6 floors · 48 apartments · 49,850 sq ft · built 1940 · class D1 · owner of record: 265 Quentin Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 69 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 69 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 85 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 49,850 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 190 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 190 days | Annual filing |
| Gas piping inspection (2027 cycle) Likely applies Local Law 152 · During 2027 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 11 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2027 in 434 days | Next cycle year 2027 |
| Annual boiler inspection (1 boiler) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-08-05 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 14, 2002 | Construction Non-Hazardous WORK WITHOUT A PERMIT. WORK NOTED LAUNDRY ROOM SLOP SINK, 2 WAS HERS AND DRYER IN ART ROOM. 2ND LAUNDRY GAS STOVE AND WASHER, 2 GAS STOVES OPERATIONS IN CLASS B APT. NEXT TO BATH, FULL BATH WITH SHOWER. PARTITI #34341455N | Jul 28, 2003 WRITTEN OFF | $0 |
| Aug 14, 2002 | Construction Non-Hazardous ALTERED BUILDING. OCCUPIED WITHOUT A VALID CERTIFICATE OF OCCUPANCY UNDER ALTERATION TYPE 1 FOR CHANGE TO COFO JOB# 300693658. REMEDY: OBTAIN A VALID CERTIFICATE OF OCCUPANCY. #34341454L | Jul 28, 2003 WRITTEN OFF | $0 |
| May 18, 1998 | Construction Non-Hazardous LL 58/81 CHANGE OF USE OF SPACES IN EXISTING BUILDING. NOTED: ALTERATION 300 658 SELF CERTIFICATION AS PER OPPN ON FILE THE IMMEDIATE ENTRANCE DOES NOT CONFORM TO LL58/87 HANDICAP ACCESSIBEILITY PRSCRIBED #34182255N | Dec 14, 1998 WRITTEN OFF | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2016 | (OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2014 CAT 1 INSP/TST #06684 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2020 External Inspection Affirmation of Correction for LP Device | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2021 Cat1 Test Affirmation of Correction | Active |
| Oct 23, 2023 | Elevators FTC-VT-CAT1-CO Violation Issued-Failure To File 2020 Cat1 Test Affirmation of Correction | Active |
| Nov 14, 2016 | Elevators ACC1 | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 2, 2026 | A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET SAFETY CAPS AT WEST AND EAST WALLS AT PUBLIC HALL, 1st STORY | Jan 5, 2027 |
| Mar 2, 2026 | B | Apt C6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C6, 3rd STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt A7 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A7, 1st STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt F8 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F8, 6th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt C4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C4, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt A6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A6, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt D5 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D5, 4th STORY, 1st APARTMENT FROM WEST AT NORTH | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt B8 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B8, 2nd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt C7 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C7, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt C8 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C8, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt D4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D4, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt D6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D6, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt D8 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT D8, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt E2 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E2, 5th STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt E6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E6, 5th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt E7 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT E7, 5th STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt F1 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F1, 6th STORY, 1st APARTMENT FROM EAST AT SOUTH | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt F3 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F3, 6th STORY, 3rd APARTMENT FROM EAST AT SOUTH | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt F4 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F4, 6th STORY, 1st APARTMENT FROM SOUTH AT WEST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt F6 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT F6, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt B7 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B7, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH | Apr 6, 2026 |
| Mar 2, 2026 | B | Apt B2 · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B2, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTH | Apr 6, 2026 |
| Jan 26, 2026 | C | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES. | Jan 30, 2026 |
| Jan 26, 2026 | C | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | Jan 30, 2026 |
| Dec 22, 2025 | B | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AT VESTIBULE AT PUBLIC HALL, 1st STORY | Jan 26, 2026 |
| Dec 22, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT CEILING AT VESTIBULE AT PUBLIC HALL, 1st STORY | Jan 26, 2026 |
| Nov 24, 2025 | C | Apt F4 · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Jan 15, 2026 |
| Nov 17, 2025 | B | Apt F2 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FEET AT CEILING IN THE KITCHEN LOCATED AT APT F2, 6th STORY, 2nd APARTMENT FROM EAST AT SOUTH ORIGINAL VIOLATION 18095400 ISSUED 17-JUL-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017 | Dec 22, 2025 |
| May 12, 2025 | C | Apt 6D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 7, 2025 |
| May 12, 2025 | C | Apt 6D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 4th STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jun 7, 2025 |
| Apr 24, 2025 | C | Apt 6D · HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 6D, 6th STORY, 2nd APARTMENT FROM SOUTH AT WEST | May 20, 2025 |
| Mar 17, 2025 | C | Apt 6D · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH A | Apr 24, 2025 |
| Sep 21, 2015 | C | Apt C4 · SECTION 27-2056.7 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER | Oct 19, 2015 |
| Aug 5, 2013 | B | Apt A8 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... APPROXIMATELY 10 SQ FT EAST WALL ABOVE BATH TUB. IN THE BATHROOM LOCATED AT APT A8, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Sep 9, 2013 |
| Feb 19, 2013 | B | Apt A8 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT CEILING AND EAST WALL APROX = 8 SQ FT IN THE ENTIRE APARTMENT LOCATED AT APT A8, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Mar 26, 2013 |
| Oct 22, 2012 | B | Apt C8 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... CEILING AND EAST AND NORTH WALLS 20 SQUARE FEET IN THE BATHROOM LOCATED AT APT C8, 3rd STORY, 1st APARTMENT FROM NORTH AT EAST | Nov 26, 2012 |
| Oct 14, 2005 | B | Apt A8 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... & MILDEW AT NORTH & EAST WALLS IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT A8, 1st STORY, APARTMENT AT EAST | Nov 23, 2005 |
| Sep 28, 2005 | C | SECTION 27-2018 ADM CODE ABATE THE NUISANCE CONSISTING OF RODENTS RATS AT CELLAR | Oct 9, 2005 |
| Jul 21, 2005 | B | Apt A8 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... ; NORTH AND EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT A8, 1st STORY | Aug 30, 2005 |
| Jun 14, 2005 | B | Apt A8 · SECTION 27-2005 HMC:TRACE AND REPAIR THE SOURCE AND ABATE THE NUISANCE CONSISTING OF MOLD ... AT NORTH AND EAST WALLS AND CLOSET IN THE 1st ROOM FROM EAST AT NORTH LOCATED AT APT A8, 1st STORY, 1st APARTMENT FROM NORTH AT EAST | Jul 24, 2005 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 2, 2026 | HPD A | § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING ELECTRICAL OUTLET SAFETY CAPS AT WEST AND EAST WALLS AT PUBLIC HALL, 1st STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 23, 2026, 5:43 AM ET. BBL 3066290043.