Brooklyn · Block 1181 · Lot 24 · 11238

277 Eastern Parkway

6 floors · 67 apartments · 37,752 sq ft · built 1928 · class D1 · owner of record: Creative Housing Ltd

12open violations
$0ECB/OATH penalties owed
0HPD class C (immediately hazardous)
69dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 69 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 69 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 69 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 85 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 37,752 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 190 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 190 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 313 days
Registered through 2027-09-01
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-13 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (2)
IssuedViolationStatus
Jun 18, 2013ELEVATOR

#9027H476529
DOB VIOLATION - ACTIVE
Jun 8, 2013ELEVATOR

#9027H476530
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (10) · C 0 · B 10 · A 0
IssuedClassViolationCorrect by
Oct 13, 2026BApt 6C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTHNov 17, 2026
Oct 13, 2026BApt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTHNov 17, 2026
Oct 13, 2026BApt 6C · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTHNov 17, 2026
Oct 13, 2026BApt 6C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTHNov 17, 2026
May 13, 2026BApt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 17, 2026
May 13, 2026BApt 5G · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING BASEBOARD AT NORTH WALL IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 17, 2026
May 13, 2026BApt 5G · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING BASE CABINET AT EAST WALL IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 17, 2026
May 13, 2026BApt 5G · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR FRAME AT WEST WALL IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 17, 2026
May 13, 2026BApt 5G · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AND AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 17, 2026
May 13, 2026BApt 5G · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT WEST WALL IN THE KITCHEN LOCATED AT APT 5G, 5th STORY, 1st APARTMENT FROM EAST AT SOUTHJul 17, 2026

Issued in the last 120 days

DateSourceWhatNow
Oct 13, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Oct 13, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4th ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Oct 13, 2026HPD B§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Oct 13, 2026HPD B§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT 6C, 6th STORY, 1st APARTMENT FROM WEST AT NORTHOpen
Jul 13, 2026HPD B§ 27-2005 ADM CODE PROPERLY SECURE THE LOOSE WASH BASIN IN THE BATHROOM LOCATED AT APT 1G, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHClosed

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 23, 2026, 1:31 AM ET. BBL 3011810024.

Look up another building