3 floors · 424 apartments · 396,938 sq ft · built 1952 · class D1 · owner of record: Nyc Housing Authority
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 1994-05-31 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 60 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 60 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 76 days | Annual |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 396,938 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 181 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 181 days | Annual filing |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 10 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 791 days | Next cycle year 2028 |
| Energy audit and retro-commissioning (2032) Likely applies Local Law 87 · Calendar year 2032 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 5582). Agency page | Dec 31, 2032 in 2252 days | Next due 2032 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 7, 2026 | Construction CLASS - 1 FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTED:OBSERVED BROKEN WINDOW AT TOP FLOOR AT EXP 3(W.ELEV).REM:MAINTAIN EXTERIOR FACADE.TAKE SAFETY MEASURES REPAIR DAMAGED FACADE AS PER 1RCNY 103 #35730624K | Sep 4, 2026 POP/IN-VIO | $0 |
| Aug 12, 2025 | Construction CLASS - 1 FAILURE TO MAINTAIN BUILDING EXTERIOR WALL(S)OR APPURTENANCES.NOTE:AT THE TIME OF INSPECTION OBSERVED AT EXPO#1 AND 3 EAST AND WEST ELEVATION SPALLING MORTAR JOINT/DETERIORATING BRICK MASONRY AT SEVERAL LOCATIO #35718436L | Sep 5, 2025 POP/IN-VIO | $0 |
| Apr 30, 2025 | Construction CLASS - 1 FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT A DESIGNATED UNSAFE BLDG FACADE AS PER TECHNICAL REPORT#UNSAFE-1008819-10C-001.NOTE:AT TIME OF INSPECTION,I OBSERVED INADEQUATE SAFETY MEASURE #35693690Z | Jul 18, 2025 POP/IN-VIO | $0 |
| Apr 30, 2025 | Construction CLASS - 1 FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT A DESIGNATED UNSAFE BLDG FACADE AS PER TECHNICAL REPORT#UNSAFE-1008817-10A-001.NOTE:AT TIME OF INSPECTION,I OBSERVED AT EXP#2 NORTH,FACING DEWE #35693689L | Jul 18, 2025 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00638 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00639 | DOB VIOLATION - ACTIVE |
| Feb 22, 2024 | NO REPORT AND / OR LATE FILING (FACADE) FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 #00640 | DOB VIOLATION - ACTIVE |
| Jan 23, 2020 | FACADE SAFETY PROGRAM UNSAFE REPORT WAS FILED NYCHA #HAZ88882 | DOB VIOLATION - ACTIVE |
| Jan 23, 2020 | FACADE SAFETY PROGRAM #HAZ88616 | DOB VIOLATION - ACTIVE |
| Jan 22, 2020 | FACADE SAFETY PROGRAM #HAZ88609 | DOB VIOLATION - ACTIVE |
| Jul 1, 1992 | LOCAL LAW 10/80 - FACADE #NRF1044 | DOB VIOLATION - ACTIVE |
| Sep 25, 1990 | ELEVATOR 74 FILE B.N.& OBTAIN PERMIT FOR NEW INSTALLATION OF CONTROLLER OPERATOR & CAB AS PER N.Y.C.ADMIN.CODE-RS 18 #1450C3 | DOB VIOLATION - ACTIVE |
| Sep 25, 1990 | ELEVATOR 74 FILE BUILDING NOTICE AND OBTAIN PERMIT FOR INSTALLATION OF NWE CONTROLLER,OPERATOR,AND CAB AS PERN.Y.C.ADMIN.CODE RS18 #1450C1 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Feb 22, 2024 | Facades FISPNRF FAILED TO FILE FISP CYCLE 9C TECHNICAL REPORT BY 2/21/2024 | Active |
| Jan 23, 2020 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Jan 23, 2020 | Facades FISP UNSAFE REPORT WAS FILED NYCHA | Active |
| Jan 22, 2020 | Facades FISP CYCLE 8C UNSAFE REPORT FILED | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Jul 29, 2016 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE DOOR CASEING AT BUILDING ENTRANCE DOOR AT PUBLIC HALL, 1st STORY | Sep 2, 2016 |
| Jul 29, 2016 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT WEST WALL AT PUBLIC HALL, 1st STORY | Sep 2, 2016 |
| Jul 29, 2016 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WEST WALL AT PUBLIC HALL, 1st STORY | Nov 1, 2016 |
| Date | Source | What | Now |
|---|---|---|---|
| Aug 7, 2026 | ECB | Construction: FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES.NOTED:OBSERVED BROKEN WINDOW AT TOP FLOOR AT EXP 3(W.ELEV).REM:MAINTAIN EXTERIOR FACADE.TAKE SAFETY MEASURES REPAIR DAMAGED FACADE AS PER 1RCNY 103 | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)