class V0 · owner of record: Woodside Consulting Corp
New violations the morning after they're issued, plus deadline reminders. Free for one building.
We couldn't find building attributes for this lot, so no deadlines are listed.
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 18, 2026 | Construction CLASS - 2 DURING INSPECTION OF A CLOSED 6-STORY NB AT THE SOE PHASE. I OBSERVED THIS UPON REVIEWING THE DOB RECORDS. THE PERMIT HOLDER FAILED TO COMPLY WITH THE COMMISSIONER'S ORDER AND FILE A CERTIFICATE OF CORRECTION W #39554264L | Jun 22, 2027 DEFAULT | $6,250 |
| May 18, 2026 | Construction CLASS - 2 NO COMPLIANCE; THE PERMIT HOLDER FAILED TO FILE A CERTIFICATE OF CORRECTION. CLASS I VIOLATION 39551825Z WAS WRITTEN ON 3/16/2026, AND AS OF DATE, NO CERTIFICATE OF CORRECTION WAS FILED WITH THE NYC DEPARTMENT #39554265N | Jun 22, 2027 DEFAULT | $6,250 |
| May 18, 2026 | Construction CLASS - 2 DURING INSPECTION OF A CLOSED 6-STORY NB. I OBSERVED PEDESTRIANS FORCED TO WALK OUT INTO THE ROADWAY. PLASTIC YODOCK BARRIERS ON THE SIDEWALK WERE NOT MAINTAINED AS PER THE MANUFACTURER'S SPECIFICATIONS, WERE N #39554266P | Jun 22, 2027 DEFAULT | $6,250 |
| Mar 16, 2026 | Unknown CLASS - 1 3310.4 SITE SAFETY MONITORING PROGRAM- OBSERVED ACTIVE JOBSITE IN SOE PHASE OF CONSTRUCTION. UPON REVIEW DOB RECORDS THERE IS NO APPOINTED SITE SAFETY MANAGER/ COORDINATOR FOR JOBSITE. STOP ALL WORK ENTIRE JOBS #39551824R | May 7, 2027 PENDING | $5,000 |
| Mar 16, 2026 | Unknown CLASS - 1 3310.3 SITE SAFETY PLAN- OBSERVED ACTIVE JOBSITE IN SOE PHASE OF CONSTRUCTION. UPON REVIEW OF DOB RECORDS AND REQUEST FROM ONSITE PERSONNEL, THERE IS NO DOB APPROVED SITE SAFETY PLANS UNDER APPLICATION X0128234 #39551825Z | May 7, 2027 PENDING | $5,000 |
| Jan 12, 2026 | Unknown CLASS - 2 3304.4.5- ON ACTIVE EXCAVATION JOBSITE, OBSERVED INACTIVE EXCAVATOR SEATED ON TOP OF DISTURBED SOIL. UPON REQUEST FROM ONSITE PERSONNEL FOR ENGINEER APPROVED LETTER STATING THAT DISTURBED SOIL CAN WITHSTAND SUP #39549029P | Apr 8, 2027 | $2,500 |
| Jan 12, 2026 | Unknown CLASS - 2 OBSERVED ACTIVE JOBSITE IN SOE OPERATIONS. UPON REQUEST FOR CONSTRUCTION SUPERINTENDENT 029521 DAILY LOG BOOK, NONE WERE PROVIDED AT THE TIME OF INSPECTION.MAINTAIN DAILY INSPECTION LOGS ONSITE AS CODE REQUIRES #39549041H | Apr 8, 2027 | $5,000 |
| Jan 12, 2026 | Construction CLASS - 2 OBSERVED JOBSITE WITH ONGOING SOE OPERATIONS. UPON REQUEST FROM ONSITE PERSONNEL FOR PRECONSTRUCTION SURVEYS & MONITORING REPORTS, NONE WERE PROVIDED AT THE TIME OF INSPECTION. STOP ALL SOE OPERATIONS. PROVIDE/ #39549030M | Apr 8, 2027 | $1,250 |
| Jan 12, 2026 | Construction CLASS - 2 OBSERVED CONSTRUCTION FENCE INSTALLED AROUND THE PERIMETER OF ACTIVE SOE JOBSITE. AT EXPOSURE 4 THE CONSTRUCTION FENCE IS SEVERELY AND LEANING ONTO ADJACENT PROPERTY COMMON AREA AND IS MISSING SECTIONS. STOP AL #39549032X | Apr 8, 2027 | $1,000 |
| Issued | Violation | Status |
|---|---|---|
| Mar 3, 2026 | CONSTRUCTION FTM RW.PRPERTY IS A VACANT CONSTRUCT SITE W/ ACTIVE PERMT UNDR SE JOB ALONG EXP2 LOTLINE, A STONE RW APRROX 10' TALL & 113' LONG. GRADE WAS EXCAVTED ALONG EXP2 RW.RW HAS MULTI CRCKS W/LOOSE STONES ON TOP.RMDY: RETAIN NYS PE TO EVALUTE RW ONPROPRTY & FILE REPAIRS DW65W/ DOB RW TO BE PERMANTLY REPAIR #RW20801TC | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
| Jul 30, 2026 | AEUHAZ FTC-AEU-HAZ | Active |
None open.
| Date | Source | What | Now |
|---|---|---|---|
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
| Jul 30, 2026 | DOB Safety | AEUHAZ: | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 3, 2026, 10:53 AM ET. BBL 2032530086.