14 floors · 233 apartments · 244,506 sq ft · built 2023 · class D6 · owner of record: 2700 Atlantic Ground Lessor Llc
New violations the morning after they're issued, plus deadline reminders. Free for one building.
| Requirement | Due | Status |
|---|---|---|
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | Registration expired 2026-09-01 |
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 59 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 59 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 75 days | Annual |
| Facade inspection report (Cycle 10A) Applies Local Law 11 / FISP · Feb 21, 2025 to Feb 21, 2027 What this isBuildings taller than six stories file a facade inspection report by a QEWI once every five-year cycle. Tax blocks ending in 4, 5, 6 or 9 are in sub-cycle 10A. Agency page | Feb 21, 2027 in 111 days | No Cycle 10 report on record yet |
| Energy and water benchmarking Likely applies Local Law 84 · May 1 each year What this isBuildings over 25,000 sq ft (this lot shows 244,506 sq ft) report energy and water use for the prior calendar year through ENERGY STAR Portfolio Manager. The city's Covered Buildings List is the final word on which buildings must file. Agency page | May 1, 2027 in 180 days | Annual filing |
| Building emissions report Likely applies Local Law 97 · May 1 each year (extensions available) What this isCovered buildings file an annual greenhouse gas emissions report certified by a registered design professional. Buildings over their emissions limit owe penalties, so it pays to check early. Agency page | May 1, 2027 in 180 days | Annual filing |
| Gas piping inspection (2029 cycle) Likely applies Local Law 152 · During 2029 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 5 is on the 2029 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2029 in 1155 days | Next cycle year 2029 |
| Energy audit and retro-commissioning (2029) Likely applies Local Law 87 · Calendar year 2029 What this isBuildings over 50,000 sq ft file an Energy Efficiency Report every ten years, in the year whose last digit matches the last digit of the tax block (block 3689). Agency page | Dec 31, 2029 in 1155 days | Next due 2029 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| Aug 8, 2024 | Construction CLASS - 2 AT TIME OF INSPECTION SITE CLOSE. OBSERVED NO CONSTRUCTION ACTIVITY. WORK IS SUBSTANTIALLY COMPLETED. RESPONDENT FAILED TO FILE FOR CERTIFICATE OF CORRECTIONS FOR VIOLATION#039529576X ISSUED ON 6/13/2024 FOR NO #39531212H | Apr 5, 2027 | $1,250 |
| Jun 13, 2024 | Unknown CLASS - 1 BC 3303.3 AT THE TIME OF MY INSPECTION OF A 14 STORY BUILDING APPROXIMATELY 157,936 SQUARE FEET. SITE CLOSE AND THERE WERE NO CONSTRUCTION ACTIVITIES. UPON SHOUTING AT THE PERIMETER AND BANGING ON THE ENTRANCE #39529576X | Apr 5, 2027 | $5,000 |
| Jun 13, 2024 | Unknown CLASS - 1 BC 3307.2.1 AT THE TIME OF MY INSPECTION OF A 14 STORY NEW BUILDING TOP OFF, I OBSERVED SCISSORS LIFT ON SIDEWALK AT EXPOSURE #4 NOT FULLY BARRICADE AND OBSTRUCTING SIDEWALK, THIS CREATES A HAZARDOUS CONDITION #39529575Y | Apr 5, 2027 | $5,000 |
| Jun 13, 2024 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 14 STORY NEW BUILDING TOP OFF, I OBSERVED NO CONSTRUCTION ACTIVITIES AND AT EXPOSURE #2 A VENTILATION PIT APPROXIMATELY 10 FEET DEEP AND THE GUARDRAILS AROUND WAS MISSING TOE B #39529577H | Apr 5, 2027 | $5,000 |
| Jun 7, 2024 | Construction CLASS - 1 RESPONDING AN INCIDENT, WHERE WORKER GERARDO FALCON FELL OFF FROM STILTS WHEN DOING COMPOUND ON CEILING INSPECTION REVEALED: GC FAILURE TO INSTITUTE AND MAINTAIN SAFETY MEASURES, WORK CONTRARY TO SPECS. INADEQU #39529415P | Feb 10, 2026 IN VIOLATION | $1,250 |
| Apr 6, 2024 | Construction CLASS - 2 DURING MY INSPECTION OF A 14 STORY NB NO ACTIVE CONSTRUCTION, SITE CLOSED. I OBSERVED SCAFFOLD MATERIALS STORED ON TOP OF SWS, ALSO @EXPOSURES 1,4&2 LOSE AND/OR NOT TIED-DOWN DEBRIS NETTING CREATING UNSAFE COND #39527209P | Dec 2, 2024 IN VIOLATION | $2,400 |
| Nov 16, 2023 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 14 STORY BUILDING,I OBSERVED ON SUPPORTED PIPE SCAFFOLD WORKERS DOING FOAM AND STUCCO INSTALLATION AND THERE WERE FOAM PARTICLES ON THE STREET AT EXPOSURE #2 ALONG THE ENTIRE B #39523437Z | Feb 25, 2025 IN VIOLATION | $2,500 |
| Jul 19, 2023 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 14 STORY NEW BUILDING AT THE 8 FLOOR LEVEL CONSTRUCTION WORK IN PROGRESS, I OBSERVED THAT THERE WERE NO HORIZONTAL SAFETY NETTING IN PLACE AT THE ENTIRE JOB SITE AND WORKERS WE #39519507N | Jan 28, 2027 | $2,500 |
