5 floors · 30 apartments · 30,631 sq ft · built 1900 · class D1 · owner of record: Harlem Shangri -La Housing Development F Und
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 30,631 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-13 (Accepted). Agency page | On file | 2026 reports accepted |
None open.
| Issued | Violation | Status |
|---|---|---|
| Mar 10, 2022 | CONSTRUCTION APPROX 50LF OF 38" TALL CMU WALL WITH 6' TALL CHAIN LINK FENCE ATOP LOCATED AT EXP #2 ON PROPERTY LINE IS IN DANGER OF COLLAPSE INTO EGRESS PATH OF ADJACENT PROPERTY #294 WEST 147TH STREET, CREATING AN IMMEDIATELY HAZARDOUS CONDITION. #22-00661 | DOB VIOLATION - ACTIVE |
| Oct 1, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT #00254 | DOB VIOLATION - ACTIVE |
| Mar 3, 2015 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT #00300 | DOB VIOLATION - ACTIVE |
| May 15, 2014 | LOW PRESSURE BOILER VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT #06533 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2022 Cat1 Test Affirmation of Correction | Active |
| Oct 1, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT | Active |
| Mar 3, 2015 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT | Active |
| May 15, 2014 | Boiler LBLVIO VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 1, 2026 | B | Apt 1A · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Nov 5, 2026 |
| Oct 1, 2026 | C | Apt 1A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Oct 27, 2026 |
| Jul 14, 2026 | B | Apt 2A · § 27-2005 HMC: REFIT THE DOOR AT ENTRANCE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Aug 18, 2026 |
| Jul 2, 2026 | A | Apt 2A · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT NORTH WALL. IN THE KITCHEN LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Oct 5, 2026 |
| May 11, 2026 | B | Apt 2A · § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE HINGES AT THE DOOR IN THE 5th ROOM FROM EAST LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 15, 2026 |
| May 11, 2026 | B | Apt 2A · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 15, 2026 |
| May 11, 2026 | C | Apt 2A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 3rd APARTMENT FROM SOUTH AT WEST | Jun 6, 2026 |
| Apr 6, 2026 | C | Apt 2A · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2A, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH | May 2, 2026 |
| Mar 17, 2026 | C | Apt 3F · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 3F, 3rd STORY, 3rd APARTMENT FROM NORTH AT EAST | Mar 17, 2026 |
| Mar 6, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Mar 12, 2026 |
| Mar 6, 2026 | B | Apt 4B · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 10, 2026 |
| Mar 6, 2026 | C | Apt 4B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 1, 2026 |
| Mar 6, 2026 | B | Apt 4B · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 4B, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 10, 2026 |
| Feb 25, 2026 | A | Apt 4E · § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT WEST RADIATOR IN THE 1st ROOM FROM NORTH LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 31, 2026 |
| Feb 25, 2026 | C | Apt 4E · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT DOOR IN THE ENTRANCE LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 11, 2026 |
| Feb 25, 2026 | A | Apt 4E · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING AND WEST WALL IN THE 1st ROOM FROM NORTH LOCATED AT APT 4E, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | May 31, 2026 |
| Feb 20, 2026 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 27, 2026 |
| Feb 20, 2026 | B | Apt 2E · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Mar 27, 2026 |
| Feb 20, 2026 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 27, 2026 |
| Feb 20, 2026 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 27, 2026 |
| Feb 20, 2026 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 4th ROOM FROM NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 27, 2026 |
| Feb 18, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED LEADING TO CELLAR AT PUBLIC HALL, 1st STORY | Feb 24, 2026 |
| Feb 11, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BASEMENT AT BOILER ROOM | Feb 17, 2026 |
| Feb 11, 2026 | C | Apt 2E · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2E , 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 11, 2026 |
| Feb 11, 2026 | C | Apt 2B · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 11, 2026 |
| Feb 11, 2026 | C | Apt 2E · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2E , 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 11, 2026 |
| Feb 11, 2026 | C | Apt 2B · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 11, 2026 |
| Feb 5, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Feb 11, 2026 |
| Feb 2, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Feb 8, 2026 |
