Bronx · Block 3253 · Lot 23 · 10463

2704 Kingsbridge Terrace

5 floors · 41 apartments · 42,000 sq ft · built 1926 · class C1 · owner of record: Kingsbridge Apt Corp

6open violations
$1,250ECB/OATH penalties owed
0HPD class C (immediately hazardous)
50dto Gas piping inspection (2026 cycle)

Get an email when anything changes here

New violations the morning after they're issued, plus deadline reminders. Free for one building.

Compliance deadlines

RequirementDueStatus
Gas piping inspection (2026 cycle) Likely applies
Local Law 152 · During 2026
What this is

Buildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 8 is on the 2026 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page

Dec 31, 2026
in 50 days
Due this year
Annual parapet observation Check
Local Law 126 · By December 31 each year
What this is

If the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page

Dec 31, 2026
in 50 days
Keep the report on file (not filed with DOB)
Bedbug annual filing Applies
Local Law 69 · December 1 to 31 each year
What this is

Owners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page

Dec 31, 2026
in 50 days
Annual
Annual notice: window guards and lead paint Applies
HPD / Health Code · January 1 to 16 each year
What this is

Deliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page

Jan 16, 2027
in 66 days
Annual
Energy and water benchmarking Likely applies
Local Law 84 · May 1 each year
What this is

Buildings over 25,000 sq ft (this lot shows 42,000 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page

May 1, 2027
in 171 days
Annual filing
Building emissions report Likely applies
Local Law 97 · May 1 each year (extensions available)
What this is

Covered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page

May 1, 2027
in 171 days
Annual filing
Annual property registration Applies
HPD registration · September 1 each year
What this is

Residential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page

Sep 1, 2027
in 294 days
Registered through 2027-09-01
Annual boiler inspection (1 boiler) Applies
Boiler inspection · By December 31 each year
What this is

Boilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-02-26 (Accepted). Agency page

On file2026 reports accepted

Open violations

ECB / OATH (2) · $1,250 owed
IssuedViolationHearingBalance
May 21, 2026Construction CLASS - 2
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS. AT TIMES OF INSPECTION, OBSERVED VIOLATING CONDITIONS HAVE BEEN CORRECTED. JOB PERMITTED UND
#39189586L
Aug 21, 2026
IN VIOLATION
$1,250
Oct 11, 2023Construction CLASS - 1
FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER IN DOB VIOLATION VIO23-02181, DATED 7/28/2023. RESPONDENT WAS REQUIRED TO SUBMIT AN ENGINEER'S REPORT CONCERNING STRUCTURALLY DEFICIENT CONDITIONS. AS OF 10/11/20
#37025470X
Mar 1, 2024
IN VIOLATION
$0
DOB (4)
IssuedViolationStatus
Aug 13, 2025CONSTRUCTION
UNLAWFUL ACTS. FAILURE TO COMPLY WITH A COMMISSIONER'S ORDER CONDITION 071125CRW20801BH ISSUED ON JULY 11, 2025. UP TO TODAY'S DATE, NO PERMITS HAVE BEEN OBTAINED TO CONSTRUCT THE NEW RETAINING WALL REMEDY: IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 071125CRW20801BH ISSUED TO JULY 11, 2025
#RW20802BH
DOB VIOLATION - ACTIVE
Jul 11, 2025CONSTRUCTION
FAILURE TO MAINTAIN RW IN SAFE CONDITION. RW AT REAR OF PROPERTY HAS BEEN DEMOLISHED IN ACCORDANCE WITH PREVIOUSLY ISSUED DOB EWO AS DIRECT BY DOB. EWO HAS TO BE IMMEDIATELY FOLLOWED BY PERMANENT CONSTRUCTION OF RW. REMEDY: IMMEDIATELY RETAIN LIC P.E. & ENDORSED CONRACTOR A DESIGN & CONSTRUCTION OF
#RW20801BH
DOB VIOLATION - ACTIVE
Nov 1, 2024CONSTRUCTION
PARTIAL VACATE ORDER OF REAR YARD. REAR RETAINING WALL OF PROPERTY BORDERING WITH 2747 SEDGWICK AVENUE IS STRUCTURALLY UNSTABLE & MAY COLLAPSE ON THE EMERG EGRESS PATHWAY. REMEDY:IMMEDIATE VACATE ENTIRE REAR YARD. PROVIDE 2 FIREGUARDS AS PER DOB ORDERS: NYC DEPARTMENT OF BUILDINGS, 280 BROADWAY,4FL,
#RW20801BH
DOB VIOLATION - ACTIVE
Jul 28, 2023CONSTRUCTION
OBSERVED ENTIRE LENGTH OF ROOF PARAPET WALL INSTATE OF DISREPAIR CONDITIONS ON FRONT FACADE AT EXPOSURE # 01 INCLUDING'S 2-COURSES HEADER BRICKS APPROX. 6'-0" MISSING ON 6TH FLOOR WINDOW LINTEL, ENTIRE FRONT PARAPET LEANING INWARD, STEP CRACKS & LOOSE BRICKS AT THE CORNER OF EXPO # 01 & 02.
#23-02181
DOB VIOLATION - ACTIVE
DOB NOW Safety (0)

None open.

HPD (0)

None open.

Check the agency records

Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)

City records as of Nov 11, 2026, 3:31 AM ET. BBL 2032530023.

Look up another building