| Jul 19, 2023 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 14 STORY NEW BUILDING AT THE 8 FLOOR LEVEL CONSTRUCTION WORK IN PROGRESS, UPON REQUEST FOR SITE SAFETY MANAGER TO BE ON SITE TO SUPERVISE SITE SAFETY OPERATION HE WAS NOT ON JO #39519505J | Jan 28, 2027 | $10,000 |
| Jul 19, 2023 | Construction CLASS - 1 AT THE TIME OF MY INSPECTION OF A 14 STORY NEW BUILDING AT THE 8 FLOOR LEVEL CONSTRUCTION WORK IN PROGRESS, I OBSERVED HOIST WAS NOT IN STATE OF READINESS AND BUILDING WAS AT 8 FLOOR LEVEL. THIS CREATES A HAZAR #39519506L | Jan 28, 2027 | $2,500 |
| Jul 11, 2023 | Unknown CLASS - 1 . WORKER COMING DOWN A LADDER FROM 2ND TO 1ST FL SLIPPED AND FALL. WORKER TAKEN TO AN OFFSITE MEDICAL FACILITY. THE PERMIT HOLDER FAILED TO ADEQUATELY NOTIFY DOB WITHIN 3 BUSINESS DAYS OF REQUIRED 16 ITEMS VIA #39519030P | Sep 20, 2023 IN VIOLATION | $1,250 |
| Jul 1, 2023 | Construction CLASS - 1 AT TIME OF MY INSPECTION OF A 14 STORY BUILDING AT 6TH FL LEVEL, BUILDING APPROXIMATELY 23,649 SQ FT. SITE CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE TO ALER #39518658X | Jul 23, 2024 IN VIOLATION | $6,250 |
| Mar 25, 2023 | Construction CLASS - 1 AT TIME OF MY INSPECTION OF A 14 STORY BUILDING AT 2ND STORY, APPROXIMATELY 23,649 SQUARE FEET. SITE WAS CLOSED AND THERE WERE NO CONSTRUCTION ACTIVITY. UPON SHOUTING AT PERIMETER AND BANGING ON FENCE TO ALERT #39514629Z | May 17, 2024 IN VIOLATION | $2,500 |
| Jan 17, 2023 | Construction CLASS - 1 I OBSERVED THAT THE YODOCKS IN THE STREET WERE NOT FILLED WITH WATER/SAND, NOT INTERLOCKED AS PER MANUFACTURES SPECS AND WERE NOT ENCLOSING THE TRAILER AND WALKWAY AS PER CODE TO PROVIDE SAFETY FOR PEDESTRIANS #39511752K | May 8, 2023 IN VIOLATION | $625 |
| Sep 13, 2021 | Unknown CLASS - 1 FAILURE TO MAINTAIN A RECORD OF ORIENTATIONS PERFORMED AT WORKSITE.AT THE TIME OF INSPECTION OF CONSTRUCTION SITE WITH DEMOLITION OF SEVERALBUILDINGS AND ONGOING GRADING AND CLEANUP OPERATIONS INCLUDING OPERATI #35582823L | Jan 26, 2022 IN VIOLATION | $2,500 |
| Issued | Violation | Status |
|---|---|---|
| Aug 16, 1993 | LOCAL LAW 62/91 - BOILERS #20653 | DOB VIOLATION - ACTIVE |
| Issued | Violation | Status |
|---|---|---|
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Sep 18, 2025 | Gas Piping - LL152 FTF-PL-PER Cycle 1, Sub-cycle B (premises is in Community District 5) | Active |
| Issued | Class | Violation | Correct by |
|---|---|---|---|
| Oct 6, 2026 | C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE DOOR. | Oct 20, 2026 |
| Sep 29, 2026 | B | Apt 818 · § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 818, 8th STORY, 2nd APARTMENT FROM NORTH AT EAST | Nov 3, 2026 |
| Sep 8, 2026 | B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR YARD | Oct 13, 2026 |
| Aug 13, 2009 | C | SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR BATHROOM 3RD STORY APT 2 | Aug 19, 2009 |
| Aug 13, 2009 | C | SECTION 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF CONCEALED WATER LEAK CEILING BATHROOM 2ND STORYAPT #1 | Aug 19, 2009 |
| Aug 13, 2009 | C | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING BATHROOM 2ND STORY APT #1 | Aug 19, 2009 |
| Aug 13, 2009 | C | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR EAST WALL 3RD STORY PUBLIC HALL | Aug 19, 2009 |
| Aug 13, 2009 | C | SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR SOUTH WALL 3RD STORY PUBLIC HALL | Aug 19, 2009 |
| Aug 19, 2008 | C | SECTION 27-2031 ADMIN. CODE: PROVIDE HOT WATER AT ALL HOT WATER FIXTURES 3RD STORY APT #2 | Aug 25, 2008 |
| Date | Source | What | Now |
|---|---|---|---|
| Oct 6, 2026 | HPD C | § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE HINGES AT BUILDING ENTRANCE DOOR. | Open |
| Sep 29, 2026 | HPD B | § 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING DEVICE, INSTALLED IN ACCORDANCE WITH DEPARTMENT OF BUILDINGS RULES AND REGULATIONS DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 818, 8th STORY, 2nd APARTMENT FROM NORTH AT EAST | Open |
| Sep 8, 2026 | HPD B | § 27-2010, 2011, 2012 ADM CODE REMOVE THE ACCUMULATION OF REFUSE AND/OR RUBBISH AND MAINTAIN IN A CLEAN CONDITION THE FLOOR YARD | Open |
| Aug 4, 2026 | ECB | Elevators: 5.1.21.1 EMERGENCY SIGNAL CAR PHONE INOPERATIVE.. | Closed |
Always confirm on the city's own systems before acting: DOB BIS property profile · DOB NOW · HPD Online · Pay ECB/OATH penalties (CityPay)
City records as of Nov 2, 2026, 4:31 AM ET. BBL 3036890012.