3 floors · 170,970 sq ft · built 1951 · class W1 · owner of record: Nyc Department Of Parks And Recreation
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 67 days | Keep the report on file (not filed with DOB) |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 170,970 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 188 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 188 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 7 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1163 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3239). Agency page | Dec 31, 2029 in 1163 days | Next due 2029 |
| Annual boiler inspection (2 boilers) Applies Boiler inspection · By December 31 each year What this isBoilers are inspected each calendar year and the report is filed in DOB NOW: Safety within 14 days of the inspection (low-pressure boilers in residential buildings of 5 or fewer families are exempt). Latest report on record: 2026-04-07 (Accepted). Agency page | On file | 2026 reports accepted |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Jun 15, 2026 | Construction CLASS - 2 REISSUE ON ECB#35676447Y EXIT DOOR NOT SELF-CLOSING.NOTED:EMERGENCY EXTERIOR EXIT DOORS NOT SELF-CLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON EXTERIOR DOOR AT EXIT 8 1ST FLOOR AND EXTERIOR DOOR AT E #35734238K | Jul 10, 2026 POP/IN-VIO | $0 |
| Jun 15, 2026 | Construction CLASS - 2 REISSUE ON ECB#35721409N FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING DUE TO MISSING AND OR FAULTY HARDWARE OR BINDING ON CLASSROOMS 313,320 #35734236R | Jul 10, 2026 POP/IN-VIO | $0 |
| Jun 15, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:ILLUMINATION FOR EXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381NOTED:EMERGENCY ILLUMINATED DISCHARGE EXIT LIGHTS NOT WORKING WHEN TES #35734240J | Jul 10, 2026 POP/IN-VIO | $0 |
| Jun 15, 2026 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.ILLUMINATION FOREXITS,EXIT DISCHARGES AND PUBLIC CORRIDORS PER BC 1006.1;27-381.NOTED:EMERGENCY ILLUMINATED EXIT DISCHARGES AND EXIT SIGNS NOT WORKING WHEN #35734237Z | Jul 10, 2026 POP/IN-VIO | $0 |
| Jun 15, 2026 | Construction CLASS - 2 REISSUE ON ECB#35692316Y FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED:FIRE RATED CLASSROOMS AND SMOKE DOORS NOT SELF-CLOSING DUE TO BINDING,MISSING AND OR FAULTY HARDWARE ON CLASSROOMS MS06D,MS-0 #35734239M | Jul 10, 2026 POP/IN-VIO | $0 |
| Jul 23, 2025 | Construction CLASS - 2 FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. LACK OF EMERGENCY LIGHTS @ MINI SCHOOL THROUGHOUT. REMEDY: COMPLY WITH CODE. #35721410K | Aug 22, 2025 PENDING | $1,250 |
| Jul 23, 2025 | Construction CLASS - 2 REISSUE: 35692312R-FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER: FIRE DOORS AT 3RD FLOOR STAIR B, RM 305, 308, 205, 210, 1ST FLOOR STAIR A, D, AUDITORIUM REAR, EXIT 9 AND 10. EXIT DOORS AT EXIT #1, 7, #35721409N | Aug 22, 2025 PENDING | $3,125 |
| Oct 10, 2024 | Construction CLASS - 2 REISSUE #35676449H. FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER. NOTED AT MINI SCHOOL-X822 INTERIOR FPSC DOORS NOT CLOSING PROPERLY AT RM-M51, M53, KM51, SMOKE DOORS BY M53, MAIN ENTRANCE AND BY SECUR #35692316Y | Nov 1, 2024 POP/IN-VIO | $0 |
