5 floors · 20 apartments · 18,500 sq ft · built 1912 · class C6 · owner of record: 274 East 194 St Hdfc #
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2025-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 45 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 45 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 61 days | Annual |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1141 days | Next cycle year 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-02 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 13, 2025 | Construction CLASS - 3 ACCESS WAS DENIED BY THE SUPERINTENDENT. ACCESS TO THE HEATING SYSTEM SHALL BE READILY PROVIDED TO THE DEPARTMENT AS PER HMC 27-2033 /CORRECT ALL VIOLATING CONDITION/SUBMIT CERTIFICATE OF CORRECTION; 27-MISC,28 #39151001N | Aug 29, 2025 DEFAULT | $500 |
| May 2, 2023 | Boilers CLASS - 2 NO COLD COIL RELIEF VALVE EXPOSED WIRING, DEFECTIVE BACK FLOW PREVENTER #39085175K | Jul 7, 2023 DEFAULT | $3,125 |
None open.
None open.
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Nov 17, 2025 | I | §27-2107 ADM CODE OWNER FAILED TO FILE A VALID REGISTRATION STATEMENT WITH THE DEPARTMENT AS REQUIRED BY ADM CODE §27-2097 AND IS THEREFORE SUBJECT TO CIVIL PENALTIES, PROHIBITED FROM CERTIFYING VIOLATIONS, AND DENIED THE RIGHT TO RECOVER POSSESSION OF PREMISES FOR NONPAYMENT OF RENT UNTIL A VALID R | — |
| Aug 31, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 2nd STORY | Dec 4, 2026 |
| Aug 31, 2026 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ITS ASSEMBLIES AT FIRE DOOR LEADING TO SOUTH YARD AT PUBLIC HALL, 1st STORY | Oct 5, 2026 |
| Aug 31, 2026 | B | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AN | Oct 5, 2026 |
| Aug 31, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT SOUTH WALL INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 2nd STORY | Oct 5, 2026 |
| Jun 12, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORY | Jul 17, 2026 |
| Jun 12, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH, SOUTH, AND WEST WALLS AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Sep 15, 2026 |
| Jun 12, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORY | Sep 15, 2026 |
| Jun 12, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Jul 17, 2026 |
| May 26, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEAILING AND NORTH WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Aug 29, 2026 |
| May 26, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK CEILING AND NORTH WALL, AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Jun 30, 2026 |
| May 26, 2026 | B | Apt 51 · § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT EAST WALL IN THE BATHROOM LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | B | Apt 51 · § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS . IN THE BATHROOM LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | B | Apt 51 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BASE CABNEITS IN THE BATHROOM LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 30, 2026 |
| May 26, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Aug 29, 2026 |
| May 26, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIALS AT CEILING AND WEST WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Jun 30, 2026 |
| May 26, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AND AND WEAT WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Jun 30, 2026 |
| May 26, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIALS AT CEILING AND NORTH WALL AT 1st PUBLIC HALL BULKHEAD FROM NORTH, 5th STORY | Jun 30, 2026 |
| Apr 30, 2026 | B | Apt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 4, 2026 |
| Apr 30, 2026 | B | Apt 51 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE WASHBASIN CABINET IN THE BATHROOM LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Jun 4, 2026 |
| Apr 30, 2026 | A | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS. | Aug 3, 2026 |
| Apr 30, 2026 | B | Apt 32 · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE ENTIRE APARTMENT LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 4, 2026 |
| Apr 30, 2026 | B | Apt 32 · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE BATHROOM LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 4, 2026 |
| Apr 30, 2026 | B | Apt 32 · § 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON MONOXIDE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH APPLICABLE LAW AND RULES MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 4, 2026 |
| Apr 30, 2026 | B | Apt 32 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 32, 3rd STORY, 1st APARTMENT FROM WEST AT NORTH | Jun 4, 2026 |
| Apr 30, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORY | Jun 4, 2026 |
| Apr 30, 2026 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORY | Aug 3, 2026 |
| Apr 30, 2026 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING AT PUBLIC HALL, 5th STORY | Jun 4, 2026 |
| Apr 14, 2026 | B | Apt 41 · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ.FT AT CEILING IN THE BATHROOM LOCATED AT APT 41, 4th STORY, 1st APARTMENT FROM NORTH AT EAST ORIGINAL VIOLATION 18503868 ISSUED 13-DEC-25 HAS BEEN UPGRADED TO CLASS B PER ADMINISTRATIVE CODE 27-2017. | May 19, 2026 |
| Mar 5, 2026 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE VERTICAL CRACK (BRICK AND MOTAR) AT WEST EXTERIOR WALL (NEAR PARAPIT WALL) | Apr 9, 2026 |
