| Requirement | Due | Status |
|---|---|---|
| Annual parapet observation Check Local Law 126 · By December 31 each year What this isIf the building has a parapet facing a street, sidewalk or other public way, a competent person (such as a mason, engineer or architect) must observe it every year and the owner keeps the report for DOB on request. Detached one- and two-family homes are exempt. Agency page | Dec 31, 2026 in 58 days | Keep the report on file (not filed with DOB) |
| Bedbug annual filing Applies Local Law 69 · December 1 to 31 each year What this isOwners of multiple dwellings file their bedbug infestation history for the prior year with HPD and post or distribute it to tenants. Agency page | Dec 31, 2026 in 58 days | Annual |
| Annual notice: window guards and lead paint Applies HPD / Health Code · January 1 to 16 each year What this isDeliver the annual notice to every unit asking whether a child lives there (window guards for children 10 and under; lead paint for children under 6 in pre-1960 buildings), then follow up on units that don't return it by mid-February. Agency page | Jan 16, 2027 in 74 days | Annual |
| Annual property registration Applies HPD registration · September 1 each year What this isResidential buildings with three or more units, and one- and two-family homes the owner doesn't occupy, register with HPD every year ($13 fee). An unregistered building can't start a nonpayment case in Housing Court and faces civil penalties. Agency page | Overdue | No current registration found |
| Gas piping inspection (2028 cycle) Likely applies Local Law 152 · During 2028 What this isBuildings with gas piping (except one- and two-family homes) need a periodic gas piping inspection by a licensed master plumber every four years. Community district 1 is on the 2028 cycle; certification is filed with DOB after the inspection. Buildings with no gas piping file a certification instead. Agency page | Dec 31, 2028 in 789 days | Next cycle year 2028 |
| Issued | Violation | Hearing | Balance |
|---|---|---|---|
| May 24, 2021 | Construction CLASS - 2 TEMPORARY CONSTRUCTION EQUIPMENT IN PLACE WITH EXPIRED PERMIT - CONSTRUCTION FENCE.AT TIME OF INSPECTION OF 4 STORY NB JOB SITE WAS CLOSED OBSERVED TEMPORARY CONSTRUCTION EQUIPMENT CONSTRUCTION FENCE IN PLACE A #35553482J | Nov 1, 2021 IN VIOLATION | $625 |
| Jun 9, 2020 | Site Safety CLASS - 1 NO DESIGN DRAWINGS FOR ELEVATOR SHAFT PLATFORM. AT TIME OF INSPECTION OBSERVED PLATFORM ERECTED AT 1ST FL OVER ELEVATOR SHAFT. WHEN I REQUESTED DESIGN DRAWINGS FOR PLATFORM NONE WERE PROVIDED OR ON SITE. ELEVAT #35492368J | Dec 1, 2021 IN VIOLATION | $1,250 |
| Jun 9, 2020 | Construction CLASS - 1 HOUSEKEEPING. OBSERVED CONSTRUCTION DEBRIS AT BALCONIES AT EXP#1&3 WHICH CREATES A CONDITION OF WHERE DEBRIS CAN BE KICK OFF OR BLOWN OFF TOPUBLIC OR WORKERS BELOW. NO SIDEWALK SHED AT FRONT OR REAR OF BLDG. #35492369L | Oct 14, 2020 DEFAULT | $6,250 |
| Jun 9, 2020 | Construction CLASS - 1 SEC. 3301.5 UNSAFE CONDITIONS-EGRESS/INGRESS/EQUIPMENT OBSERVED 2 MEN ON BULKHEAD THAT WASNT SECURED & DID NOT EXTEND 3 FEET PAST BULKHEAD WHICH IS REQUIRED PER OSHA 1926. THE 2 MEN ON BULKHEAD WHICH IS REQUIRE #35492371K | Dec 1, 2021 IN VIOLATION | $2,500 |
| Jun 9, 2020 | Construction CLASS - 1 GUARDRAILS. AT TIME OF INSPECTION OBSERVED BALCONIES AT EXP#3 W/NO GUARDRAILS & DOORS TO BALCONIES WERE UNLOCKED & NO CONTROLLED ACCESS ZONEWAS ESTABLISHED AT EXP#1 OBSERVED BALCONIES WHICH DID NOT HAVE MIDRAIL #35492370Z | Dec 1, 2021 IN VIOLATION | $2,500 |
None open.
None open.
None open.