| Oct 10, 2024 | Construction CLASS - 2 REISSUE#35676444Z FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER.NOTED INTERIOR FPSC DOORS NOT CLOSING PROPERLY AT 3RD FL STAIR B & ACORRIDOR SMOKE DOOR BY CORRIDOR SMOKE BY RM 205 AND RM 210.BASEMENT AU #35692312R | Dec 20, 2024 POP/IN-VIO | $0 |
| Jul 21, 2023 | Construction CLASS - 2 FAILURE TO MAINTAIN BLDG IN CODE COIMPLIANT MANNER. NOTED: THE DOORS AT RM M51, M53, CORRIDOR BY THE MIDDLE AND SMOKE BY M53 ARE NOT WORKING PROPERLY. REMEDY: REPAIR AND/OR REPLACE. #35676449H | Oct 20, 2023 POP/IN-VIO | $0 |
| Jul 21, 2023 | Construction CLASS - 2 EXIT DOOR NOT SELF CLOSING. NOTED: THE EXTERIOR DOORS AT EXIT 1, 7, 9, 10 AND GYMNASIUM ARE NOT WORKING PROPERLY. REMEDY: REPAIR/ REPLACE DOOR #35676447Y | Oct 20, 2023 POP/IN-VIO | $0 |
| Jul 21, 2023 | Construction CLASS - 2 REISSUE#35584509M NOTED: AT 3RD FL STAIR B, CORRIDORBY 305, RM 308, STAIR A, 2ND FL CORRIDOR BY 205, ROOM210, 1ST FL STAIR A, D, AUDITORIUM REAR RIGHT AND STAGE RIGHT AND SMOKE BY EXIT 9 AND 10, THE DOORS ARE N #35676444Z | Oct 20, 2023 POP/IN-VIO | $0 |
| Jul 27, 2021 | Construction CLASS - 2 REISSUE#35473219M DATE OF ISSUE 6-02-2020 EXIT DOOR NOT SELF CLOSING PROPERLY. AT 3RD FL CORRIDOR EXIT DOOR NEAR ROOM #306 2 CORRIDOR EXIT DOOR NOT SELF CLOSING PROPERLY. AT THE TIME OF INSPECTION. REMEDY: REPA #35584509M | Oct 29, 2021 POP/IN-VIO | $0 |
| Jun 2, 2020 | Construction CLASS - 2 REISSUE#35433966J EXIT DOOR NOT SELF CLOSING. NOTE: DURING INSPECTION OBSERVED AT 3RD FL ROOM 306 DOOR IS NOT SELF CLOSING W/TESTED. REMEDY:REPAIR/REPLACE DOOR. #35473219M | Oct 2, 2020 POP/IN-VIO | $0 |
| Jul 1, 2019 | Construction CLASS - 2 RE-ISSUE #35331986J.DATE OF ISSUE 5/11/18. EXIT DOOR NOT SELF-CLOSING,AND NEEDS CLOSERS.THE FOLLOWING LOCATIONS,3RD FL.,ROOM #306,DOOR NOT SELF-CLOSING PROPERLY AT THE TIME OF INSPECTION WHEN TESTED.REM:REPAIR/ #35433966J | Sep 6, 2019 POP/IN-VIO | $0 |
| May 11, 2018 | Construction CLASS - 2 EXIT DOOR NOT SELF CLOSING. NOTE DOORS NOT SELF CLOSING AND NEED CLOS ERS AT THE FOLLOWING LOCATIONS 3RD FLOOR EXIT #3 AND CORRIDOR DOORS BYROOM 306, 2ND FLOOR EXIT #2,7,9 AND 10, 1ST FLOOR EXIT #8 AUDITORIUM #35331986J | Jul 20, 2018 POP/IN-VIO | $0 |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07776 | DOB VIOLATION - ACTIVE |
| Nov 14, 2025 | LOW PRESSURE BOILER VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION #07775 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Nov 14, 2025 | Boiler LBLVIO VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 7) | Active |
| Oct 25, 2024 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2023 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2022 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2019 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2018 External Inspection Affirmation of Correction for LP Device | Active |
| Nov 14, 2023 | Boiler FTC-BE-EXT-LP Violation Issued-Failure To File 2021 External Inspection Affirmation of Correction for LP Device | Active |
None open.
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Oct 25, 2026, 7:17 AM ET. BBL 2032390041.