLATE AT THE RISER AT THE FLOOR IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | Jul 8, 2025 |
| Apr 4, 2025 | B | Apt 2I · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT THE BATHTUB IN THE BATHROOM LOCATED AT APT 2I, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''EAST'' | May 9, 2025 |
| Apr 4, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE 1ST RECCESSED WINDOW FRAME CASING, AND SILL AT SOUTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 4TH RECCESSED WINDOW FRAME CASING, SILL, AND APRON AT NORTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT THE 4TH RECCESSED WINDOW FRAME CASING, SILL, AND APRON AT NORTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 4, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 3RD RECCESSED WINDOW FRAME CASING AT NORTH AT PUBLIC HALL, 1st STORY, SECTION ''CENTER'' | Jul 8, 2025 |
| Apr 3, 2025 | B | Apt 6J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS IN THE FOYER LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 8, 2025 |
| Apr 3, 2025 | C | Apt 6J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE FOYER LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 9, 2025 |
| Mar 31, 2025 | B | Apt 6J · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GREATER THAN 10 SQUARE FEET AT CEILING IN CLOSET IN THE FOYER LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 5, 2025 |
| Mar 31, 2025 | C | Apt 6J · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 6, 2025 |
| Mar 31, 2025 | B | Apt 6J · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | May 5, 2025 |
| Mar 31, 2025 | C | Apt 6J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT SOUTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 6, 2025 |
| Mar 21, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT NORTH, EAST, SOUTH WALLS AND CEILING AT PUBLIC HALL STAIRS, 6th STORY | Apr 25, 2025 |
| Mar 21, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT BULKHEAD CEILING, NORTH, EAST, SOUTH AND WEST WALLS AT 1st PUBLIC HALL BULKHEAD FROM EAST, 6th STORY | Jun 24, 2025 |
| Mar 21, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER BULKHEAD CEILING, EAST, SOUTH AND WEST WALLS AT 1st PUBLIC HALL BULKHEAD FROM EAST, 6th STORY | Apr 25, 2025 |
| Mar 21, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT BULKHEAD NORTH, EAST, SOUTH, WEST WALLS AND CEILING AT 1st PUBLIC HALL BULKHEAD FROM EAST, 6th STORY | Apr 25, 2025 |
| Mar 21, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH, EAST, SOUTH WALLS AND CEILING AT PUBLIC HALL, 6th STORY | Jun 24, 2025 |
| Mar 21, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING, NORTH, EAST, AND SOUTH WALLS AT PUBLIC HALL, 6th STORY | Apr 25, 2025 |
| Mar 10, 2025 | B | Apt 6J · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR TILES IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 14, 2025 |
| Mar 10, 2025 | B | Apt 6J · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd ROOM FROM NORTH LOCATED AT APT 6J, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 14, 2025 |
| Mar 10, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AT PUBLIC HALL, 6th STORY | Jun 13, 2025 |
| Mar 10, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 6th STORY | Apr 14, 2025 |
Showing 60 of 141. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Sep 25, 2026 | DOB Safety | Benchmarking - LL84: FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 9:09 AM ET. BBL 3019180013.