| Annual property registration Check HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Sep 1, 2027 in 309 days | Required only if the owner doesn't live there |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Nov 17, 2025 | Construction CLASS - 1 AT THE TIME OF INSPECTION, WORKERS WERE OBSERVED ACTIVELY PERFORMING DEMOLITION WORK WHILE A PSWO IS IN EFFECT. NO CONSTRUCTION FENCE WAS MAINTAINED AT EXPOSURE 2. BRICK FACADE AT EXPOSURE 2 HAD BEEN REMOVED AN #39547043M | Mar 18, 2026 IN VIOLATION | $10,000 |
| Nov 17, 2025 | Unknown CLASS - 2 AT THE TIME OF INSPECTION, ACTIVE DEMOLITION WORK WAS UNDERWAY WITH NO WINDOW PROTECTION PROVIDED AT EXPOSURE 2 FOR THE ADJACENT PROPERTY. THIS CONDITION POSES A HAZARD AND DANGER. STOP ALL WORK IMMEDIATELY AND #39547039J | Oct 19, 2026 IN VIOLATION | $2,500 |
| Nov 17, 2025 | Construction CLASS - 2 AT THE TIME OF INSPECTION, NO FENCE OR PROTECTION WAS PROVIDED AT EXPOSURE 2 TO SAFEGUARD THE ADJACENT PROPERTY WHILE ACTIVE DEMOLITION WAS BEING PERFORMED. THIS CONDITION POSES A HAZARD TO SAFETY AND THE PUBLI #39547037X | Oct 19, 2026 IN VIOLATION | $5,000 |
| Nov 17, 2025 | Construction CLASS - 1 AT THE TIME OF INSPECTION, POOR HOUSEKEEPING WAS OBSERVED THROUGHOUT THE SITE, CREATING TRIPPING AND SLIPPING HAZARDS DUE TO DEBRIS SCATTERED IN WORK AREAS. NO SAFE OR CLEAR PASSAGE WAS PROVIDED FOR WORKERS. ST #39547038H | Mar 16, 2026 IN VIOLATION | $2,500 |
| Nov 16, 2025 | Construction CLASS - 1 FAILURE TO SAFEGUARD PUBLIC AND PROPERTY AT TIME OF INSPECTION FULL DEMOLITION OF ONE STORY BUILDING WITH NO PROTECTION FOR ADJACENT PROPERTY IN PLACE. DEBRIS FALLING IN ADJACENT PROPERTY SIDE ALLEY AND REAR YA #39167164Y | Jan 6, 2027 | $10,000 |
| Jul 19, 2025 | Construction CLASS - 2 FAILURE TO SAFEGUARD THE PUBLIC AND PROPERTY. AT TIME OF INSPECTION, CONTRACTOR IS PERFORMING DEMOLITION WORK AND FAILED TO PROVIDE OVERHEAD PROTECTION FOR ADJACENT PROPERTY. DEBRIS IS FALLING BETWEEN ADJACENT #39154259Y | Jun 7, 2027 | $5,000 |
| Jul 10, 2025 | Construction CLASS - 2 AT THE TIME OF MY INSPECTION OF A 1 STORY BUILDING PERMITTED FOR FULL DEMOLITION, I OBSERVED NO DEMOLITION ACTIVITIES, NO WORKERS AT JOBSITE, PERIMETER WAS SURROUNDING WITH CONSTRUCTION FENCE BUT THE GATE LEFT #39542222P | Nov 19, 2025 IN VIOLATION | $1,000 |
| Feb 5, 2024 | Construction CLASS - 2 WORK WITHOUT PERMIT : AT TIME OF INSPECTION OBSERVED AT EXPOSURE 3 (REAR), AN EXTENSION APPROXIMATELY 6' X 6' X 8'W WITH A DOOR ERECTED AND ATTACHED TO BOTH BUILDINGS, THE HOUSE AND THE STRUCTURE ( ENCLOSED WIT #39105229M | May 19, 2025 DEFAULT | $0 |
| Oct 7, 2006 | Construction Hazardous FAILURE TO MAINTAIN. DEFECT NOTED: APPROX 1/2" TO 1" CRACKS AT EAST BLOCK FACADE ADJ TO PARKING LOT AT REAR OF LOT (NORTH) REMEDY: REPAIR DEFECT NOTED.OBTAIN PERMITS IF APPLICABLE. #34543228Z | Aug 20, 2007 WRITTEN OFF | $0 |
| May 24, 2006 | Construction Hazardous FAILURE TO MAINTAIN EXTERIOR BLDG WALL-HAZARDOUS.DEFECT NOTED:VERTICAL/HORIZONTAL CRACKS APPROX 1/4"WIDE X 5FEET LONG AT VARIOUS LOCATIONS OF EXTERIOR BRICK WALL AT 1 STORY BRICK STRUCTURE (REAR OF PROPERTY LOT #34522777Z | Jul 10, 2006 IN VIOLATION | $0 |
None open.