Bronx · Block 3380 · Lot 56 · 10470

273 East 239 Street

4 floors · 49 apartments · 52,652 sq ft · built 1931 · class C1 · owner of record: Turner Operating Llc

39open violations
$0ECB/OATH penalties owed
6HPD class C (immediately hazardous)
47dto Bedbug annual filing

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 47 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 47 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 63 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 52,652 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 168 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 168 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 291 days
Registered through 2027-09-01
Gas piping inspection (2027 cycle) Likely applies
Local Law 152 · During 2027
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 12 is on the 2027 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2027
in 412 days
Next cycle year 2027
Energy audit and retro-commissioning (2030) Likely applies
Local Law 87 · Calendar year 2030
What this is

Buildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3380). Agency page

Dec 31, 2030
in 1508 days
Next due 2030
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-27 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (0)

None open.

DOB (1)
IssuedViolationStatus
Jun 20, 2023LOW PRESSURE BOILER
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
#16452
DOB VIOLATION - ACTIVE
DOB NOW Safety (2)
IssuedViolationStatus
Mar 6, 2026Energy Grade - LL33 FTP-EN-EGRDEA
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER AD CODE SEC. 28-309.12.3
Active
Jun 20, 2023Boiler LBLVIO
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Active
HPD (36) · C 6 · B 29 · A 1
IssuedClassViolationCorrect by
May 4, 2026BApt 1C · § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOCATED AT APT 1C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 8, 2026
May 4, 2026AApt 1C · § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE KITCHEN , THE 1st ROOM FROM NORTH, THE 3rd ROOM FROM NORTH, THE BATHROOM LOCATED AT APT 1C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHAug 7, 2026
May 4, 2026BApt 1C · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING AND SOUTH WALL IN THE BATHROOM LOCATED AT APT 1C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTHJun 8, 2026
Jun 5, 2025CApt 1B · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AJun 29, 2025
Apr 28, 2025BApt C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT C, 1st STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''2Jun 2, 2025
Apr 28, 2025BApt 1C · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1C, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH , SECTION ''Jun 2, 2025
Apr 28, 2025CApt B · § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED SUBSURFACE - USING WORK PRACTICES SET FORTH IN 28 RCNY §11-06(B)(2) 1st DOOR FROM WEST AT NORTH WALL, 1st DOOR FRAME FROM WEST AT NORTH WALL IN THE FOYER Jun 5, 2025
Apr 28, 2025BApt 1D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1D, 2nd STORY, 2nd APARTMENT FROM WEST AT NORTH , SECTION ''Jun 2, 2025
Apr 28, 2025BApt G · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT G, 1st STORY, 1st APARTMENT FROM NORTH AT EAST , SECTION ''2Jun 2, 2025
Apr 14, 2025BApt 2B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2B, 3rd STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 19, 2025
Apr 14, 2025BApt A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT A, 1st STORY, 1st APARTMENT FROM EAST AT SOUTHMay 19, 2025
Apr 14, 2025BApt 2A · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2A, 3rd STORY, 1st APARTMENT FROM EAST AT SOUTHMay 19, 2025
Apr 14, 2025BApt B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT B, 1st STORY, 2nd APARTMENT FROM EAST AT SOUTH , SECTION ''2Jun 2, 2025
Apr 14, 2025BApt 2D · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2D, 3rd STORY, 2nd APARTMENT FROM WEST AT NORTHMay 19, 2025
Apr 14, 2025BApt 2E · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 2E, 3rd STORY, 1st APARTMENT FROM NORTH AT EASTMay 19, 2025
Apr 14, 2025BApt 3B · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3B, 4th STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 19, 2025
Apr 14, 2025BApt 1F · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 1F, 2nd STORY, 2nd APARTMENT FROM EAST AT SOUTHMay 19, 2025
Apr 14, 2025BApt 3K · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTHMay 19, 2025
Apr 14, 2025BApt 3L · § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY SUBMITTING REQUIRED SUPPORTING DOCUMENTATION AND AFFIDAVITS FOR APARTMENT LOCATED AT APT 3L, 4th STORY, 1st APARTMENT FROM SOUTH AT WESTMay 19, 2025
Apr 4, 2025C§ 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO BE MAINTAINED BY OWNER PURSUANT TO LOCAL LAW 1 OF 2004 RELATED TO LEAD-BASED PAINT NOTICES, INSPECTIONS AND REMEDIATION/ABATEMENT ACTIVITIES.Apr 8, 2025
Apr 4, 2025C§ 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS.Apr 8, 2025
Sep 3, 2024CApt C · § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACANCY BY PERFORMING ACTIVITIES NECESSARY TO ABATE TESTED LEAD-BASED PAINT FROM REQUIRED WINDOW AND/OR DOOR FRICTION SURFACES FOR APARTMENT AND MAKE FLOORS SMOOTH AOct 11, 2024
Apr 17, 2024BApt 3K · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''May 22, 2024
Apr 17, 2024BApt 3K · § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CLOSET EAST WALL APPROX. 12 SQ FT. IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''May 22, 2024
Apr 17, 2024BApt 3K · § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''May 22, 2024
Apr 17, 2024BApt 3K · § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''May 22, 2024
Apr 17, 2024BApt 3K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''May 22, 2024
Apr 17, 2024BApt 3K · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''May 22, 2024
Apr 17, 2024BApt 3K · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST, SOUTH WALLS AND EAST CLOSET WALL IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''May 22, 2024
Apr 17, 2024CApt 3K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE MORTISE DOOR LOCK AND ASSEMBLEY IN THE ENTRANCE LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''Apr 23, 2024
Apr 17, 2024BApt 3K · § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE BELL AND BUZZER/RETURN INTERCOM SYSTEM FROM BUILDING VESTIBULE TO APT BELL PANEL IN THE PRIVATE HALLWAY LOCATED AT APT 3K, 4th STORY, 1st APARTMENT FROM EAST AT SOUTH , SECTION ''EAST''May 22, 2024
Jun 5, 2014BApt 3L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''BLDG 277'', AT EASTJul 10, 2014
Jun 5, 2014BApt 3L · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''BLDG 277'', AT EASTJul 10, 2014
Jun 5, 2014BApt 3L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''BLDG 277'', AT EASTJul 10, 2014
Jun 5, 2014BApt 3L · § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''BLDG 277'', AT EASTJul 10, 2014
Jun 5, 2014BApt 3L · § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 2nd ROOM FROM EAST AT SOUTH LOCATED AT APT 3L, 4th STORY, 1st APARTMENT FROM SOUTH AT WEST , SECTION ''BLDG 277'', AT EASTJul 10, 2014

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 14, 2026, 10:09 AM ET. BBL 2033800056.

Look up another building