Brooklyn · Block 3443 · Lot 16 · 11237

276 Cooper Street

3 floors · 6 apartments · 4,650 sq ft · built 1906 · class C2 · owner of record: Ir Cooper Llc

10open violations
$0ECB/OATH penalties owed
1HPD class C (immediately hazardous)
68dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 4 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 68 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 68 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 68 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 84 days
Annual
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 312 days
Registered through 2027-09-01

Open violations

ECB / OATH (1)
IssuedViolationHearingBalance
Mar 31, 1993Construction Non-Hazardous
ALTERED BUILDING OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY. PREMISES OCCUPIED AT 2ND FLOOR. ALT #906/90. REMEDY: OBTAIN CERTIFICATE OF OCCUPANCY
#34091026X
Oct 18, 1993
WRITTEN OFF
$0
DOB (0)

None open.

DOB NOW Safety (0)

None open.

HPD (9) · C 1 · B 7 · A 1
IssuedClassViolationCorrect by
Aug 24, 2021CApt 1R · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 1R, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHSep 19, 2021
Jul 6, 2021B§ 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. RESTORE EGRESS BY REMOVING LOCKING DEVICE AND ARRANGE TO OPEN READILY THE GATE IN FENCE AT LOT LINE CONSISTING SLIDE BOLT ARRANGED FOR PADLOCKING, INSTALLED AT METAL GATE AT BUILDING FRONT AT EASTAug 10, 2021
May 13, 2021B§ 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE LOCKS FOR APARTMENTS 1F AND 1R MAILBOXES IN VESTIBULE AT PUBLIC HALL, 1st STORYJun 17, 2021
Feb 24, 2020B§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PLEXI-GLASS PANEL INSTALLED AT FRONT ENTRANCE DOOR TO BUILDING , 1st STORYMar 30, 2020
Jun 28, 2019B§ 27-2005 ADM CODE PROVIDE PASSAGE LOCK DEVICE AT REAR DOOR LEADING OUT TO REAR YARD AT BASEMENTAug 2, 2019
Jun 26, 2019B§ 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOCKS AT DOOR LEADING TO COURTYARD AT BASEMENTJul 31, 2019
Jan 12, 2009BApt 1F · § 27-2005 ADM CODE REPLACE WITH NEW THE BROKEN OR DEFECTIVE DOORFRAME IN THE BATHROOM LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTH AT EASTFeb 16, 2009
Jan 12, 2009AApt 1F · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 1st ROOM FROM NORTH AT WEST, THE BATHROOM , THE KITCHEN , THE 1st ROOM FROM NORTH AT EAST, THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 1F, 1st STORY, 1st APARTMENT FROM NORTHApr 17, 2009
Oct 30, 2000B§ 27-2089 ADM CODE THE PREMISES FORMERLY A VACANT BUILDING ARE NOW OCCUPIED BY OTHER THAN A CARETAKER WITHOUT OBTAINING A CERTIFICATE OF OCCUPANCY AT ALL APARTMENTS ALL STORIESDec 9, 2000

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Oct 24, 2026, 10:15 AM ET. BBL 3034430016.

Look up another building