| Mar 2, 2026 | A | § 53, 187, 231 M/D LAW AND DEPARTMENT RULES AND REGULATIONS. PROVIDE A SHOE PROPERLY SECURED TO BOTTOM OF STRING OF DROPLADDER (SHOE) USING APPROPRIATE NUTS AND BOLTS AT EAST EXTERIOR WALL AT FIRE ESCAPE | Jun 5, 2026 |
| Mar 2, 2026 | C | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AT PUBLIC HALL, 5th STORY | Mar 8, 2026 |
| Jan 9, 2026 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR DEFECTIVE AT PUBLIC HALL, 1st STORY | Apr 14, 2026 |
| Dec 31, 2025 | C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING AT BATHROOM | Jan 24, 2026 |
| Dec 31, 2025 | C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING AT BATHROOM | Jan 24, 2026 |
| Dec 30, 2025 | C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING AT 1st ROOM FROM EAST AT NORTH | Jan 23, 2026 |
| Dec 30, 2025 | C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING AT KITCHEN | Jan 23, 2026 |
| Dec 30, 2025 | C | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED SUBSURFACE USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) CEILING AT 1st ROOM FROM EAST AT SOUTH | Jan 23, 2026 |
| Dec 15, 2025 | C | Apt 41 · § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES IN THE ENTRANCE LOCATED AT APT 41, 4th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 29, 2025 |
| Dec 15, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Dec 21, 2025 |
| Dec 12, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM DOOR LOCKED | Dec 18, 2025 |
| Dec 12, 2025 | C | Apt 2 · § 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 12, 2025 |
| Dec 12, 2025 | C | Apt 2 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Dec 12, 2025 |
| Dec 11, 2025 | C | Apt 51 · § 27-2029 ADM CODE PROVIDE AN ADEQUATE SUPPLY OF HEAT FOR THE APARTMENT IN THE ENTIRE APARTMENT LOCATED AT APT 51, 5th STORY, 1st APARTMENT FROM NORTH AT EAST | Dec 11, 2025 |
| Dec 11, 2025 | B | Apt 2 · § 27-2005, 2007 ADM CODE FIRE EGRESS DEFECTIVE. REMOVE OBSTRUCTING BARS OR UNLAWFUL GATES FROM AT LEAST 1 WINDOW OR PROVIDE APPROVED TYPE GATE , IN THE ENTIRE APARTMENT LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Jan 15, 2026 |
| Dec 11, 2025 | C | § 27-2033 ADM CODE PROVIDE READY ACCESS TO BUILDINGS HEATING SYSTEM LOCKED DOOR AT BOILER ROOM | Dec 17, 2025 |
| Oct 3, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING AT 1st PUBLIC HALL BULKHEAD FROM NORTH | Nov 7, 2025 |
| Oct 3, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND ALL WALLS AT 1st PUBLIC HALL BULKHEAD FROM NORTH | Jan 6, 2026 |
| Oct 3, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORY | Nov 7, 2025 |
| Oct 3, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORY | Jan 6, 2026 |
| Oct 3, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK BEHIND NORTH WALL AT PUBLIC HALL, 5th STORY | Nov 7, 2025 |
| Oct 3, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDENT MATERIAL AT CEILING AND ALL WALLS AT 1st PUBLIC HALL BULKHEAD FROM NORTH | Nov 7, 2025 |
| Oct 3, 2025 | B | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE CEILING AT PUBLIC HALL, 5th STORY | Nov 7, 2025 |
| Aug 14, 2025 | A | Apt 2 · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE CERAMIC TILE AT SOUTH WALL IN THE BATHROOM LOCATED AT APT 2, 1st STORY, 2nd APARTMENT FROM SOUTH AT WEST | Nov 17, 2025 |
| Jun 11, 2025 | B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH AND ASSEMBLY AT FIRE DOOR LEADING TO SOUTH YARD. AT PUBLIC HALL, 1st STORY | Jul 16, 2025 |
| Jun 11, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING, WEST AND SOUTH WALL AT 1st PUBLIC HALL BULKHEAD FROM EAST | Jul 16, 2025 |
| Jun 11, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING, WEST AND SOUTH WALLS AT 1st PUBLIC HALL BULKHEAD FROM EAST | Sep 14, 2025 |
| Jun 11, 2025 | B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIAL AT CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORY | Jul 16, 2025 |
| Jun 11, 2025 | A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL AT PUBLIC HALL, 5th STORY | Sep 14, 2025 |
| Jun 11, 2025 | A | § 329, M/D LAW AND DEPT. RULES AND REGS. PROVIDE A COMPLETED CERTIFICATE OF INSPECTION VISITS IN A PROPER FRAME AT OR NEAR MAILBOXES, BOTTOM EDGE OF FRAME BETWEEN 48-62 INCHES ABOVE FLOOR IMPROPERLY MOUNTED (TOO HIGH) AT PUBLIC HALL, 1st STORY | Sep 14, 2025 |
Showing 60 of 79. Full list on the agency site.
| Date | Source | What | Now |
|---|---|---|---|
| Aug 31, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE LATCH AT FIRE DOOR LEADING TO SOUTH YARD AT PUBLIC HALL, 1st STORY | Closed |
| Aug 31, 2026 | HPD A | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT SOUTH WALL AT INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 2nd STORY | Open |
| Aug 31, 2026 | HPD B | § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AND ITS ASSEMBLIES AT FIRE DOOR LEADING TO SOUTH YARD AT PUBLIC HALL, 1st STORY | Open |
| Aug 31, 2026 | HPD B | 28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEEN THE TOP AND SIDE EDGES OF DOOR AND DOOR JAMB EXCEEDING THE MAXIMUM ALLOWABLE CLEARANCE OF 1/8 OF AN INCH AND MAXIMUM ALLOWABLE CLEARANCE OF 3/4 OF AN INCH BETWEEN THE DOOR BOTTOM AN | Open |
| Aug 31, 2026 | HPD B | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT MATERIALS AT SOUTH WALL INTERMEDIATE LANDING AT PUBLIC HALL STAIRS, 2nd STORY | Open |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 16, 2026, 5:35 PM ET. BBL 2032930052.