| Jan 7, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Jan 13, 2026 |
| Jan 7, 2026 | B | Apt 2B · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Feb 11, 2026 |
| Jan 7, 2026 | C | Apt 2B · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 21, 2026 |
| Jan 5, 2026 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT CELLAR AT BOILER ROOM | Jan 11, 2026 |
| Sep 25, 2025 | B | Apt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT EAST WALL, WEST WALL, AND NORTH WALL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 30, 2025 |
| Sep 25, 2025 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT COMPACTOR CLOSET, 2nd STORY | Oct 21, 2025 |
| Sep 25, 2025 | B | Apt 2D · § 27-2026 ADM CODE REMOVE ALL OBSTRUCTIONS AND REPAIR ALL DEFECTS IN AT WASTELINE AT BATHTUB IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 30, 2025 |
| Sep 25, 2025 | B | Apt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CAULKING AROUND BATHTUB IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Oct 30, 2025 |
| Mar 17, 2025 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER SASH OF SECOND WINDOW FROM NORTH AT EAST WALL IN THE 2nd ROOM FROM NORTH LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 21, 2025 |
| Mar 17, 2025 | C | Apt 2D · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Mar 31, 2025 |
| Mar 17, 2025 | B | Apt 2D · § 27-2005 HMC: REFIT WEST 1 DOOR IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 21, 2025 |
| Mar 17, 2025 | B | Apt 2D · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCES AT LOWER SASH OF 1ST WINDOW FROM NORTH AT EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 21, 2025 |
| Mar 14, 2025 | B | Apt 2D · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, THE SOUTH WALL AND THE CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 18, 2025 |
| Mar 14, 2025 | B | Apt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT THE NORTH WALL, EAST WALL AND WEST WALL IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 18, 2025 |
| Mar 14, 2025 | B | Apt 2D · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 18, 2025 |
| Mar 14, 2025 | B | Apt 2D · § 27-2005 HMC: REFIT DOOR IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 18, 2025 |
| Mar 14, 2025 | B | Apt 2D · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC FLOOR TILES IN THE BATHROOM LOCATED AT APT 2D, 2nd STORY, 2nd APARTMENT FROM NORTH AT EAST | Apr 18, 2025 |
| Feb 24, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED AT BOILER ROOM | Mar 2, 2025 |
| Feb 24, 2025 | C | Apt 2E · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY, 1st APARTMENT FROM SOUTH AT WEST | Feb 22, 2025 |
| Oct 15, 2024 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 10, 2024 |
| Oct 15, 2024 | A | Apt 2B · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE DOOR LOCK IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Jan 18, 2025 |
| Oct 15, 2024 | C | Apt 2B · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 10, 2024 |
| Oct 15, 2024 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 2nd ROOM FROM EAST AT NORTH LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2024 |
| Oct 15, 2024 | B | Apt 2B · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE BATHROOM LOCATED AT APT 2B, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 19, 2024 |
| Oct 2, 2024 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT COMPACTOR CLOSET, 1st STORY | Oct 28, 2024 |
| Aug 23, 2024 | C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES AT COMPACTOR CLOSET, 2nd STORY | Sep 18, 2024 |
| Aug 14, 2024 | B | Apt 4F · § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CLOSET DOOR AT SOUTH WALL IN THE PRIVATE HALLWAY LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 18, 2024 |
| Aug 14, 2024 | C | Apt 4F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 9, 2024 |
| Aug 14, 2024 | B | Apt 4F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 18, 2024 |
| Aug 14, 2024 | C | Apt 4F · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 9, 2024 |
| Aug 14, 2024 | B | Apt 4F · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILES AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 4F, 4th STORY, 3rd APARTMENT FROM NORTH AT EAST | Sep 18, 2024 |
Showing 60 of 97. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Oct 1, 2026 | HPD B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT THE CEILING IN THE 1st BATHROOM FROM NORTH LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Open |
| Oct 1, 2026 | HPD C | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 1A, 1st STORY, 3rd APARTMENT FROM SOUTH AT WEST | Open |
| Jul 14, 2026 | HPD B | § 27-2005 HMC: REFIT THE DOOR AT ENTRANCE IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2A, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 1, 2026, 11:09 AM ET. BBL 1020320061.